Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance | ₹5.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹5.0 LAccepted-Finance | ₹5.0 L | L2 | Accepted-Finance L2 |
| 3 | L3₹5.1 LAccepted-Finance | ₹5.1 L | L3 | Accepted-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹11,000
Closing Date
24 Oct 2025, 2:00 pmClosed
Superintending Engineer
SE ECTC SLDC Campus UPPTCL, Lucknow
Repair, Painting Almirah covered of type five Quarter and car Parking shed of colony at Transmission office campus Rampur Garden Bareilly
2025_UPCTL_1077623_1
46/ECTC(L)/2025-26
Open Tender
Civil Works
45 days
SE ECTC SLDC Campus UPPTCL, Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Superintending Engineer, E.C.T.C. Lucknow
₹11,000
22 Jan 2026
26 Sept 2025
25 Oct 2025
26 Sept 2025
24 Oct 2025
26 Sept 2025
FOR REPAIR ,PAINTING,ALMIRAH COVERED OF TYPE FIVE QUARTER AND CAR PARKING SHED OF COLONY AT TRANSMISSION OFFICE CAMPUS, RAMPUR GARDEN, BAREILLY.
Bill of Quantity
FOR REPAIR ,PAINTING,ALMIRAH COVERED OF TYPE FIVE QUARTER AND CAR PARKING SHED OF COLONY AT TRANSMISSION OFFICE CAMPUS, RAMPUR GARDEN, BAREILLY. (G-2)
Rates are based SOR w.e.f. 2024
(a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours.
(b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours.
The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.
(GST Extra )
Conditions:
1.The quantities are tentative and may vary to any extent or deleted during execution as per actual approved lay out plan & site condition.
2.Pozzlona Portland cement confirming to IS 1489(Part 1) 1991 of approved quality like ACC,Ultra-Tech,Birla or equi.shall only be used
3.Overweight steel section within tolerance shall be measured at standard weight and underweight steel section within tolerance shall be measured at actual weight.
4.In case any change in Bill of Quantity is suggested by higher authority that will be binding on the contractor. The agreement shall be executed on the approved Bill of Quantity only.
5.In case of dismantling of civil structure at site, 60% brick work shall be treated as fresh brick, 30% as brick bat & 10% as debris. Fresh brick & brick bat shall be issued to contractor/ firm at prevailing/pertaining SOR.
6.The amount of scrape steel recovered from dismantling shall be issued to contractor/ firm at 1/3rd of rate in prevailing/pertaining SOR
7. Rates in BOQ Are exclusive of GST. Labour Cess shall be borne by contractor.
8. All civil work shall be execute according to the approved drawing of UPPTCL.
9. All civil work shall be carried out as per UPPTCL/UPPWD specifications.
10. Rates quoted by the contractor shall be Inclusive of all charges/contingency that may be encountered at the site. Only GST bill be paid extra as applicable.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.61 MB
Tendernotice_2.pdf
PDF • 0.60 MB
BOQ_1969478.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid