Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹96.2 L
Closing Date
10 Dec 2026, 12:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer R.C.D. Road Division Gumla
Executive Engineer R.C.D. Road Division, Gumla, Jashpur Road, Gumla-835207.
Widening and Strengthening of Ghaghra to Jokari Road via Ranhe, Kundo,Rukighati (Bishunpur) (Total Length-19.100 KM) Under Road Division Gumla
2026_CECOM_120790_1
RCD/Gumla/868/2026-27
Open Tender
Civil Works - Roads
Item Rate
485 days
Ghaghra to Jokari Road via Ranhe, Kundo, Rukighati
Please refer Tender Documents
3 documents required · 3 mandatory
₹10,000
₹96.2 L
Chief Engineer Comm., RCD, Jharkhand Ranchi
7 Nov 2026
7 Nov 2026
14 Dec 2026
12 Nov 2026
10 Dec 2026
12 Nov 2026
10 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A.Cutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres. (i)Girth from 300mm to 600mm
SOR-2.01 A (i) | 274 | No | 504 | ₹1,38,096 |
| 2 | B.Removal of stumps and roots including backfillinbg with suitable material to required compactionRemoval of stumps, roots, staking of serviceable material with all lifts up to a lead of 1000 metres and earth filling in the depression/ pit.(i).Girth from 300mm to 600mm SOR-2.01 B (i) | 274 | No | 305.1 | ₹83,597.4 |
| 3 | A.Cutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres. (ii).Girth from 600mm to 900mm SOR-2.01 A (ii) | 353 | No | 803.6 | ₹2,83,670.8 |
| 4 | B.Removal of stumps and roots including backfillinbg with suitable material to required compactionRemoval of stumps, roots, staking of serviceable material with all lifts up to a lead of 1000 metres and earth filling in the depression/ pit.(ii).Girth from 600mm to 900mm SOR-2.01 B (ii) | 353 | No | 417.4 | ₹1,47,342.2 |
| 5 | A.Cutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres. (iii).Girth from 900mm to 1800mm SOR-2.01 A (iii) | 401 | No | 1,494.8 | ₹5,99,414.8 |
| 6 | B.Removal of stumps and roots including backfillinbg with suitable material to required compactionRemoval of stumps, roots, staking of serviceable material with all lifts up to a lead of 1000 metres and earth filling in the depression/ pit.(iii).Girth from 900mm to 1800mm SOR-2.01 B (iii) | 401 | No | 498.7 | ₹1,99,978.7 |
| 7 | A.Cutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres. (iv).Girth above 1800mm SOR-2.01 A (iv) | 201 | No | 2,989.6 | ₹6,00,909.6 |
| 8 | B.Removal of stumps and roots including backfillinbg with suitable material to required compactionRemoval of stumps, roots, staking of serviceable material with all lifts up to a lead of 1000 metres and earth filling in the depression/ pit.(iv).Girth above 1800mm SOR-2.01 B (iv) | 201 | No | 619.4 | ₹1,24,499.4 |
| 9 | Clearing and Grubbing road landClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness.(i).By Manual means:-A.In area of light jungleSOR-2.03 (i) (A) | 17.05 | Hect | 1,27,329.1 | ₹21,70,961.16 |
| 10 | Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres(i).Lime/ Cement concreteII.By Mechanical means B.Prestressed/ Reinforced cement concrete grade M-20 & above SOR-2.04 II B. | 42.19 | M3 | 1,189.7 | ₹50,193.44 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
SBD.pdf
Tender Documents • 1.39 MB
BOQ_163433.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .