| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18,710.63Accepted-AOC JITPUR NADIA TEHATTA 1 NADIA | NADIA | WEST BENGAL | ₹18,710.63 | 1 | Accepted-AOC 1ST LOWEST |
| 2 | 2₹18,744.38Rejected-AOC | ₹18,744.38 | 2 | Rejected-AOC 2ND LOWEST |
| 3 | 3₹18,746.26Rejected-AOC | ₹18,746.26 | 3 | Rejected-AOC 3RD LOWEST |
Tender Value
₹18,750
Closing Date
1 Jul 2026, 11:00 amClosed
Executive Enginner(A-I), Balurghat(A-I) Division
Uttar Chakbhabani, Balurghat, Dakshin Dinajpur
Repairing and Maintenance of RCC pipe line at Gazipur DTW of Balurghat(A-I) Sub-Division within the jurisdiction of Balurghat(A-I) Division.
2026_WRDD_1028605_5
WBWRDD/EE AI/BLG/NP/02/2026-27
Open Tender
CIVIL WORKS
Percentage
Gazipur DTW
Please refer Tender documents.
3 documents required · 3 mandatory
Yes
31 Jul 2026
22 Jun 2026
3 Jul 2026
22 Jun 2026
1 Jul 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Brick work with 1st class bricks in cement mortar (1:6) In foundation and plinth | 1.26 | Cum | 4,919.88 | ₹6,199.05 |
| 2 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners, as directed and racking out joints or roughening of concrete face including throating, nosing and drip course as necessary at ground floor. 15 mm thick plaster (1:6) | 14.91 | Sqm | 141.48 | ₹2,109.47 |
| 3 | Neat cement punning about 1.5 mm. thick in wall dado, floor, drain, door and window sill etc. complete. | 14.91 | Sqm | 32.72 | ₹487.86 |
| 4 | Removing of Chokage due to sludge, mud, sand or any other forign materials deposition from the underground 450 / 300 /225/ 150 mm dia. R.C.C. Pipe Line
with split bamboo, wire brush, coir rope etc. along with suitable cleaning agent as necessary as per direction of E.!.C. (This item includes cost of earth cutting &
back filling of trenches and required materials for cleaning but excluding the cost for taking out 1 full length of RCC Pipe by dismantling of 2 nos. of Collars & refitting the RCC pipe with new two nos. collar). 225 mm dia. RCC Pipe | 150 | Meter | 38.66 | ₹5,799 |
| 5 | Repairing of leakages in collar joints of R.C.C. Pipe line by opening the joints fully by chipping out the old morter, cleaning the pipe recesses and collar properly, and thereafter positioning and levelling the pipes and collar, filling the annual spaces of joints with jute braiding dipped in cement slurry and grouting with (1:2) cement morter mixed with approved quality water proofing
compound (5% by wt. of cement) and curing all complete as per direction of Engineer-in-Charge. 225 mm dia. R.C.C. Pipe | 10 | Each | 67.89 | ₹678.9 |
| 6 | Additional cost of carriage of constructional materials for construction @ 3% of (i.e It 1 to 05) | 1 | L.S | 458.23 | ₹458.23 |
| 7 | Add GST@ 18.00%(On it no 1 to 6) | 1 | L.S | 2,831.86 | ₹2,831.86 |
| 8 | Add cess@ 1.00% (On It No 1 to 7) | 1 | L.S | 185.64 | ₹185.64 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tendernotice_2.pdf
PDF • 0.93 MB
BOQ_2526520.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].