| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 CrAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹10.4 Cr−₹1.6 Cr (13.2%)Rejected-AOC | L2 | Rejected-AOC L2 bidder |
| Sl No | Description | Qty | Unit | M/s Crescent Construction Company L2 | SITCOASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00Food Pavilion 1 - Substructure | |||||
| 1.01 | 2.28.1 Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil | 3,000 | sqm | 15 ₹45,000 Lowest | 32 ₹96,000 |
| 1.02 | 2.33.2 Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 7 | each | 15,000 ₹1,05,000 | 2,250 ₹15,750 Lowest |
| 1.03 | 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 53.26 | cum | 400 ₹21,304 | 250 ₹13,315 Lowest |
| 1.04 | 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 543.02 | cum | 500 ₹2,71,510 | 335 ₹1,81,911.7 Lowest |
| 1.05 | 2.26.1 Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 118.84 | cum | 200 ₹23,768 | 125 ₹14,855 Lowest |
| 1.06 | OD210428/2025-2026 Extra for every additional lead of 1 km beyond initial lead of 50 m of the excavated/ stacked material. All kind of soil | 661.86 | cum | 500 ₹3,30,930 | 150 ₹99,279 Lowest |
| 1.07 | 2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 1,369.42 | cum | 250 ₹3,42,355 Lowest | 290 ₹3,97,131.8 |
| 1.08 | 50.2.25.1 Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 1,301.56 | cum | 1,200 ₹15,61,872 | 950 ₹12,36,482 Lowest |
| 1.09 | 60.65 Providing Z steel sheet pile of size 400x185x7.5/8.5 driving down vertically in lines and levels interlocking with adjacent piles with suitable pile driving unit and all accessories including all labour hire charges etc. complete and as per the directions of departmental officers at site. | 160.26 | sqm | 5,000 ₹8,01,300 Lowest | 19,000 ₹30,44,940 |
Tender Value
₹10.9 Cr
EMD Value
₹5 L
Closing Date
30 Nov 2025, 3:00 pmClosed
Managing Director, KITFRA
KITFRA Head Office, 1st Floor, Saankethika, PF Lane, Pattom palace P.O., Thiruvananthapuram - 695004
Construction of Building for Food Pavilions in Infopark Kochi Phase 2 campus
2025_KSITI_818330_2
KITFRA/IPK/2025-26/22
Open Tender
Civil Works - Buildings
Item Rate
365 days
Infopark Kochi Phase 2 campus
As per Notice Inviting tender
12 documents required · 12 mandatory
₹17,700
Yes
₹5 L
Yes
Infopark Park Centre
13 Mar 2026
3 Nov 2025
1 Dec 2025
3 Nov 2025
30 Nov 2025
17 Nov 2025
3 Nov 2025 - 30 Nov 2025
10 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Food Pavilion 1 - Substructure | |||||
| 1.01 | 2.28.1 Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil | - | sqm | 1.25 | - |
| 1.02 | 2.33.2 Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | - | each | - | - |
| 1.03 | 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | 100 | ₹99.9 |
| 1.04 | 2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1 | cum | 53 | ₹52.95 |
| 1.05 | 2.26.1 Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | - | cum | 10 | - |
| 1.06 | OD210428/2025-2026 Extra for every additional lead of 1 km beyond initial lead of 50 m of the excavated/ stacked material. All kind of soil | - | cum | 11 | - |
| 1.07 | 2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | - | cum | 11 | - |
| 1.08 | 50.2.25.1 Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 1 | cum | 11 | ₹10.99 |
| 1.09 | 60.65 Providing Z steel sheet pile of size 400x185x7.5/8.5 driving down vertically in lines and levels interlocking with adjacent piles with suitable pile driving unit and all accessories including all labour hire charges etc. complete and as per the directions of departmental officers at site. | 1 | sqm | 11 | ₹10.99 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_1371449.xls
BOQ • 0.56 MB
CoC.pdf
Tender Documents • 1.18 MB
Drawings.pdf
Tender Documents • 7.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .