| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.4 LAccepted-Finance NOT SPECIFIED | ₹2.4 L | L-1 | Accepted-Finance Lowest-1 |
| 2 | L-2₹2.5 L+₹8,310.10 (3.43%)Rejected-Finance VILLAGE FANDHAR PO KALHANI TEHSIL BALICHOWKI DISTT MANDI HP | MANDI | HIMACHAL PRADESH | 175001 | ₹2.5 L+₹8,310.10 (3.43%) | L-2 | Rejected-Finance Lowest-2 |
| Sl No | Description | Qty | Unit | Jitender Kumar L1 | Harish kumar L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. in earth work in all kind of soil such as pick work jumper work, saturated soil including blasting soft/hard rock, chiseling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of bed, stacking the excavated soil clear from the edge of excavation and then returning the excavated soil in 15cm. layers, when required into plinth, side of foundation etc. including consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated soil / earth as directed in all leads and lifts as per direction & best satisfaction of the Engineer-in-Charge. | 15.61 | Cum | 550 ₹8,585.5 Lowest | 560 ₹8,741.6 |
| 2.00 | Providing & laying cement concrete 1:4:8 (1 cement :4 sand: 8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in : foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 2.16 | Cum | 8,100 ₹17,496 Lowest | 8,500 ₹18,360 |
| 3.00 | Providing & laying cement concrete 1:5:10 (1 cement :5 sand:10 graded stone aggregate 40 mm nominal size) with 15% plum and curing complete excluding cost of form work in retaining wall/breast wall, the size of plum shall usually be 150 mm to 300 mm as per HPPWD specification complete within all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 24.3 | Cum | 7,500 ₹1,82,250 Lowest | 7,800 ₹1,89,540 |
| 4.00Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30x30x5 mm so as to give a fair finish including centering shuttering struting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete:- | |||||
| 4.01 | Vertical surface such as wall (any thickness) partition and the like including attached pillasters, buttresses, etc. plinth and string courses complete job in all respect with in all leads and lifts as per the direction and best satisfaction of Engineer-in-Charge. | 76.05 | Sqm | 445 ₹33,842.25 Lowest | 445 ₹33,842.25 Lowest |
Tender Value
₹2.3 L
EMD Value
₹4,700
Closing Date
11 Mar 2026, 10:00 amClosed
EE
Executive Engineer JS Division Baggi Distt. Mandi H.P.
as per BOQ
2026_HPIPH_130095_1
EE-JSD-BGI/2025- 30847-97 dt. 28/02/2026
Open Tender
Civil Works
Item Rate
90 days
Baggi
as per NIT
6 documents required · 6 mandatory
₹500
₹4,700
30 Mar 2026
2 Mar 2026
11 Mar 2026
2 Mar 2026
11 Mar 2026
2 Mar 2026
Excavation in foundation and trenches etc. in earth work in all kind of soil such as pick work jumper work, saturated soil including blasting soft/hard rock, chiseling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of bed, stacking the excavated soil clear from the edge of excavation and then returning the excavated soil in 15cm. layers, when required into plinth, side of foundation etc. including consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated soil / earth as directed in all leads and lifts as per direction & best satisfaction of the Engineer-in-Charge.
Providing & laying cement concrete 1:4:8 (1 cement :4 sand: 8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in : foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge.
Providing & laying cement concrete 1:5:10 (1 cement :5 sand:10 graded stone aggregate 40 mm nominal size) with 15% plum and curing complete excluding cost of form work in retaining wall/breast wall, the size of plum shall usually be 150 mm to 300 mm as per HPPWD specification complete within all leads and lifts as per the direction and satisfaction of Engineer-in-Charge.
Providing form work with steel plates 3.15 mm thick welded with angles iron in frame 30x30x5 mm so as to give a fair finish including centering shuttering struting and propping etc. with wooden battens and ballies height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ- reinforced concrete and plain concrete:-
Vertical surface such as wall (any thickness) partition and the like including attached pillasters, buttresses, etc. plinth and string courses complete job in all respect with in all leads and lifts as per the direction and best satisfaction of Engineer-in-Charge.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
FORM6_10.pdf
Tender Documents • 0.43 MB
TC.pdf
Tender Documents • 0.32 MB
BOQ_192344.xls
BOQ • 1.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .