Loading…
Loading…
Tender Value
₹10.0 L
EMD Value
₹9,987
Closing Date
16 Oct 2026, 6:00 pm
Dy.City Engineer
Laying Water Pipe line and Repairing Leakeges at Kharunala, Sodagar ni Pole, Kothi Maholla and other diff. places in Jamalpur Ward.
345054
Central Zone E-Tender Notice No.07/2026-2027 Tender No.59
Open
Civil Works - Others
Works
Ahmedabad
₹900
Municipal Commissioner, Ahmedabad
₹9,987
16 Oct 2026
23 Sept 2026
17 Oct 2026
23 Sept 2026
28 Sept 2026
23 Sept 2026
Name of work :- bægÍtul ltkk sbtjvwh Jtuzo htgFz rJM<thbtkk FtYltk lt¤t , mtuœtdh le vtu¤,ftuXe bntuÕjt <&t yLg søgtyu
vtKele jtRl ltkk jefuSm <ubs sYhegt< bwsc le vtKele lJe jtRl ltFJtltkk ftb (yu.yth.me)
Tender Invited on Behalf of AMC, Central Zone.
Assistant Manager, Central Zone,
Central Zone Zonal Office”, B – Wing,
Third Floor,Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
Signature of Bidder Page 2 of
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
Notice inviting Tender
Competent authority on behalf of Municipal Commissioner of A.M.C. invites percentage rate sealed tenders
from interested contractors for the following work at different locations within the limit of A.M.C.
1 Name of work bægÍtul ltkk sbtjvwh Jtuzo htgFz rJM<thbtkk FtYltk lt¤t , mtuœtdh le vtu¤,ftuXe bntuÕjt
<&t yLg søgtyu vtKele jtRl ltkk jefuSm <ubs sYhegt< bwsc le vtKele lJe jtRl
ltFJtltkk ftb (yu.yth.me)
2 Estimated Tender Amount Rs. 998696.43 (exclusive of GST). GST will be paid extra by AMC/Authority
at prevailing rate to the contractor.
3 Tender fee Rs.900.00
(Non refundable) (Demand Draft in favour of Municipal Commissioner, Ahmedabad)
4 Time Limit 12 Months
5 Download of Tender Tenders from the website www.nprocure.com or shall be down loaded
Documents mentioned AS PER TENDER NOTICE INVITED
6 Required registration Register “E2” class having in Road Works in PWD in Govt. R&B / CPWD / AMC
or equivalent register with any other state Govt. or institutions.
7 Earnest Money Deposit (Bid Rs.99,87.00 (Demand Draft / pay order / Bank Guarantee in favour of
security) Municipal Commissioner, Ahmedabad is to be submitted as prescribed as
(1 % of Estimate put to below. Demand Draft/Bank Guarantee shall be from approved list of AMC of
banks and the issuing branch of bank guarantee shall be of Ahmedabad city
only and it should be valid for for 180 days. ( As Per AMC finance Dept .
Circular No. 5 Dt. 5/5/2007 & F.D. Circular No. 29 Dt. 7/8/2010 &
attched ANNEXURE - 1 finance dept.circular No-40 Dt.05/11/2020.
E.M.D. shall be submitted physically along with the Physical Submission
when applicable.
8 Submission of EMD and Tender Fee & EMD should Submitted physically along with tender
Tender Fees documents as described in the invitation of tender should be submitted to
Assistant Manager- Central Zone, 3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
Bid submitted without bid security & tender fee shall be treated as non
responsive and shall be summarily rejected.
9 Mode of sending the Tender The whole tender shall be submitted by two modes.
Documents • Whole tender shall be submitted only on www.nprocure.com website as
per Schedule mentioned in Notice inviting Tender.
• Tender Fee, EMD, technical bid and other relevant PQ Documents as per
check list given in tender shall be submitted physically in two copies
(Original & duplicate) in sealed envelope as per Schedule mentioned in
Notice inviting Tender.
10 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum. The
Tenders. tenders received after latest schedule date and time will not be
entertained under any circumstances.
11 Submission of Price Bid The Price bid shall be submitted online only. The bidder shall fill
percentage rate on amount of BOQ online only until specified.
Price Bid shall be submitted physically duly signed & seal without
mentioning quoted rated, else it shall be considered as rejected.
12 Opening of Technical bid As per Notice inviting Tender / Addendum / Corrigendum.
13 Tender validity period 120 days from the last date of submission of Tender.
14 Security Deposit 5 % of Contract Value to be submitted in the form of (Demand Draft / pay
order / Bank Guarantee in favour of Municipal Commissioner, Ahmedabad.
Bank Guarantee shall be from approved list of AMC of banks as per attched
ANNEXURE - 1 finance dept. latest circular. and the issuing branch of
Signature of Bidder Page 1 of
Ahmedabad Municipal Corporation
bank guarantee shall be of Ahmedabad City only. The validity of the Security
Deposit shall be up to valid till 90 days beyond Date of completion of work.
The Security Deposit shall be payable in 10 days (for tenders upto Rs.10.0
Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above) from date of receipt
of LOI failing which interest @ 4% per annum will be charged by AMC.
15 Deductions from Running Bills
a. Retention Money 2 % amount of each Running Bill shall be deducted as a Retention Money.
Such retention money shall be released in the final bill of the said work.
b. Labour welfare cess Labour welfare cess as per the Act, 1996 (non refundable) shall be deducted
from each running bill.
16 Defect & Liability Period All general condition of contract of Form B1 condition of contract shall
17 Compansation for Delay 10 % of the actual balance work after Time limit expired.
18 Penalty Clauses As Per SLA Clause,attached in Tender Documents
20 Time permitted to start parts Whenever a work is allotted by Engineering staff, whether minor or major
of work part of any amount, the contractor shall be bound to start the work within
hours so intimation of work. Communication done telephonically via SMS, via
whatsapp and through letter/ E-mail shall be considered legal and binding for
the same. Failure of company to start the works in 48 hours of intimation as
above by contractor. the contractor shall be levied penalty of (1) Rs.1000/-
per day (for tender amounting upto 10 lakh). (2) Rs. 2500/- per day (for
tender amounting above 10 lakh to 30 lakh). (3) Rs. 5000/- per day (for all
tender amounting above 30 lakh). Three time failure by contractor shall
make contractor responsible to be debar unless and otherwise justified
properly in writing/binding within 15 days so flast notice of penalty. and Also
As Per SLA Clause attached in Tender Documents.
• All the circulars which were published by Authorities of AMC time by time will be applicable on said
Tender and bound to bidder with out any condition.
• Conditional tenders will not be accepted in any case. Municipal Commissioner reserves the rights to
reject any or all the tenders without assigning any reasons thereof.
• The authorized signatory holding Power of Attorney shall only be the Digital Signatory. In case
authorized signatory holding Power of Attorney and Digital Signatory are not the same, the bid shall
be considered non-responsive.
• Obey Circular No-03 Date-13-04-2026 of City Engineer Office
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 2 of
Ahmedabad Municipal Corporation
(On contractor’s Letter Head / certified with Stamp and Sign with Contact Detail)
TENDER DECLARATION FORM
Additional City Engineer
Ahmedabad Municipal Corporation,
Name of Work :- bægÍtul ltkk sbtjvwh Jtuzo htgFz rJM<thbtkk FtYltk lt¤t , mtuœtdh le vtu¤,ftuXe bntuÕjt <&t yLg søgtyu vtKele
jtRl ltkk jefuSm <ubs sYhegt< bwsc le vtKele lJe jtRl ltFJtltkk ftb (yu.yth.me)
I/We the undersigned have carefully gone through and clearly understood the Tender documents of above
mentioned project comprising of Notice Inviting tenders, Articles of Agreement, Scope of
work, Definition of terms, notes Instructions/Information to Bidder, Condition of Contract,
special condition of contract, Appendices, Specifications, Bill of Quantities, furnished by
AHMEDABAD MUNICIPAL CORPORATION.
I/We do hereby offer to execute and complete the whole of the work within the time specified all in
accordance with the specification, designs, drawing and instruction in writing referred to in the said
document and with such materials as mentioned for, at the respective rates which I/we have quoted in the
Price Bid or at such other rates as may be fixed under the provisions of these conditions.
In the event of this tender being accepted I/We agree to enter into an agreement and when required,
execute the contract, according to your form 1 of agreement as or in default where of I/we bound
myself/ourselves to forfeit the "Earnest Money Deposit."
I/We understand that if I/We shall not enter in agreement within fifteen days or as decided by AMC
from the date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and take
necessary action as deemed fit.
I/We have enclosed a Demand Draft / Bank Guarantee as an “Earnest Money Deposit", for the sum as
mentioned in NIT, the full value of which is to be absolutely forfeited to the Employer If I/We fail to
commence the work specified. Otherwise the Employer shall retain the said sum, as on account of such
Security Deposit as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other than those that may be approved in accordance with
conditions in the aforesaid documents.
I/We understand that Municipal Commissioner is not bound to accept the lowest or any tender,
which are received. I / We also understand & agree that Municipal Commissioner Reserves the right to allot
number of tenders to successful bidders at his sole discretion in case if I / We am/are lowest in more than one
I/We am/are bound to execute the job if the work order is issued within 120 days from the date of
opening of the tender.
I am bound to execute the work by maintaining all Quality aspects/parameters mentioned in the
tender terms and conditions. I am also bound to submit all supporting Genuine Original documents as and
when asked and if any discrepancy found in such documents as well as in the executed Work with respect to
Quality/Quantity at any stage of work or even after completion of work, it will be solely my Responsibility. I
am bound to prove originality of all documents submitted by me and if any Documents found false/fake then
Municipal Commissioner/AMC has right to take any action/penalty/punishment against me.
I am also bound that if I/we, indulged into any malpractice and/or used any inferior quality and/or the
construction of road is found to be of an inferior quality under this contract than in such case Municipal
Commissioner/AMC has right to debar/ blacklist permanently.
Signature of Bidder Page 3 of
Ahmedabad Municipal Corporation
I/We agree to pay the Government income-Tax, GST/Sales-Tax (Central and State), Octroi duties,
Royalty on material (i.e. Aggregate, Sand etc.) And any other taxes prevailing and from time to time on such
items on which the same are leviable and the rates quoted by me/us are inclusive of the same.
Yours faithfully
Seal and Sign of Contractor
Signature of Bidder Page 4 of
Ahmedabad Municipal Corporation
INSTRUCTIONS TO BIDDERS
1. Scope of Bid
1.1 Competent authority on behalf of The Municipal Commissioner, Ahmedabad Municipal Corporation
(referred to as Employer in these documents) invites sealed bids for the construction of works (as
defined in these documents and referred to as “the work”) detailed in the table given in the Invitation
for Bid (hereinafter called as IFB.) from competent bidder. The bidders may submit bids for the works
detailed in the table given in IFB.
2.0 Source of Funds
Ahmedabad Municipal Corporation has arranged the fund for this project.
3.0 Eligible Bidders
3.1 The Invitation for Bids is open to all eligible bidders meeting the eligibility criteria as defined in this
3.2 All bidders shall provide Qualification Information and Forms of Bid mentioned in the Clause-14. An
agency that has been engaged by the Employer to provide consulting services for the preparation or
supervision of the works, and any of its affiliates, shall not be eligible to bid.
3.3 Any entity which has been declared as non-performing by NHAI / GoG / AMC or the firms those are
blacklisted/ debarred for specified period by AMC, Governement of Gujarat, Government of India or
any other entity controlled by it, would not be eligible to submit the Bid.
4.0 Qualification of the Bidder
4.1 Requires registration:- Register as per Notice Inviting Tender having in Road Works in PWD in Govt.
R&B / CPWD / AMC or equivalent register with any other state Govt. or institutions.
5.0 DISQUALIFICATION
Even though the bidders meet the above mentioned qualifying criteria, they are subject to be
disqualified if they have,
• Made misleading or false representations in the forms, statements, affidavits and attachments
submitted in proof of the qualification requirements; and/or
• Record of poor performance such as abandoning the works, not properly completing the contract,
inordinate delays in completion, litigation history, or financial failures etc. or debarring from AMC
• Tampered the bid document in any manner.
• Colluded with other prospective bidders for this work to arrive at quoted prices for the purpose of
restricting competition.
• Indulged in inducement of any official of AMC and/or their consulting engineer and other advisors
in any manner whatsoever.
• Proposal not submitted in accordance with this tender.
• During validity of the proposal, or its extended period, if any, the bidder changes his commercial
• The bidder qualifies the proposal with his own conditions.
• Proposal is received after due date and time.
• Commercial proposal is enclosed with the same envelope as technical proposal
• The envelope does not show on the outside the reference of bid and thus gets opened before
the due date of opening.
• The E.M.D. is not deposited in full and in the manner as specified in the clause of Earnest
Signature of Bidder Page 5 of
Ahmedabad Municipal Corporation
• The tender is in a language other than English or dose not contains its English Translation in
case of other language adopted for tender preparation.
• The tender documents received are not duly signed by authorized person.
• The validity of tender is less than what is stated in the tender.
• Any of the page or pages of tender is/are removed or replaced.
• Any condition which affect the cost.
• If it is joint venture.
5.1 Debarment / Black listing
Not with standing the above, the Employer may debar or blacklist any of the bidder(s) for their
misleading or false representations in the forms statements etc. for the period to be decided by the
6.0 Cost of Bidding
The bidder shall bear all costs associated with the preparation and submission of his Bid. Employer
will in no case be responsible and liable for those costs.
The Bidder, at his own cost, responsibility and risk, is encouraged to visit, examine and familiarize
himself with the site of Works and its surroundings including source of earth, water, road aggregates
etc. and obtain all information that may be necessary for preparing the Bid and entering into a
contract for construction of the Works. The costs of visiting the Site shall be at the Bidder's own
8.0 Bidders shall not have any dispute or claim for any kind of compensation in case of,
• If the quantity stipulated in the tender items varies or the scope of work changes and thereby total
amount of work increases / decreases up to any extent.
• If the works gets delayed / postponed for some administrative / technical decision whatsoever.
• If the items stipulated in the tender shall not be executed as per site condition/ requirements. No
claim shall be entertained for the same.
• No idle charges shall be paid to contractor for machinery and man power if remain idle and no claim
shall be entertained for the same.
B. BIDDING DOCUMENTS
9.0 Content of Bidding Documents
9.1 The set of bidding documents comprises the documents listed below and addendum (if any) issued.
1. Notice inviting e-Tender
2. Special conditions of Contract
3. Instructions to Bidders
4. Qualification Information
5. Conditions of Contract
6. Technical Specifications
7. Forms of Bid
8. Bill of Quantities
• The bidder is expected to examine carefully all instructions, conditions of contract, contract data,
forms, terms, technical specifications, forms, Annexes in the bid document. Failure to comply with the
requirements of bid documents shall be at the bidder’s own risk. Bids which are not substantially
responsive to the requirements of the bid documents shall be rejected.
10.0 Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding documents by
issuing addendum.
Signature of Bidder Page 6 of
Ahmedabad Municipal Corporation
10.2 Any addendum thus issued shall be part of the bidding documents and shall be placed on website
www.nprocure.com The prospective bidder shall refer to website to check any addendum before
hours of opening of bids. AMC will not give any advertisement for the same.
10.3 To give prospective bidders reasonable time in which to take an addendum into account in preparing
their bids, the Employer may, at his desecration, extend as necessary the deadline for submission of
10.4 Prospective bidders should attach the addendum made for the work & if fails to do so than also the
changes made through such addendum shall be applicable & bound to the bidder.
C PREPARATION OF BIDS
11.0 Language of the Bid
All documents relating to the bid shall be in the English language only.
12.0 Documents comprising bid
The e bid submitted by the bidder shall be in two separate parts.
• Technical Bid
• Financial Bid
To qualify for award of the contract, each bidder must submit the following documents along with
• Required Registration Certificate
• Other requested documents
• Any other material / information required to be submitted in accordance with these
Instructions to Bidders (ITB)
Failure to submit these certificates/documents shall make the bid non-responsive.
Above original documents in physical form in two copies, one marked as “original” and other marked
as “Duplicate”, shall be submitted in a sealed envelope by 18:00 Hrs on the date of physical
submission of bid and addressed to the addressee given in the NIT duly super scribed “Name of Work,
Bid due date and time, Name and address of the bidder”
13.0 Bid Prices
• The contract shall be for the whole works as described in Bill of Quantity based on the percentage
rate in the Bill of Quantities submitted by the bidder..
• All duties, taxes, and other levies payable by the contractor under the contract, or for any other cause
shall be included in the rates, prices and total Bid Price submitted by the Bidder, except otherwise
stated in the Bid document. Employer will not compensate the bidder (contractor) for any change
in duties, taxes and other levies payable by the contractor under the contract and any other reasons.
• The percentage rate and bid price quoted by the bidder shall be fixed up to the completion of Work
and shall not be subject to adjustment on any account, except where expressly specified, otherwise,
in the contract.
14.0 Currencies of Bid and Payment
The currency of bid and payment shall be in Indian Rupees. All payments shall be made in Indian
15.0 Bid Validity
15.1 Bids shall remain valid for 120 days from last date of submission of tender. A bid valid for a shorter
period shall be rejected by the Employer as non-responsive.
Signature of Bidder Page 7 of
Ahmedabad Municipal Corporation
15.2 In exceptional circumstances, prior to expiry of the bid validity (120 days), the Employer may request
that the bidders may extend the period of validity for a specified additional period. The request and
the bidders' responses shall be made in writing or by cable. A bidder may refuse the request without
forfeiting his bid security. A bidder agreeing to the request will not be required or permitted to
modify his bid, but will be required to extend the validity of his bid security for a period of the
16.0 Earnest Money / Bid Security
16.1 The Bidder shall furnish, a Bid Security of the amount as shown in the Table of IFB as part of his bid, in
the form of Demand Draft / pay order / Bank Guarantee in favour of Municipal Commissioner,
Ahmedabad valid for 120 days.
16.2 The issuing branch of the bank guarantee shall be of Ahmedabad City only
Signature of Bidder Page 8 of
Ahmedabad Municipal Corporation
Signature of Bidder Page 9 of
Ahmedabad Municipal Corporation
Signature of Bidder Page 10 of
Ahmedabad Municipal Corporation
16.3 Any bid not accompanied by an acceptable Bid Security shall be rejected by the Employer as non-
16.4 Any bid having bid security for lesser value and shorter validity period shall be treated as non-
16.5 (a) The bid security of the unsuccessful bidders, except for L1, L2 and L3 bidders will be returned as
promptly as possible.
(b) The bid security of the successful bidder, along with second and third lowest tenders, will be
returned when the successful bidder has furnished the required security deposit and signed
16.6 The Bid Security of the Successful Bidder will be discharged when the bidder has signed the
Agreement and furnished the required security deposit.
16.7 The Bid Security shall be forfeited,
a) if the Bidder withdraws the Bid after Bid opening during the period of Bid validity;
b) in the case of a successful Bidder, if the Bidder fails within the specified time limit to
(i) sign the Agreement; or
(ii) Furnish the required security deposit.
(iii) commence the work after signing the agreement within 15 days
16.8 No interest shall be paid by the owner on any tender guarantee. The issuing branch of the bank
guarantee shall be of Ahmedabad City only.
16.9 Bank Guarantee for Earnest Money Deposit should be executed on non-judicial Stamp papers of
requisite value in accordance with the stamp Act applicable to that particular state of Indian Union,
where executed.
16.10 The executing officers of the bank Guarantee for Earnest Money Bid Security shall clearly indicate in
(block letters) his name, designation, Power of Attorney No. / Signing Power No. etc.
16.11 Each page of the bank guarantee for Earnest Money Deposit shall be duly signed/initialed by the
executing officers and the last page shall be signed in full, indicating the particulars as aforesaid under
the seal of the Bank.
D. SUBMISSION OF BIDS
17.0 Sealing and Marking of Bids
17.1 The bidder shall submit the Technical Bid only. The Bid shall be sealed in separate envelopes and the
three sealed envelopes shall be sealed in an outer envelope. The Bid envelopes shall be marked as
• Complete Tender Document with all necessary qualification related documents (in two copy)
Above two envelopes shall be kept in one envelope and it should be marked as “Technical Bid” and
sealed. This Outer envelope should mention the name of firm of bidder, his address, contact details &
name of the work.
17.2 The inner and outer envelopes
a) Shall be addressed to the Employer at the following address:
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Signature of Bidder Page 11 of
Ahmedabad Municipal Corporation
Danapith, Ahmedabad-380001.
c) Bear the following identification:
Indicate the name and address of the bidder.
• If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility
for the misplacement or premature opening of the bid.
18.0 DEADLINE FOR SUBMISSION OF THE BID
18.1 Complete Bids (including Technical bid and necessary documents) must be received by the Employer
at the address specified in bid information not later than the date indicated on the face sheet of the
document. In the event of the specified date for the submission of bids declared a holiday for the
Employer, the Bids will be received up to the appointed time on the next working day. The Bidder is
further required to submit Documents in Physical Form on or before the Bid Due Date and before the
time of submission as specified in NIT, at the following address:
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
18.2 AMC assumes no responsibility for inability of a bidder to submit bids through (n) procure e-tendering
portal on account of delay in submission at bidder's end. Bidder shall ensure that they submit the bid
well before the "Due Date & Time of Bid- Submission". AMC shall not be responsible if bidder is not
able to submit the bid on account of failure in network/internet connection or any other technical
18.3 The Employer may extend the deadline for submission of bids by issuing an amendment in
accordance with respective Clause, in which case all rights and obligations of the Employer and the
bidders previously subject to the original deadline will then be subject to the new deadline.
18.4 All bidders are requested to see the website of (n) procure for amendment / corrigendum if any.
18.5 Any Bid received by the Employer after the deadline prescribed in NIT will be rejected and returned
unopened to the bidder.
Any Bid received by the Employer after the deadline prescribed in NIT will be returned unopened to
20.0 NOTIFICATION OF AWARD & SIGNING OF AGREEMENT
The Bidder whose Bid has been accepted will be notified of the award by the Employer prior to
expiration of the Bid validity period by writing, facsimile or e-mail confirmed by registered letter. This
letter (hereinafter and in the Conditions of Contract called the “Letter of Acceptance” will state the
sum that the Employer will pay the Contractor in consideration of the execution, completion, and
maintenance of the Works by the Contractor as prescribed by the Contract (hereinafter and in the
Contract called the “Contract Price”).
The notification of award will constitute the formation of the Contract, subject only to the furnishing
of a Security Deposit in accordance with the provisions of Clause.
The agreement will incorporate all correspondences between the Employer and the Successful
Bidder. It will be signed by the Employer and the Successful Bidder.
21.0 SIGNING OF CONTRACT AGREEMENT
21.1 The Employer and the successful bidder shall enter into a Contract Agreement within 28 days after
the successful bidder (hereinafter called the Contractor) receives the Letter of Acceptance, unless
they agree otherwise, subject to furnishing the security deposit before signing the Agreement with
Signature of Bidder Page 12 of
Ahmedabad Municipal Corporation
21.2 Upon issue of ‘Letter of Acceptance’ to the successful Bidder, the Employer will promptly notify the
other Bidders that their Bids have been unsuccessful and release their Earnest Money Deposit / Bid
22.0 SECURITY DEPOSIT
22.1 Within 15 days of receipt of the Letter of Acceptance, the Successful Bidder shall deliver to the
Employer a security deposit in the form of Bank Guarantee for an amount equivalent to 3% of the
Contract Price valid for the period of valid till 90 days beyond Date of completion of work. The
Security Deposit shall be payable in 10 days (for tenders upto Rs.10.0 Lacs) or 15 days (for tenders of
Rs.10.0 Lacs and above)from date of receipt of LOA failing which interest @ 4% per annum will be
charged by AMC.
22.2 The security deposit shall be in the form of a Bank Guarantee in the name of the Employer, from
Ahmedabad branch of any Banks mentioned in the clause no. 16.2 of these tender documents.
22.3 This security deposit shall be released only after the clearance of final bill including pre & post Audit.
22.3 Interest @ 4 % per annum shall be deducted from contractor in case of late submission of security
deposit or late renewal of bank guarantee for the number of days delayed for submission or
discontinuity of the bank guarantee.
22.4 Bank Guarantee to be submitted in the prescribed format enclosed and shall be same verbatim as per
the format. Bank Guarantee shall be submitted on right value of stamp paper and for correct value of
22.5 Failure of the Successful Bidder to comply with the requirements of Sub-Clause 22.1 shall constitute
sufficient grounds for cancellation of the award and forfeiture of the Bid Security.
22.6 In case of any contract amendment during execution of the contract enhancing value of the contract
the BG value shall be enhanced accordingly. Validity of BG shall be commercial terms and conditions
22.7 All compensation or other sums of money payable by the Contractor to the Employer under the terms
of this Contract or any other contract or on any other account whatsoever may be deducted from
Security Deposit. Also in the event of the Contractor's Security Deposit being reduced by reasons of
such deductions, as aforesaid, the Contractor shall, within 14 days of receipt of notice of demand
from the Engineer-in-Charge, make good the deficit in Security Deposit.
22.8 Should there arise any occasion under the Contract due to which the periods of validities of Bank
Guarantees as may have been furnished by the Contractor from time to time, are required to be
extended/renewed, the Contractor shall get the validity periods of such guarantees
extended/renewed, and furnish these to the Engineer-in- Charge one month before the expiry date of
the aforesaid Guarantees originally furnished failing which the existing Bank Guarantees shall be
invoked by the Engineer – in – charge. Also in case of any deficit in securities on any account as might
occur or is noticed, the Contractor shall forthwith recoup/replace the same with acceptable Security
22.9 The Bank Guarantee shall be extended within the expiry dates wherever activities as per contract are
not completed in all respects.
22.10 The Security Deposit less any amount due shall, on demand, be returned to the contractor after
days of completion date / Final Bill paid date which ever is later. No interest on the amount of
Security Deposit shall be paid to the Contractor at the time of release of Security Deposit as stated
22.11 The successful bidder to whom ‘LOA’ has been issued shall enter into an agreement at Employer’s
office within 15 days of LOA.
23.0 Advance Payment and Security
The Employer will not provide any advance payment.
Signature of Bidder Page 13 of
Ahmedabad Municipal Corporation
24.0 Dispute Review Expert
In case of all the disputes, decision of the Municipal Commissioner, Ahmedabad shall be final and
binding to the bidder.
25.0 LITIGATION HISTORY
The applicant should provide accurate information on litigation and/or arbitration resulting from
Contractors completed or under execution by him over last five years. If the details of Litigation
History are hidden by the Bidder and later on it comes to the knowledge of the Employer, the Bidder
shall be disqualified for the proposed work and other appropriate actions shall be taken against the
DETAILS OF COMPLETED / ONGOING LITIGATION / ARBITRATION
Employer Value of the Reasons/Details for Remarks showing
Year Name of Project (Rs.) litigation/arbitration Present Status
The bidder shall furnish separate table for individual project.
The above information shall be supported with necessary documents otherwise the same shall be
treat as null and void.
A consistent history of arbitration awards? Judgments against the applicants or any partner of a joint
venture may result in disqualification for proposed work.
If the details of litigation History is hidden by the applicant and later on it comes to knowledge of the
employer the bidder shall be disqualified for the proposed work and other appropriate actions shall
be taken against the bidder.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 14 of
Ahmedabad Municipal Corporation
GENERAL CONDITIONS OF CONTRACT
1.0 Liquidated Damages
1.1 If the Contractor fails to complete the works within the original or extended time limit, the Contractor
shall pay penalty of 10% of amount of actual remaining work. The amount of work for which the
scope of contractor is reduced shall not be considered for the calculation of Liquidated Damages.
1.2 Conditions mentioned in the AMC Finance Department Circular AMC no. 18 Date: 23/05/2017 and all
latest Circulars shall be applicable.
2.0 Retention Money
2 % amount of each Running Bill shall be deducted as a Retention Money. Such retention money shall
be released in the final bill of the said work. AMC reserves right to deduct any amount to compensate
the poor performance of the contractor i.e. poor quality or abandoned / incomplete work.
3.0 Subcontracting
3.1 Except where expressly specified in the Contract, the Contractor shall not subcontract any portion of
Work without the approval of the Employer’s Representative. Any subcontracting shall not relieve the
Contractor from any contractual obligations or responsibility under the Contract.
3.2 The Contractor shall not be required to obtain consent for a subcontract for which the name of the
subcontractor and scope of works activities to be performed by him is already stated in the contract
or supply of material or engagement of labour.
4.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel as referred to in
the Bid document to carry out the functions stated in the Schedule or other personnel approved by
the Engineer. The Engineer will approve any proposed replacement of key personnel only if their
qualifications, abilities, and relevant experience are substantially equal to or better than those of the
personnel listed in the Schedule.
4.2 If the Engineer asks the Contractor to remove a person, without assigning reasons thereof, for his
misconduct or inadequacy of technical skills and experience, who is a member of the Contractor’s
staff or his work force, the Contractor shall ensure that the person leaves the Site within seven days
and has no further connection with the work in the Contract.
4.3 No residential accommodation is allowed at the site of work. The labour huts shall not be erected on the
site of work and contractor shall make his own arrangements to provide such accommodations as per
the rules of the local bodies. He shall make his own arrangements for housing, stores, field office etc.
He shall submit a site layout plan indicating the location of various site facilities to be created by him
at his cost for the execution of work. The Owner shall in no way be responsible for any delay on this
account and no claim on this account whatsoever shall be entertained. All Basic amenities shall be
provided by the Contractor to Labours as per the prevailing labour Laws.
5.1 The Contractor shall have full regard throughout execution, completion and defects liability period to
following safety aspects and shall take all necessary steps to ensure that danger to safety is avoided
all the time in respect of,
Safety of the works
• Safety of the Contractor’s employees and all the persons directly or indirectly engaged by him
• Safety of all the employees including persons working on other contracts of Employer at the
same site of the Employer and Engineers employees engaged at work site.
• Any authorized third party persons on the site.
Signature of Bidder Page 15 of
Ahmedabad Municipal Corporation
• Contractor’s plant and equipment
5.2 The Contractor shall provide and maintain at his costs all lights, guards, fencing, warning signs,
barricading, and cones; when and where necessary, or required by Engineer in Charge or by any duly
constituted authority for the protection of the works or for the safety and convenience of the public
5.3 The Contractor shall take all reasonable steps to protect the environment on and off the site and
avoid damage or nuisance to persons or property of the public and others arising as a consequence of
his method of operation.
5.4 The Contractor shall maintain in good condition all work throughout execution, completion, and
defects liability period. The contractor shall be responsible for and to make good all injuries, damages
and repairs, rendered necessary by fire, rain, traffic, floods or other causes.
5.5 All the scaffolding work, wherever required for the execution of work, shall be provided by the
contractor. Nothing extra shall be payable on this account. It shall be provided strictly with double
scaffolding system with all the accessories etc. with adjustable suitable working platforms to access
the areas, with ease for working and inspection. It shall be designed to take all incidental loads. It
should cater to the safety features for workmen. It shall be ensured that no damage is caused to any
structure due to scaffolding.
5.6 All temporary warning/ caution boards display shall be provided and displayed during day as well as
night time by the contractor, wherever required and as directed by the Engineer.
5.7 Arrangement of temporary water and electricity and telephone connection required, by him, shall be
made by the Contractor at his own cost and also necessary permissions directly from relevant Owners
shall be obtained by him under intimation to the Owner. Also all initial and running charges and
security deposit, if any in this regard shall be borne by him. The Contractor shall abide by all the rules/
bye laws applicable in this regard and he shall be solely responsible for any penalty on account of
violation of any of the rules and byelaws in this regard.
5.8 In any case if any fatal accident (major or minor) occurs due to poor safety precautions, the same
shall be completely contractor’s responsibility. All the losses due to such accidents and expenses of
legal matters shall be borne by contractor.
5.9 The Contractor shall be responsible for maintenance and watch and ward of the complete installation
and shall also be responsible for any pilferage, theft, damage, penalty etc. in this regard. The
Contractor shall indemnify the Owner against any claim arising out of pilferage / theft, damage,
penalty etc. whatsoever on this account.
5.10 The Contractor shall depute Site Engineer & skilled workers as required for the work. Necessary
protective and safety equipments shall be provided to them by the Contractor at his own cost and
6.0 Contractor to keep site clean:
During the execution of the work, the Contractor shall keep the site clean. All wreckage rubbish,
excess materials, temporary works no longer required will be removed from site immediately.
7.0 Clearance of site on completion:
The Contractor shall clear away and remove all Contractors equipment, surplus materials, rubbish,
temporary works of every kind.
A. COST CONTROL
8.0 Bill of Quantities
a. The schedule-B shall contain Memorandum showing items for the construction, installation,
testing, and commissioning work to be done by the Contractor.
Signature of Bidder Page 16 of
Ahmedabad Municipal Corporation
b. The quantities stated in the schedule B are estimated quantities. The Contractor shall be paid only
quantities calculated after taking measurements of executed work. The rate stated in the
schedule B for each item of work shall apply. The works shall be measured by the Contractor
jointly with the authorized representative of the Engineer and all particulars required by the
representative of the Engineer shall be supplied by the contractor.
c. The work shall be measured net. No allowance for general or local custom, working space etc. is
9.1 The Engineer in Charge shall have power to make any variation of form, quality or quantity of the
works or any part thereof that may, in his opinion, be necessary and for that purpose, or if for any
other reason it shall, in his opinion, be appropriate, he shall have the authority to instruct the
Contractor to do and the Contractor shall do any of the following:
Increase or decrease the quantity of any work up to any extent included in the contract,
Omit any such work,
Change the character or quality or kind of any such work,
Execute additional work of any kind necessary for the completion of the Works or
Change any specified sequence or timing of construction of any part of work.
9.2 No such variation shall in any way vitiate or invalidate the contract, but the effects, if any, of all such
variations shall be valued in accordance with the following sub clauses. Provided that where the issue
of an instruction to vary the Works is necessitated by some default or breach of contract by
contractor or for which he is responsible, any additional cost attributable to such default shall be
borne by the Contractor.
9.3 The Contractor shall not make any such variation without an instruction of the Engineer. No
instruction is required for quantities varying from those provided for the items in the contract
10.1 The basis for the valuation of variations for addition to the Contract Price shall be as follows in the
same order of priority.
a) Variations in the quantities of work in schedule of quantities shall not vitiate the contract.
b) The contractor shall be bound to execute extra items of work as directed by the Engineer-in-
c) Contract unit rates for individual items shall apply to varied quantities where there is a quantity
d) The price variations on extra item will not be given.
e) In case of other non tender items following procedure shall apply.
10.2 If any extra item crops up during the progress of work the same shall be carried out by the Contractor
and he shall be paid at the rate fixed by Employer which shall be fixed as lowest of the rates derived
by rate analysis based on the following three methods. , the priority of the documents forming the
Contract shall be as follows:
(i) If the extra item is included in the S.O.R. of Road & Building Department, Year 2013-14, the rate
of extra item shall be that rate and premium (above or below) quoted by contractor.
(ii) Rate analysis based on prevailing Govt. of Gujarat’s SOR rates.
(iii) Rate analysis based on current market rates. This shall be based on
The material costs, the labour costs, the cost of use of all plant, machinery and equipment,
the cost of all temporary and incidental works, the overheads and the Contractors profit.
The overheads shall be taken at 5 % of the sum of material costs, the labour costs, the cost of
use of all plant, machinery, and equipment, the cost of all temporary and incidental works.
10.3 In case of the rate is to be derived from prevailing market rate, the Contractors profit shall be taken at
10 % of the final rate derived.
Signature of Bidder Page 17 of
Ahmedabad Municipal Corporation
10.4 In the event of disagreement, the Engineer in Charge shall fix such rates and prices as are, in his
opinion appropriate and shall notify the Contractor accordingly with a copy to the Employer.
10.5 The Engineer shall determine provisional rates and prices to enable on account payments to be
included in the Interim Payment Certificates, until rates and prices are agreed as final by the
Employer, the Contractor, and the Engineer.
10.6 The Contractor shall not be entitled to additional payment for costs, which could have been avoided
by giving early warning.
11.1 Payments shall be adjusted for deductions for advance payments, retention, other recoveries in terms
of the contract and taxes at source, as applicable under the law. The Employer shall pay the
Contractor the amounts certified by the Engineer.
11.2 If an amount certified is increased in a later date certificate due to corrections in previous certificates
or as a result of an award from disputes review experts, Contractor shall be paid such amount only.
The Contractor shall not be paid any interest upon such delayed payment.
11.3 Items of the work for which no rate or price has been entered in will not be paid for by the Employer
and shall be deemed covered by other rates and prices in the Contract.
11.4 All payments shall be made in Ahmedabad.
12 Taxes and duties
12.1 The rates are inclusive of all the prevailing taxes and duties of the Central, State and Local Governing
bodies prevailing on the date of award of the contract. The Contractor will have to pay all such taxes
and duties for the performance of this Contract. The Employer will deduct from the Contractor’s
monthly and other payments all taxes and duties, which he is bound to recover in accordance with
the applicable law.
12.2 The Contractor shall keep himself fully informed of all acts and laws of the Central & State and local
Governing bodies, all orders, decrees of bodies, tribunals having any jurisdiction or authority which in
any manner affect those engaged or employed, and anything related to carrying out the work. All the
bye-laws lay down by AMC/AUDA and any other local bodies while executing the work shall be
adhered to. All taxes of local bodies shall be borne by the contractor. The Contractor shall arrange to
give all notices required by any authority and to pay to such authority all the fees that may have to be
paid for the material, plants, equipments etc. The Contractor shall also adhere to all traffic restrictions
notified by the local authorities. He shall protect and indemnify the Owner and its officials &
employees against any claim or liability arising out of violations of any such laws, ordinances, orders,
decree, whether by himself or by his employees or his authorized representatives. Nothing extra shall
be payable on these accounts.
13.0 Labour Welfare Cess
As per circular No. GHR/2005/04/CWA/2004/841/M-3 dt. 3/1/05 and G.R. No. CWA/2004-1831-M(3)
dt. 9/12/05 issued by G.O.G. (non-refundable) shall be deducted from every bills which shall be
deposited to Govt. Labour Department for Labour welfare fund.
14.0 Currencies
All payments shall be made in Indian Rupees.
15.0 Advance Payment
No Advance Payment shall be made.
Signature of Bidder Page 18 of
Ahmedabad Municipal Corporation
16.0 Cost of Repairs
Loss or damage to the Works or Materials to be incorporated in the Works between the Start Date
and the end of the Defects Correction periods shall be remedied by the Contractor at the Contractor's
cost if the loss or damage arises from the Contractor's acts or omissions.
B. FINISHING THE CONTRACT
17.0 Completion
The Contractor shall request the Engineer to issue a Certificate of Completion of the Works and the
Engineer will do so upon deciding that the Work is completed.
18.0 Termination
18.1 The Employer shall be entitled to terminate the contract if the contractor:
(a) Fails to carry out any obligation under the contract.
(b) Without reasonable excuse fails –
1. To commence the works on site within the period stated in the Appendix to Bid after receipt
by him of a Notice to this effect from the Engineer/Employer after signing the agreement or
2. To proceed with the works, or any section thereof, within 28 days after received notice
3. Has failed to comply with a notice issued or an instruction issued within 28 days after having
4. Abandons the works or otherwise plainly demonstrates the intention not to continue
performance of his obligation under the contract.
5. Sub-contracts the works or assigns the contract without the specific prior written permission
of the engineer.
6. Has failed to furnish the required securities or extension thereof in terms of the contract.
7. Becomes bankrupt or insolvent, goes into liquidation, has a receiving or administration order
made against him, compounds with his creditors, or carries on business under receive, trustee
or manager for the benefit of his creditors, or if any act is done or event occurs which (under
applicable Laws) has a similar effect to any of these acts of event.
18.2 In any of these events or circumstances, the Employer may, upon giving 14 days notice to the
contractor, terminate the contract and expel the contractor from the site. However, in the case of
sub-paragraphs (h), the Employer may be notice terminate the contract immediately.
18.3 The Employer’s decision to terminate the contract shall not prejudice any other rights of the
Employer, under the contract or otherwise.
18.4 After termination, the Employer may complete the works and/or arrange for any other entities to do
so. The Employer and these entities may then use any goods, contractor’s documents and other
design documents made by or on behalf of the contractor.
18.5 The Employer or the Contractor may terminate the Contract if the other party causes a fundamental
breach of the Contract.
18.6 Fundamental breaches of Contract include, but shall not be limited to the following:
(a) the Contractor stops work for 14 days when no stoppage of work is shown on the current
Program and the stoppage has not been authorized by the Engineer;
(b) the Employer or the Contractor is made bankrupt or goes into liquidation other than for a
reconstruction or amalgamation;
(c) The contractor fails to fulfill requirements;
(d) the Engineer gives Notice that failure to correct a particular Defect is a fundamental breach of
Contract and the Contractor fails to correct it within a reasonable period of time determined by
(e) the Contractor does not maintain a security which is required;
(f) the Contractor has delayed the completion of works by the number of days for which the
maximum amount of liquidated damages becomes payable as defined in the Contract data;
(g) if the Contractor, in the judgment of the Employer has engaged in corrupt or fraudulent practices
in competing for or in the executing the Contract.
Signature of Bidder Page 19 of
Ahmedabad Municipal Corporation
(h) For the purpose of this paragraph: “corrupt practice” means the offering, giving, receiving or
soliciting of anything of value to influence the action of a public official in the procurement
process or in contract execution. “Fraudulent practice” means a misrepresentation of facts in
order to influence a procurement process or the execution of a contract to the detriment of the
Borrower, and includes collusive practice among Bidders (prior to or after bid submission)
designed to establish bid prices at artificial non-competitive levels and to deprive the Borrower of
the benefits of free and open competition.”
18.7 When either party to the Contract gives notice of a breach of contract to the Engineer for a cause
other than those listed above, the Engineer shall decide whether the breach is fundamental or not.
18.8 Notwithstanding the above, the Employer may terminate the Contract for convenience.
18.9 If the Contract is terminated the Contractor shall stop work immediately, make the Site safe and
secure and leave the Site as soon as reasonably possible and handover the site to the Employer
including all materials and plant and equipment existing there upon.
19.0 Contractor's own responsibility
The contractor is to set out and level the works and will be responsible for the accuracy of the same.
He shall also be responsible for the correctness of the positions, levels, dimensions, and alignment of
all parts of the structures as per instructions given to him. If at any time any error shall appear during
the progress of any part of the work, the contractor shall at his own expense rectify such error if called
upon to the satisfaction of the Engineer in charge.
20.0 Overpayment & Underpayment
20.1 Whenever any claim Fifths payment of a sum to the Municipal Corporation arises out of or under this
Contract against the contractor the same may be deducted by the Municipal Corporation from any
sum then due or which at any time thereafter may become due to the contractor under this contract
and failing that under any other contract with the Municipal Corporation or from any sum due to the
contractor with the Municipal Corporation (which may be available with Municipal Corporation), or
from his retention money, or he shall pay the claim on demand. The Municipal Corporation reserves
the right to carry out post payment audit and technical examination of the final bill including all
supporting vouchers, abstracts, etc.
20.2 The Municipal Corporation further reserves the right to enforce recovery of any over payment when
detected notwithstanding the fact that the amount of the final bill may be included by the Contractor.
20.3 If as a result of such audit and technical examination any over payment is discovered in respect of any
work done by the Contractor or alleged to have been done by him under the contract, it shall be
recovered by the Municipal Corporation from the contractor by way of all the means prescribed above
or if any under payment is discovered by the Municipal Corporation, any amount due to the
contractor under this contract or under payment may be adjusted against any amount then due or
which may at any time thereafter become due before payment is made to the contractor from him to
the Municipal Corporation on any other contract account whatsoever.
21.0 Materials obtain from dismantling
If the contractor, in the course of execution of work is called upon to dismantle any part for reasons
other than on account of bad or imperfect work, the materials obtained from dismantling will be the
property of the A.M.C. and will be disposed of as per instruction of Engineer-in-charge in the best
interest of the A.M.C.
22.0 Dispute to be referred to Arbitrator
The disputes relating to this contract, so far as they relate to any of the following matters, whether
such disputes arise during the progress of the work or after the completion or abandonment thereof,
shall be referred an independent Arbitrator appointed by AMC as far possible in consultation with the
Signature of Bidder Page 20 of
Ahmedabad Municipal Corporation
agency if it is necessary and such disputes shall be settled in accordance with the arbitration and
conciliation Act.
(i) The rates of payment under clause 5 for any tools, materials and stores, in or upon the works
of the site thereof or belonging to the contractor or procured by him and intended to be used
for execution of the work or any part thereof possession of which may have been taken by
the Engineer-in-charge under the said clause –5.
(ii) The reduction in rates made by the Engineer-in-charge under clause 9 from the items of
works not accepted as completed fully in accordance with the sanctioned specifications.
(iii) The rate of part of payment for any class of work which is included in the additional or altered
work carried out by the contractor in accordance with the instructions of the Engineer-in-
charge under clause 14 and the rates for which is to be determined under the said clause
(iv) The rates of payment for materials already purchased or agreed to be purchased by the
contractor before receipt of notice given by the Engineer-in-charge under clause 15 and/or
amount of compensation payable to the contractor under the said clause for loss in respect of
such materials.
(v) The amount of compensation which the contractor shall be liable to pay under clause 17 in
the event of this failure to rectify, remove or reconstruct the work within the period specified
in the written intimation or the amount of expenses incurred by the Engineer-in-charge under
the said clause17 in rectifying, removing or re-executing the work or in removing and
replacing the materials or articles complained of.
(vi) The reduction of rates as may be fixed by the Engineer-in-charge under clause 17 for the
inferior work or materials as accepted or made use of.
(vii) The amount of compensation payable by the contractor for damages as estimates and
assessed under clause
(viii) The amount payable to the contractor for the work carried out under clause 33 in accordance
with the instructions and the requirement of the Engineer-in-charge in case where there are
no specifications.
(ix) The awards declared by the arbitrator shall be speaking award giving reasons and calculations
to every item of claims. The decision will have to be implemented by all the concerned.
(x) In case of dispute leading to the contractor or Ahmedabad Municipal Corporation
approaching on Court of Law. It shall be within the jurisdiction where the site of work is
The reference to arbitration proceeding under this clause shall not:
i) Entitle the contractor to stop the Affect the right of the Engineer-in-charge under clause 5 to take
possession of all or any tools, plants, materials and stores in or upon the works of site thereof
belonging to the contractor or procured by him and intended to be used for the execution of the
work or any part thereof.
ii) Preclude the Engineer-in-charge from utilizing the materials purchased by the contractor in any
work or from removing such materials to other places, during the period the work is stopped or
suspended in pursuance, of notice given to the contractor under clause
iii) Progress of the work or the carrying out the additional or altered work in accordance with the
provisions of clause 14 or as the case may be, of clause
23.0 Drawings and Photographs of the Works
23.1 The contractor shall do photography/ videography of the site as and when asked by AMC. No
separate payment will be made to the contractor for this. . The contractor shall have to submit the
same in hard copy as well as soft copy as and when demanded by the AMC.
23.2 No photograph of the works or any part thereof or plant employed thereon, except those permitted
under clause 59.1, shall be taken, or permitted to be taken by the Contractor or by any of his
employees or any employees of his sub-Contractors without the prior approval of the Engineer in
Signature of Bidder Page 21 of
Ahmedabad Municipal Corporation
writing. No photographs/ videography shall be published or otherwise circulated without the
approval of the Engineer in writing.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 22 of
Ahmedabad Municipal Corporation
ybœtJtœ BGþrlrmvj ftuvtuohuNl
ftb btxuLþk xftJthe œhJt¤wk xuLzh ylu ftuLx[tfx
xuLzh btxule Nh<tu
(1) y:- yt xuLzh su <u Jdolt ybœtJtœ BGþrl.ftuvtuohuNl y&Jt fuLî{ y&Jt htsg mhfthle btLg gtœelt
ftuLx[fxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu ybœtJtœ BGþrl.ftuvtuohuNlbtk btLg ftuLx[tfxhtule
gtœebtk hSMxuNl fhtJJtlwk hnuNu.
c:- btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u stuzJtle
f:- xuLzhhle jtgft<
ftb sJtc>th xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKe ytJ<t ntug <ubs ftb fhJt mûtb
ntug <ublu s ytvJtbtk ytJNu. ftb ytv<t vnujt ftuLx[tfxhu ftb mk<tu»tfthf <ubs xtRb jebexbtk
ÃþY fhJt sYhe mJj<,ylwCJ, ûtb<t ylu VtgltLmegj hemtumo hsw fhJtlt hnuNu.
z:- ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe ylwmth <&t
mexe.Rsluh mh¾gwjh,lk -17,<t.09/12/2012 bwsc ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk
ftuLx[t¾xh hSMxuNl Ve, heLgwyj Ve <&t yvd{uzuNl Ve ylu btvœkztu ægtlbtk htFe <u bwsc ybj
E. xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo,
mkath ylu JvhtNlt ceò hM<tytu&e mk<wÐ ntuJtlwk btle juJtbtk ytJNu. xuLzhhu ftblu mtRx ylu
rcÕzekd(fu su ftb fhJt, ftb ÃþY fhJt <&t ftblt buRxulLm btxu cltJuj ntug).<ubs xuLzhhu yt
mtRxlt ftb btxu, rcÕzekd btxu, gtzo, zevtu btxule søgt vtu<tle he<u bu¤Je juJtle hnuNu. (xuLzhlwk
ftb fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm btxule søgt)
(h) yt ftble mbg bgtoœt bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(3) xuLzh Jujezexe rvhegz bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(4) xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
(5) xuLzh Vtubo
xuLzh Vtubo ylu ylwmwrabtkle œhufu œhuf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt œM<tJus vh<
(6) ftuLx[tfxhtuyu leaule ctc<tu ft¤SÃËJof JtkaJt rJlk<e Au.
(1) ftuR fkvlelu ltbu xuLzh juJtbkt ytÔgwk ntug <tu fkvle J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]< fh<wk
bwFðgthltbwk xuLzh mt&u hsw fhJtlwk hnuNu.
(2) Bgwrl.ftuvtuohuNllt «Joðbtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh mt&u cezJtle
(3) ftuLx[tfxhu RLfbxuût mkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
Signature of Bidder Page 23 of
Ahmedabad Municipal Corporation
(4) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
(5) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
(6) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
xuLzh Chlthlu sKtJJtbtk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu VhuVth fhJtbtk
ytJtNu lrn ylu ytJe ftuR AufAtf fu VuhVth juJtNu lrn, <ultk jFtKbtk ftuR Cwj ntug <tu <ult
vh l Dwkx<t Ftuxt jFtK fu ytkfzt vh Auftu bthelu <ult mtawk jFtK fu ytkfzt MvÐ Wfju <u he<u
jFJt. «ðguf mw^tht vh xwkfe mne fhJe.
(8) y:- xuLzh hsw fh<tk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtk ytÔgw lrn ntug <tu
xuLzh ybtLg dKJtbkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult
btdoœNol btxu mtbtLg rlgbtu ylu mwaltytu vK ft¤SvwJof JtkaJt rJlk<e Au.
(1) ftuEvK fthK œNtoÔgt rmJtg ftuEvK fu c^t xuLzhtu yMJefthJtltu n¬ yctr^< hnu Au.
(h) xuLzhhu ctujvtuELx vullt c>ju NtneJt¤e vul&e Chujt xuLzhtu ðþkh< s ybtLg dKJtbtk ytJNu.
c:- Wvhle ctc<tu Wvhtk< xuLzh leault mkstudtubtk <h< ybtLg XhJtlu vtºt &Nu.
(1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt vîr<
y&Jt rJd<tubtk bwfuj Nh< y&Jt mw^thtbtk ftuR VuhVth mwaJ<t ntug.
(h) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkÏgwk/ltkÏgt ntug fu cœÕGþ / cœÕgt ntug.
(3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
(4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
(5) xuLzh Chlth y&Jt vuZele ctc<btk œhuf Ctdeœth y&Jt <u ykdulwk bwFðgthltbwk ^htJlth Ôgrf<
mne l fhu y&Jt xuLzhbt <u btxu htFJtbtk ytJuje søgtbtk mne/mneytu Wvh ftuR mtûteyu mtF
f:- Nh<e xuLzh MJefthJtbtk ytJNu lne.
z:- xuLzh MJefthJw, hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu rlKog
ytFhe hnuNu. ftuR fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuRvK
«fthltu lwfNtle fu J¤<hltu nff œtJtuu fhe NfNu lrn fu ftgœtfeg ftgoJtne yt ykdu &R NfNu
lrn. xuLzh bkswh >ltu y&o ftb ytve œuJtLþk Au <uJtu &R NfNu lrn.Nh<e xuLzh MJefthJtbtk
(9) rJmkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtfbtklt sÚ&t ylu hfble ftuRvK Cwjawf
leault rlgbtu ylwmth mhCh fhJtbtk ytJNu.
(1) xuLzh Chlthu œhuf Ftltbtk sKtJuj Nçœtu ylu ytkfzt Jåau ftuR ymkdr<lt fumbtk Nçœtuubtk sKtJuj
hfb btLg htFJtbtk ytJNu.
Signature of Bidder Page 24 of
Ahmedabad Municipal Corporation
(2) yufb œh ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu œNtoJ<e CtJ vºtflt Ftltbtk&e
hfbbtk Cwj sKtg <tu yufb œh btLg htFJtbkt ytJNu ylu œhlt yt^thu dwKtfth mw^thJtbkt
(3) yufblt Ftltbtk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkt ytJNu.
(4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkfzu fhuj ftuR vK ctc< ægtlbtk juJtbtk ytJNu lrn.
(10) y:- ftbltu «tud{um mbgbgtoœt bwsc fhJtltu hnuNu. yt mbgbgotœt 10 jtF mw^elt ftb btxu
yuj.ytu.ytR. ytÃgt <theF&e 10 rœJm <&t 10 jtF &e Wvhltk ftb btxu yuj.ytu.ytR. ytÃg
<theF&e 15 rœJm&e NY &guj dKJtbt ytJNu. <&t <u œhBgtl ftble 3% juFu zevtuÍex Che fhthvºt
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt CtJ
dKJtbtk ytJNu. ylu <ubtk atjw ftb œhBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu
c:- mûtb m•tt îtht xuLzhle bkswheltu XhtJ vtzgt ctœ (LOI) ytvJtbtk ytJNu ðgth ctœ rœl -
btk rm¾gtuhexe zevtuÍex sbt fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze ChJtlt rfMmtbtk
Bgwrl.ftuvtuohuNlbtk «Joðbtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
f:- bkswh &guj xuLzhle mbgbgtoœtbtk ftbdehe vqKo l &tg <tu bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk
sKtJuj «btKu bkswh &guj mbgbgtoœt ctœlt FhuFh ctfe ftble hfblt bn•tb 10% juFu
(jefJezexe zubuSm) vulÕxe Jmwj fhJtbtk ytJNu.
z:- yu.yth.me. xuLzhbtk bkswh &guj sw>t sw>t yk>ts vifelt ftbtu Jfo ytuzoh b¤u&e NY fhJtlt hnuNu.
E:- yu.yth.me. xuLzhbtk yjd yjd ykkœtsle bkkswhe bégu&e btºt rmJej ftbdehelt ftb «btKu
yk>ts hfb Bþsc mbgbgto>t dKtNu.
(1) Yt.1,00,000.00 Mþ^elt ftbtu btxu 02 btm
(h) Yt.3,00,000.00 Mþ^elt ftbtu btxu 03 btm
(3) Yt.5,00,000.00 Mþ^elt ftbtu btxu 04 btm
(4) Yt.5,00,000.00 &e Wvhlt ftbtu btxu 06 btm
(11) y:- awfJKe:-
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkfujt œh vwhtk &gujt ftb btxult Au ylu <ubtk
bswhe, vtjF, ÃjtLx, œuFhuF, mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug Jduhu ykNu <btb
Faoltu <&t sYh sKtg <tu ylu ðgthu ht<vt¤elt ftblu juJt c^t J^thtlt Faoltu mbtJuN &Nu
ylu xtkfujt CtJ fu œh fh<t J^thtle ftuR awfJKe ykdult <ublt ftuR œtJt ægtlbtk juJtNu lnek
ylu xuLzh Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR Ôgrf<yu (vAe<u ctk^ftb rJCtdltu fboathe
ntug fu l ntug) <ublu ytvuje btne<elu yt^thu vtA¤&e ftuR œtJt hsw fhJt nfœth hnuNu lnek.
<ublw xuLzh ChJt <&t <ubtk swœt swœt CtJ ylu œh ChJt btxu sYhe yuJe <btb btne<e vtu<tlt
vûtu l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw fhJtlu je^u y&Jt <ubtk&e WCt &<t ftuR stuFb fu
Signature of Bidder Page 25 of
Ahmedabad Municipal Corporation
sJtcœthebtk&e Axfe NfNu lnek. mœh ftbbtk ftuR vK ò<lt ctk^ftblt bxehegj Wvh CtJ
J^thtu ytvJtbtk ytJNu lrnk.
c:- ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt ytJNu.
<&t Bgwrl. frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt rcl
Nh<e ckDlf<ot hnuNu.
f:- ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh bwsclwk vubuLx
+ yu¾x[t ytRxb) 2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh< ytvJtbtk
z:- htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc
ftuLx[tfxhlt cejbtk&e fvt< fhJtbt ytJNu.
(12) yu:- fhth mkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu
ce:- xuLzhbtk œNtoJuj ftb mkck^e œM<tJusbtk œNtoJuj rJd<btk rJmkd<<tlt rfMmtbtk leau œNotJuj
¢btlwmth œM<tJusbtk œNtoJuj rJd< d{tng htFJtbkt ytJNu.fhth mkc^e œM<tJustu fhthlt
ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
(yu) yufb ylu fœ:-
(2) xuLzh VtuboLþk CtJvºtf
(3) MvuNeVefuNl
z[tu#dbtk fœ, ytfth, ytkfzt fœta Ftuxt ntug <tu btvujt fœ, ytfthlu yLþmhÔþk
(2) xuLzh Vtubole yLþMþra-ce
(3) MvuNeVefuNl
Cwj Chujt fu Ftuxt JKollt rfMmtbtk yt mkck^e Wvhefûttyu rJmkd<<t ykdule ltuk^ bwfe
yuze.mexe yuLSlegh / zu.BGþrl.frbNlh©ele bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbkt
ytJuj rlKog ykr<b dKJtbkt ytJNu.
(13) xuLzhhu z[tuRkd fu MvuNeVefuNlbtk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu
Rsluh Rlatsuo Ãjtl <&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
(14) yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
(15) yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY
(16) atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu lwfNtl
&Nu <tu <ule mkvwKo sJtcœthe (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb œhBgtl
bswhtu fu sl<tlt ftuR btKmlt òlbtj lu lwfNtl &tg <ule sJtcœthe ftuLx[tfxhle hnuNu.
Signature of Bidder Page 26 of
Ahmedabad Municipal Corporation
vtujem Vrhgtœ &tg <tu <ule sJtc>the vK ftuLxtfxhle hnuNu. CuFz Dme l vzu <ule sJtc>the
vK vtujem Vrhgtœbt ftuLx[tfxhle hnuNu. CuFz Dme l vzu <u btxu mjtb<elt vdjt (suJt fu œtuhzwk
ctk^e bswh Ftztbtk W<thJt, mtuhekd ylu Mx[xekd fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu
<tu ftuLx[tfxh s vtujem Vrhgtœbt sJtcœth hnuNu ylu Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu
sJtcœth hnuNu lrn. ytxjwk mbSlu s xuLzh ChJwk. œhuf ftb fh<t bswhtultu rJbtu vK W<thujtu
(17) bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt
hnuNu. bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu hnuNu.<&t atjw ftb
œhBgtl yuLSlegh Rlatso îtht ybœtJtœ Bgwrlmevj ftuvtuohuNlle buxjzuvtu jucbtk xuMxekd
fhtJJt sKtJJtbtk ytJu <tu ftuLx[t¾xh îtht <ulw vtjl fhJtlw hnuNu.
(18) M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb
ylwmth <u ykdu ftb fhJt ftuLx[tfxh ck^tgujt Au.
(19) mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl 1btk vh< jR sJtltu
hnuNu. yLg&t <ule lwfNtlle sJtc>the ftuLx[tfxhle hnuNu.
(20) ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au. <ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/juch
yufx <&t bswhtu <&t MxtVle Jebt vtujeme jElu <ult ftgœtlw vtjl fhJtlwk hnuNu <&t yt ykdu
Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u ytvJtle hnuNu. bu.BGþrl.frbNlh©elt
mh¾âwjh Bþsc sYhe ctknu^he vºtf ytvJtLþk hnuNu.
(21) ftuRvK ftgœtfeg jexeduNl ybœJtœ Nnuhle ftuxobt hnuNu.
(22) btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs
dtuXJJtltu hnuNu.
(23) ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
(24) ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc
jtJJtlt hnuNu.<&t xuMxekd fhtJJtlwk hnuNu.<&t y ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgbtulw vtjl
(25) yt xuLzhbtk stu ftuR ytRxb hne dR ntug <tu <u y&Jt M&¤ M&e<e bwsc xuLzhbtk mbtJuN l ntug
<uJe J^thtle ftbdehe fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth
J^thtle ytRxblt CtJ lffe fhJtbtk ytJNu ylu <u bwsc awkfJKe fhJtbtk ytJNu.
(26) atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[tfxhle hnuNu. subtk vevzt, œtuhzt Cgmwaf
ctuzo, ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwk hnuNu. ylu ftuRvK yfMbt< &Nu <tu
<ule mkvwKo sJtc>the ftuLx[tfxhle hnuNu.
(27) M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt
yfMbt<lt rfMmbtk juch yufx bwsc fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtc>the
ftuLx[tfxhle hnuNu.
(28) stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubtk œhhtus fhuj ftbdehe
<&t yr^ftheytuyu ftb mw^thJt fu «tud{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk
Signature of Bidder Page 27 of
Ahmedabad Municipal Corporation
hnuNu ytJe ltu^lt sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle
m•tt yuze.mexe yuLSlehgh©elu hnuNu.
(29) œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj
MvuNeVefuNl Nh<tu bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk
yuze.mexe.yuLSlegh©eltu rlKog ytFhe hnuNu.Jtuxhekd fhJtbtk lrn ytJu fu œhhtus J^thtltu
zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu sutFbu Jdh ltuxemu Jtuxhekd fhtJJtbtk <&t
zucheÍ WvtzJtbtk ytJNu ylu cejbtk&e hfb ftve juJtbtk ytJNu.
(30) juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb bwscle hfb cejbtk&e ftve juJtbtk
(31) atubtmtltu vehegz <t.15 swl &e 14 ytufxtuch Mþ^eltu dKJtbtk ytJNu. yt mbg œhBgtl
ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug <tu <u Bþscle xtEb jebex J^the ytvJtbtk
(32) muÕm xuût / Jux lkch / ve.yuV. ftuz lkch / vtl lkch / S.yum.xe. lkch rJduhu ftuLx[t¾xhu VhSgt<
(33) ltbœth ftuxo îtht fhuj nwfb <ubs rlœuo»ttulwk awM<vKu vtjl fhJtlwk hnuNu. subtk z[ulus lu jd<tk ftb
btk ftuRvK mkkstudtubtk bNel ntuj / dxh btk btKmlu W<thJtu lnek <ubs buLgwyj M¾{uJSkd ykdule
btdoœrNoft lwk vtjl fhJwk.
(34) mœh xuLzhle ytRxbtult CtJtu ltKt Ft<t lt mhfgwjh lk.38, <t.21/11/22 <&t mûtb m•ttle
b¤uj bkswhe bwsc GST rmJtg dKºtebtk juJtbt ytJuj <&t «Jo<btl rlgb bwsc GST awfJJt
vtºt &Nu su&e <btb cezomu <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
(35) mœh xuLzh yk<od<lt ftb mkjøl y.Bgw.ftu.btk vJo<btl <btb rlgbtu/mhfgwjhtu jtdw vzNu <ubs
JF<tu JF< <h mw^thtytu vK jtdw vzNu. sule ltuk^ jR xuLzhtu ChJtlt hnuNu.
(36) mœh xuLzh yu.yth.me. «fthlw Au ytvlu mtukvJtbtkk yuxju fu ytv îtht ChJtbtkk ytJuj ftbdehelt
sÚ&t bwsc mbg bgtoœt lffe fhe su <u mûtbm<tle yjd yjd ykkœtsle bkkswhe bégu&e Jfo
ytuzoh ytvJtbtkk ytJNu ylu mbg bgtoœtbtkk ftbdehe vqKo fhJtlw awM< vKu vtjl fhJtlw hunNu .
(37) mœhnw ftbbtkk Jtuzobtkk sYhegt< bwsc ytuAtbtkk ytuAe xuLzhle Nh< bwsc bkkswh <h xuLzh vife
yjd yjd ykkœtsle bkkswhe bu¤JJtbtkk ytJ<e ntuR, ytuAtbtkk ytuAe yuf mt&u œN søgtyu
sYhegt< bwsc ftbdehe NY fhJtle Nh<u ylu <u «btKu bulvtJh, bNelhe, bxehegÕm <ubs
ltkkKtfeg studJtRle vwh<t «btKbtkk ÔgJM&t fhe su <u xuLzhhu xuLzh Cgto vqJuo ytdtu<Y ytgtuslle
<igthe mt&u ftbdehe fhJtle &tg Au.
Signature of Bidder Page 28 of
Ahmedabad Municipal Corporation
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu M&¤le
bwjtft< je^e Au ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf
vrhrM&r<le ò<-btne<e bu¤Je Au.
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu
jd<t œM<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkb<
ftuLx[tfxhle mne ylu rmfft
Signature of Bidder Page 29 of
Ahmedabad Municipal Corporation
TECHNICAL SPECIFICATIONS:
Name of work:- bægÍtul ltkk sbtjvwh Jtuzo htgFz rJM<thbtkk FtYltk lt¤t , mtuœtdh le vtu¤,ftuXe bntuÕjt
<&t yLg søgtyu vtKele jtRl ltkk jefuSm <ubs sYhegt< bwsc le vtKele lJe jtRl ltFJtltkk
ftb (yu.yth.me)
STANDARD DETAILED TECHNICAL SPECIFICATION OF ITEMS
TECHNICAL SPECIFICATIONS:
Following technical specifications shall be applicable to the relevant items of BOQ
Providing FoR Cost of Materials & supplying at Materials
Providing TMT Bar FE 500D reinforcement for R.C.C. work including bending, binding and placing in
Position complete upto floor two level (R & B Building SOR 21-22 Item no. 5.4.11 I.code 05014C)
P/F dead shuttering for slab, beam etc.
Lead (AMC central Stroe i.code 18910001 rate as on dated 21.02.2023)
Jute (Spun Yarn) (AMC central Store i.code 18940001 rate as on dated 21.02.2023)
Nut Bolt (AMC central Store i.code 10550138 rate as on dated 21.02.2023)
MS Plate (as per building SOR)
MS Blank flange
THE RATE SHALL BE FOR A UNIT OF KG
Hiring and operating the 20 KV 3 Phase Electric Generator for operating SHIFT
desilting machinery and lighting and other requirements with Arranging
diesel to run the D.G. Set Do As Directed. 8 Hrs Shift.
Rent of Welding machine per shift ( SHIFT
Rent for Grinder machine per shift SHIFT
Gas Cutting set per shift SHIFT
Signature of Bidder Page 30 of
Ahmedabad Municipal Corporation
Oxygen bottle NO
Rent of Tools & Other Charges SHIFT
Rent of Chain pulley block & Tripod SHIFT
Providing For Masonry & RCC Work
M-Seal 100 gm pack NO
Cement bag (As per building SOR I.code M143) BAG
Grit- Aggregates (As per building SOR I.code M176) CMT
Kapachi Aggregates (As per building SOR I.code M178) CMT
Sand (As per building SOR I.code M209) CMT
Brick (As per building SOR I.code M166) NO
ITEM NO.03 PROVIDING AND LAYING CONTROLLED CEMENT CONCRETE M.200 AND CURING COMPLETE EXCLUDING THE COST OF
FORMWORK AND REINFORCEMENT FOR REINFORCED CONCRETE WORK IN (A)F OUNDATIONS , FOOTINGS , B ASE OF COLUMNS AND MASS
CONCRETE (B UILDING SOR 21-22 I.NO .5.8.2 I.CODE 05024AA)
THE RATE SHALL BE FOR A UNIT OF CMT
Item No. 4 & 5: Labour Charges for repairing the joint leakage in the existing C.I./DI Pipe line with
specials incl. required materials such as jute and lead etc , nece. excavation in any type of soil, refilling,
nacessary trust block etc.comp. as per instruction of engg.in charge.
Labour Charges for repairing the joint leakage in the existing C.I./DI Pipe line with specials incl. required
materials such as jute and lead etc , nece. excavation in any type of soil, refilling, nacessary trust block
etc.comp. as per instruction of engg.in charge
The Mode of m ea suremen t a nd ra te fo r item sha ll be given a s per o ne number
Item No. 06: Providing, supplying and fixing check nut for sluice valve. C.I./M.S./G.M. or Brass. Instruction
of engg. In charge.
The Mode of m ea suremen t a nd ra te fo r item sha ll be given a s per o ne number b asis.
Signature of Bidder Page 31 of
Ahmedabad Municipal Corporation
Item No. 07: Labour Charges for removing and recover of ex. C.I. Sluice valve with tail pieces and carting it
up to Muni.Store or site as per instruction of Engg. In charge item include. necessary Excavation, removing
or making joints, refilling etc.comp. as directed by Engg in charge.
Refer Specification of Iteam No.
The Mode of m ea suremen t a nd ra te fo r item sha ll be given a s per o ne number b asis.
Item No. 08: Providing and fixing to wall, ceiling and floor galvanised Mild steel tubes (Medium grade)
of the following nominal bore, tube fitting and clamps including making good the wall ceiling and floor..
The Mode of m ea suremen t a nd ra te fo r item sha ll be given a s per Rmt ba sis.
Item No. 9 Providing, laying and jointing in true line and level U.P.V.C pipe (SCH - 40) of following dia.
including fittings of standard make as approved by Engineer
- in - charge. Pipe shall be fixed on the wall with the help of clamp at every 2000 mm centre to centre or
shall be concealed as directed including necessary fittings etc. including testing of pipe and joints and fixing
the same with adhesive solvent, including cost of all materials
The Mode of m ea suremen t a nd ra te sha ll be given a s per on e running meter ba sis.
Item No. 10 Extra Rate Over Item Of Excavation Of Earth For Excavation Of Asphalt Pavement /
RCC Of Thickness Upto 0.20 Meter Including Demolishing The Asphalt Carpet,Metal,Soiling/Cutting
Reinforcement Etc.Comp. With Stacking The Material As Directed. Sub:-
A) Upto 0.20 Meter Thickness (By Manual). & (b) & C
Extra rate for excavation of asphalt payment / RCC of thickness upto 0.20 meter including
demolishing the asphalt carpet, metal, soiling, cutting reinforcement etc. complete with stacking the
materials as directed. The road surface of asphalt shall carefully be opened to full width as directed by
the Engineer in charge so as to remove all cracks or other damaged portions of road either manually
or with the soiling shall be first be stripped off for the whole width of trenches. All the materials shall
be separately deposited in such places as may be determined by the Engineer-in-charge. In case rubble
not being so deposited or being mixed up with the excavated materials will not be allowed for
refilling. The cost of materials shall be charged from the contractor. The decision of the C.E. shall be
final and binding to the contractor.
The Mode of measurement and rate shall be given as per one square meter basis.
B) 0.20 Meter To 0.30 Meter Thickness (By Breaker Machine Including Cost Of Operator, Fuel, &
Transportaion Etc Complete.
Signature of Bidder Page 32 of
Ahmedabad Municipal Corporation
Extra rate for excavation of asphalt payment / RCC of thickness from 0.20 meter to 0.30 meter
including demolishing the asphalt carpet, metal, soiling, cutting reinforcement etc. complete with stacking the
materials as directed. For detailed specification refer item no.
The Mode of measurement and rate shall be given as per one square meter basis.
C) 0.30 Meter & Above (By Breaker Machine Including Cost Of Operator, Fuel, & Transportaion Etc
Extra rate for excavation of asphalt payment / RCC of thickness 0.30 meter & above including
demolishing the asphalt carpet, metal, soiling, cutting reinforcement etc. complete with stacking the
materials as directed. For detailed specification refer item no.
The Mode of measurement and rate shall be given as per one square meter basis.
Item No. 11: Making hole on existing CI/DI/MS water pipe line including nacessary GI fittings item also
includes necessary excavation, dewatering and refilling as per instruction engg. In charge etc.comp.(a) To (f)
Making hole on existing CI/DI/MS water pipe line including nacessary GI fittings item also includes necessary
excavation, dewatering and refilling as per instruction engg. In charge etc.comp.
The Mode of m ea suremen t a nd ra te sha ll be given a s per on e numb er ba sis.
Item No. 12: Transporting from AMC store and laying spigot and socket New DI pipe line DI-k-9
pipes of various classes with CI/DI/MS specials of following diameters. Rate includes excavation
up to minimum 1.0 mt. depth from top of pipe / as per requirement in any soil, refilling after
laying pipe, covering and temptation of carting surplus earth up to 30 mt. lead and watering and
compaction. Clearing the site. All Joints shall be made tight & leak free etc. comp.
(a) 80 mm Dia Pipe.
(b) 100 mm Dia Pipe.
(c) 150 mm Dia Pipe.
(d) 200 mm Dia Pipe.
This Specification c overs the requirements for collectin g from Mu nicipal Stores or
contractor’s stack yard transportation of cast to work sites lying j ointing and field
testing of cast iron pipes and fittin gs for the water distributio n Net wo rk.
Signature of Bidder Page 33 of
Ahmedabad Municipal Corporation
Various ope rations such as transpo rt to work sites loweri ng in trenches laying
jointing and field testing of cast iron pipes and fittings shall comply with all
currently applicable standards. In all cases the latest revisio n of the standards shall
be referred to. If requirements of this specification conflict with the requirements of
the standards this specification shall grove.
a) IS: 1538 Specification fo r cast ion fitti ngs for Pressure pipes for water gas
b) IS: 3114 Code of practice for layi ng of cast-iro n.
c) IS: 3400 Methods of test for vulcanized rubber (Parts t o 2 0)
CARTING AND H ANDLING :
Cast iron pipes fittings (specials) and valves with tail pieces shall be transpo rte d
from the Municipal Stores or contractor’s stack yard to the wo rk sites at places
along the alignment of pipeline as directed by Owner /Engineer. The Contractor
shall be responsible for the safety of pipes fitting and vales with tail pieces in
transit loading/unloadin g. Every care shall be exercised in handlin g pipes and
fittings to avoid damage. Whi le unloading the pipes and fittings shall with steadying
ropes of by any other means. Padding shall be provided between coated pipes
fittings and skids to avoid damage to the coating Suitable gap between pipes sho ul d
be lift at intervals in order to permit access from one side to the other. In case of
spi got socket pipes care should be taken regarding orientations pipes while
unloadi ng. As far as possi ble pipes shall be unloaded on one side of the stretch o nl y.
The pi pes shall be ch ecked for any visible damage (such as broken ed ges c rackin g or
spelling of pipe) while undo adding and shall be sorted out for reclamation any pipe
which shows sufficient damage to preclude it from being used shall be discarded
shall be prohibited. Necessary warning boards and lamp s should be provided in front
and side of pipes to avoi d any accident. Pipes should be stacked with sufficient
packing to prevent rolling of the same. Contractor will be fully responsible fo r any
accident due to pipes or other materials stacked on site of yard. Contracto r will be
fully responsible for any legal formalitie s arising due to such accident and all legal
charges there of shall be paid by contra ctor of will be recovered from his running
bill of the same or other AMC works.
Each stack of pipes shall contain only pipes of same class and size, with
consignment or batch number marked on it with particulars of supplies wherever
possible st orage shall be done on film level and clan ground and wedges shall be
provided at the bottom la yer to keep the stack stable. The stack shall be in pyramid
shape or the laid lengthwise and crosswise in altimeter laye rs. The pyramid stack
shall be made for smaller diameter pipes for conse rving space in storing them. The
height of the stock shall not exceed 1.5m.
Fitting and sluice valves with tail pieces shall be stacked under cover and separated
Rubber ri ngs shall be stored i n clean cool store away from windows boiler electric al
equipment and petrol oils or other chemicals Pa rticularly in the field where the
rubber nods are being used it is desirable that they are left out on the ground in the
sun or overmuch under heavy frost of snow con ditions.
Signature of Bidder Page 34 of
Ahmedabad Municipal Corporation
The Contractor shall visit the before tendering and get himself acquainted site
condition and the re gulations regarding the layi ng of pi pes in con gested areas heavy
traffics areas etc. The successful bidder shall take t he necessary permission and
clearance of all the authorities like dip ardent of ads t raffic water supply an d the
drainage electricity broad telephone comp an y etc. wherever necessary.
Road reinstatement shall not be i ncluded in back fillin g unless specified.
To protect pers on from inj ury and t o avoid damage to prope rty adequate barrica des
construction signs red lanterns and guards as requi red shall be placed and mainlined
duri ng the progress of the construction work and unit it is s afe for the traffics to use
the roadways. The relevant Indian standards and the rules and regulations of th e
local authorities in regarded to safet y provisions shall be observed.
General lightin g for works site, warni ng lights, sign boards, fencing etc. shall be
provided by contractor at his own cost.
Suitable fencing sha ll be provided along the sides of trenches and pits. The post of
the fencin g shall be of timber securely fixed in the groun d not mo re than 3m .apa rt
and the y shall be less than 7 5 mm in diameter of less than 1.2 m abo ve the su rface
of the ground. There shall be two rails. One near the top of the post and the other
about 450 mm. Ab ove the ground and each shall be from 50mmto 70m m in diamet er
and sufficiently long to run from post to post which the y shall be bou nd with strong
rope. The method of projecting rails beyond the posts and tying them to gether whe re
they meet will not be allowed on any account. All along the edges of the excavated
trenches a bank of earth about 1. 2. m high shall be formed as required by th e
Owner/Engineer for further protection. The above work shall not be paid for
separately and the contractor shall take into account the costs of such works and
quote accordin gly.
Whole work shall be completed within 24 h rs. by parts o r whole work so that water
suppl y from AMC shall not be di sturbed.
The excavation in the foundation shall be carried out in true and le vel and shall have
the width and depth as required and as directed. The Contractor shall p ro vide
necessary slopes to a safe angle or steps as required o r directed at his own cost No
extra payment shall be made for such precautionary measure s taken. The bottom of
the excavated a rea shall be leveled both longitudi nally and transversely as directed
b y removing excess soil and watering as required. No earth filling will be allowed
for bringing it to level if by mistake or any othe r reason excavation is made deeper
or wi der than as directed. The extra depth or width shall be made up with concrete
of the same proporti on as specified for the foundation co ncrete at the cost of the
contractor. The exca vati on up to any re quired depth shall be carried out un der this
item as requi red and directed by engineer in charge.
Surface Excava ti on for Roa d Work :
Signature of Bidder Page 35 of
Ahmedabad Municipal Corporation
Excavation exceeding 1.5 mm in width and 10 sq mm on p lan but not exceeding
cm in depth in all kinds of soil which are specified shall be as treated as surface
Excavation in trenches for service lines- Water supply and Drai nage :
Excavation in trenches shall be carried out in any material encountered on the site to
enable the service l ines to be laid to the lines and levels shown and as direct ed.
Excavation shall be made with adequate and stable side slopes or sho ring struttin g if
necessary. The contractor shall provide all measures to protect adjoining properties
service limes etc. The contracto r shall take necessary action to keep exca vati on free
Trenches shall be wide enough to provide sufficient space for joining and
inspection. The t rench bed shall be trimmed and rammed with sp rin kling of sand or
murmur so that the pipes when laid to t he requi red le vels and gradients shall be on
the bottom full y supported along the entire length of the pipe. The trench shall be
deepened and widened locally to receive the sockets and to permit the j oint to be
made and inspected.
Before excavation i s started rails shall be erected at convenient places and at all
changes of di rection and gradients at a definite and as far as practicable uniform
height above the proposed invert level of the pipes the center lime bein g clearly
marked on each ho rizon tal rail. The depth of excavation and level of the pipe in vert
shall be checked by means of benching road of app ropriate lengths.
Dis posal of the E xcavated Stuff:
The exca vated stuff of the selected type shall be used for filling the trenches and
plinth or le veli ng the ground in layers including rammi ng and waterin g etc.
complete. The Con tractor shall remove the balance of the excavated from t he site of
work t o a place as directed within a lead unto 50mm and fo r a ll lift.
As soon as the work in foundati on has been completed and measured the si des of
foundation shall be cleared of all dedans brick bats mortar dropping etc. and filled
with earth in layers not exceeding 15 cm each layer shall be adequately watered
rammed well and consoli dated before the succeeding layer is laid. The earth shall be
rammed with iro n rammers where feasible and with the butt ends in layer of
crowbars where ram mer cannot be used. The plinth shall be similarly filled wit h
earth in layers not exceeding 15 cm adequatel y watere d and cons olidated by
ramming with iron or wo oden rammers. When filling reaches finished level t he
surface shall be flooded with water for at least 24 hours and allowed to dry and then
rammed and consolidated. The finished level of filing shall be kept to shape and
gradient intended to receive any floor finish. The excavated stuff of the selected
type only shall be allowed to be used for filling the t renches and plinths. Under no
circumstances black cotton soil shall be used for filling the plinths.
Signature of Bidder Page 36 of
Ahmedabad Municipal Corporation
Filling materials may be either excavated stuff of selected materials brought from
Excavated stuff or selected earth to be used shall be cleared of all rubbish large size
stones brick bats etc. complete and big clods shall be broken down t o a size of
The selected soil and or mu rmur or any other materials shall be got approved bef ore
Refilling shall be done in a s ystematic manner b y the contractor before refilling
starts, the contracto r shall get checked the trenches ready fo r refillin g.
The space between foundation masonary concrete pipe line and the sides of
excavation and/or bottom of found at ion shall be refilled to the origi nal surface or
up to plinth level with earth or selected materials in la yers of 15 cm to 20 cm each
well wate red and rammed.
Each layer shall be watered and compacted with heavy ra mmer before the up per
layer is laid till the final level is reached to form a thorou ghly compacted base.
Refilling on t op of pipe shall be carried out carefull y with se lected soft st uff out of
the excavated stuff. The refilling shall be raised about 5 cams. for subsequent
The contractor shall be resp onsible for any settlement d uring passage of time of
duri ng monsoo n and the same shall be refilled with stuff brou ght from the outsi de if
The process of refilling brunches in pli nth watering ramming shall be carried out i n
such a way as not to dan ger to pipe line for foundatio n footin g plinth well etc.
already laid or b uilt up.
If watering is n ot done by contracto r with its own arrange me ant wateri ng cha rges at
20% of this item rate shall be deducted from the bill against this item.
The rubber ring shall be stored in a cool dark dry and dust free enviro nment. The
storage shall not be exposed to direct sunlight or any heat radiating appl iance. The
rings shall no t be allowed to come i n contact with any fuels and shall be stored free
Rubber rings shall be clearly labeled in bundles to i ndicate the type of ring. The size
of pipes for which they are to be used the manufacturer’s name or trademark and the
month and the year of manufacture.
The rings shall comply wi th IS 5382 regardin g thei r material finish tole rance in
dimension and physical requirement.
The rubber rings shall be such that they shall not show an y signs of deterioration for
any reaso n during the cont ract period plus the defects liability period, Entire
Signature of Bidder Page 37 of
Ahmedabad Municipal Corporation
expenses associated with correctin g defects in this regard includin g replacement of
rubber rings shall be fully borne b y the contractor.
In jointing cast iron spigot and socket pipes and fitting with tycoon flexible joints
the contractor shall t ake into account the manufacturer’s recommendations as to the
methods and equipment to be used in assembling the j oints. In particular the
contractor shall ens ure that the spigot end of the pipe to be jointed is smoot h and
has been properly chamfered that the rubber ring as per IS 5382 is correctly
positioned in the socket and that the two pipes are accurately in line, before th e
joint is maed. The rubber rings and any recommended lu bricant shall be obtained
only through the pipe supplier or as directed b y the Engineer.
LEAD CAULKING JOINT S
The jointing s hall be done with molten lead and spun yam. Pin lead shall be of
uniform qualit y clean and free from foreign materials. It shall be of uniform softness
capable of being easil y caulked or driven. It shall conform to IS: 7 82 Spun yarn
shall be of clean hemp and of good quality. It shall conform to IS: 6587 Its quantit y
shall be as follows.
Qua ntities of spun Yarn for Different Sizes of Pipes
(Materials for singl e collar joi nts)
Note: Under s pecial circumstances the Engineer-in-charge may decide the
quantities of spun yarn depending upon the site conditions.
The quantity of different diame ters of C.L. pipes and fittings shall
QUNTITIES OF LEAD YARN FOR DIFFERENT SI ZE S OF PIPE S
Signature of Bidder Page 38 of
Ahmedabad Municipal Corporation
Note: The quantities of lead given are provisional and a variation of 20 percent
is permissible either way.
Lead shall be heated in a meltin g pot kept in eas y reach of the joint to be poured so
that the molten metal will not be chilled in being carried from the melting pot to the
joint and shall be brought to a proper temperature so that when stirred it will show a
rapid change of color. Before pou rin g all scum shall be removed. Each joint shall be
made with one cont inuous pou r filling of the entire joint space with solid lead.
Spongy or i mperfectly filled j oints shall be burnt out an d repaired.
The joint runner shall fit snugly against the face of the socket and the outside of the
pipe shall be dammed with clay to from a pouring lip to p rovide for filling the joint
flush with the face and to the top of the socket.
The jointed is d one by first caulking in spun yam, then filli ng the remainder of the
joint space b y running in molten lead, taking care that no dross enters the joint and
then thoroughly caulking the lead. The spun yam shall be used to center the spigot in
the socket and t o preven t the flow of molten lead into the bo re of the pipe.
After t he lead has been run into the j oint the lead shall be thorou ghly caulked.
Caulking of joints shall be done after a convenient length of the pipes has been laid
and leaded. The leading ri ng shall first be removed and an y lead outside the sock et
shall be removed with a flat chisel and then joint caulked removed with a flat chisel
and then the joint caulked around thre e times with caulkin g tools of increasing
thickness and hammer of 2 k g. Weight Lead run joints shall be preferably finished
mm behind the socket face. The joints shall not be covered till the pipe line has been
tested under specified hydrostatic test pressure, thou gh the rest of the pipe line
shoul d be covered up to prevent expansion and co ntracti on due to variati on in
Signature of Bidder Page 39 of
Ahmedabad Municipal Corporation
Filling available excavated earth (excluding rock) in trenches plinth sides of
foundation etc. in layers not exceeding 20 cams. In dep th consol idating each
deposited layer by ramming and watering.
The refilling will generall y refer to refilling of pipe lin e trenches, foundation
trenches up to plinth level or ground level with excavated stuff selected soil brou ght
Clearing or Trenches or Ground:
The excavated trenches for foundation or ground over which fillin g is to be don e
shall be cleared off all grass loose stones rubbish of all kind s brick bats as well as
tress roots etc.
They s hall be well watered before stuff is laid.
Removi ng & recover of existing CI/DI pipe line. Carti ng it to the munici pal
Stores as per instruction of Engg. In c harge.
These items relates to recoveri ng of existing water pipe line of any material and any
dia. Which includes reco vered the existing pipes from t renches including all fittin gs
and valves. Materials should be stacked and carted from site to the AMC stores as
directed by En gineer in charge. Recovering of pipes and fittings specials and val ves
with tail pieces shall be so that min. damage in pipe lines and no dama ge shall be in
fittings and valves. Rate also includes chiseling and cuttin g of serviceable pipe end
with necessary tools & equipments and then after recover pipes shall be credite d
into store so t hat serviceable pipes shall measure in rmt. And scrapped or damaged
pipes or broken pieces shall be measured in kg.
Laying of pipes and fittings/specials
All precautions shall be taken during excavation and layi ng operations to guard
against possible damage to any existing structu re/ pipeline of water, gas, sewage etc.
After excavation of trenches, pipes shall not be lowered unless the dimensions of
trenches and bedding wo rk for pipes at the bottom of t he trenches are approved and
measured by Owner/Engi neer. Pipes and fittings/specials shall be carefully lowered
in the trenches. Spec ial arran gements such as cranes, t ripods with chain pulley block
for lowering t he pipes and fittings/ specials shall be made by Contractor. In no case
pipes and fittings/ specials shall be dropped. Slings of canvas o r equally non-
abrasive material of suitable width or spe cial attachment to fit the ends of pipes and
fittings/ specials shall be used t o lift and lower the coated pipes and
fittings/specials. The pipes and fittings/specials shall be inspected for defects and be
rung wit h a light hammer preferably while suspended to detect cracks. If do ubt
persists, further confirmation shall be done b y pourin g a little kerosene/dye on the
inside of the pipe at the suspected spot. No sign of kero sene/dye should appear on
the outside su rface. Pipes and fittings/specials damaged during lowering o r align ing
shall be rejected by Owner/ Engineer.
All the pipes are t o be laid perfectly true both in alignment and to gradient
specified. In case of spigot and socket pipe the socket end of the pipe shall face
Signature of Bidder Page 40 of
Ahmedabad Municipal Corporation
upstream, except when the pipeli nes runs uphi ll in which case the soc ket en ds
shoul d face the upgrade. The lying of pipes shall always proceed up grade of a slope.
After placing a pi pe in the trench, the spigot end s hall be entered in the socket and
the pipe forced home and aligned to required gradien ts. The pipes shall be secu red
in place with approved backfill material tamped under it except at the socket. Pi pes
and fittings/ specials which do not allow a sufficient and uniform space for joints
shall be removed and replaced with pipe s and fittings/ specials of proper dimensions
to ensure such uniform s pace. Precautions shall be taken to prevent d irt f rom
entering t he jointing space. At times when pipe laying is not in progress, the open
ends of pipe shall be closed by a watertight plu g or other means app ro ved b y Owner/
Engineer. During the period that the pl ug is on, the C ontractor shall take pro per
precautions against floatin g of the pipe owin g to entry of water into the trenc h.
Wherever it is necessary to deflect pipe form a straight line, either in the ve rtical of
hori zontal plane, to avo id obstruction or where long radiu s curve are permitted the
deflection allowed at joints shall not exceed 2 1/2o. In case of pipes, with joint to b e
made with loose collars, the colla rs s hall be slipped on before the next pipe is lai d.
The pi pes shall be laid such that the marking on pipes appears at the top of the
The cuttin g of pipe for inserting valves, fittings or specials shall be done in a neat
and workman like manner without dama ge to the pipe so as to leave a smooth end at
ri ght angles to the axis of the pipe. For this p urpose, p ipe-cutting machine shall be
The Mode of measurement and rate for item shall be given as per one running meter
Item No. 13: Removing & relaying of existing CI/DI pipe line & Specials, Cleaning of pipe & Specials from
Inside, including excavation, refilling etc. comp. in line
& level with any type of joints as per instruction of engg. in charge.
Refer Specification of Iteam No.
The Mode of mea suremen t and ra te for item sha ll be g iven as per one ru nnin g m eter
Item No. 14 Labours charges for collecting specials from Municipals store loading , transportation,
unloading to the site, laying and fixing CI specials inclusive of all jointing materials like lead, spun
etc.and labour, exacavation re-filling and nece. dewatering as per instrucation of engg. incharge.
Refer Specification of Iteam No.
The Mode of m ea suremen t a nd ra te fo r item sha ll be given a s per o ne kilogra m ba sis.
Signature of Bidder Page 41 of
Ahmedabad Municipal Corporation
Item No. 15: Labour charges for installing and jointing Sluice Valves including loading, transporting from
owner's store, lowering in location to the required with excavation refilling alignment by crane/ tripod and
chain block including cost of total nos. of nuts, bolts, Necessary gaskets and excluding fixing of tail pieces
with lead & jute etc complete as directed by Engg. in charge.
Refer Specification of Iteam No.
The Mode of m ea suremen t a nd ra te fo r item sha ll be given a s per o ne number b asis.
Item No. 16 Cutting of existing pipelines of following diameters including carting of nece. specials
from AMC store to site and from site to AMC store (recovered materials) nace. labours for
excavation, jodan & backfilling fitter, supervisor, etc. complete. Rate also includes electric cutter,
dewatering pump fuel and transportation of machineries, chain pulley block if requires working at
an instructed specific time of day or night etc. complete.
Refer Specification of Iteam No.
The Mode of m ea suremen t a nd ra te fo r item sha ll be given a s per o ne number b asis.
Item No. 17 Supplying, Labour For Excavation Of All Types Of Soil At Any Depth Including
Excavation Of Asphalt Pavement Of Any Thickness, Demolition Of Brick Work In Cm Of Any
Proportion Including Stacking Of Serviceable Materials And
Disposal Of Unserviceable Material Etc. Comp. As Directed.
La bou r sha ll be sup ply fo r f ull shif t du ty, min im um & ho urs witho ut recess tim e
a lso Muka rdam, Supervis ion sh ould be pro vid ed fo r ful l sh ift duty withou t recess time n o
labour should be a llowed belo w 1 8 yea rs as per la bour a ct, in a ll sites. All la b ours should
be fit fo r such type of b rea k d own work fo r d ay & n igh t if la bours n ot don e work p roperly
a s reqd. la bour sho uld be rem oved from site. It mo re th en 10 la bour on site per day
con tra ctor mu st have la bour licence.
The Mode of m ea suremen t a nd ra te sha ll be given a s per on e numb er ba sis
Item No. 18 D ewatering by pump in g set of req uired capaci ty in clud in g temporary
p latfo rm carting p ump ing at s ite an d fixin g the same in pos itio n inclu ding all
accessories, and f ue l an d labour e tc. Comp le te (A) Pump se t of Capacity
The Mode of m ea suremen t a nd ra te sha ll be given a s per HP /Hr. ba sis
Signature of Bidder Page 42 of
Ahmedabad Municipal Corporation
Item No. 19 Providing & Supplying JCB Machine on rental basis in case of emergency situation and
break down type work & also during unavoidable condition as per instruction of engg.incharge
rate includes all nece. shifting, fuel and operating charges and stacking of useful & non-useful
materials separately up to store. (No payment should be allowed for non working condition of
machinery and for pipe line excavation and laying work)
Providi ng & Supplying J CB Mach in e o n renta l ba sis in ca se o f emergen cy situa tion a nd
brea k down type wo rk & al so du ring una vo id able condition a s per in structio n of
engg .in cha rge , rate inc ludes a ll n ece. sh ifting, fuel and op era ting cha rges a nd sta cking of
usefu l & non -useful ma terials sepa ra tely up to sto re. (No p a yment shou ld be a ll owed fo r
no n wo rkin g condi ti on of ma chinery a nd for pipe lin e exca va tion and l aying work).
The Mode of m ea suremen t a nd ra te sha ll be given a s per on e hou r basis.
ITEM N O. 20 Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by
using Operator, fuel, power Supply etc. Complete as Directed. (No payment should be allowed for non
working condition of machinery and for pipe line excavation and M.H. work. Allowed only for break down
Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by using Operator,
fuel, power Supply etc. Complete as Directed. (No payment should be allowed for non working condition of
machinery and for pipe line excavation and M.H. work. Allowed only for break down work)
The Mode of m ea suremen t a nd ra te sha ll be given a s per on e hou r basis.
Item No. 21 Excavation for trail pit of maximum diamension of 1.5 mt x0.75 x 1.5 mt depth for
location of existing line including excavation but excluding cost asphalt cutting but including
refilling, watering etc. comp as per instruction of Engg in charge.
It inclu des exca va ti on in any length , breadth & depth fo r lo ca tin g existing pipe lin e
or va lve of a ny Di ameter a s per i nstructio n of site i n-cha rge. Mea surement pa id in on e
The Mode of m ea suremen t a nd ra te sha ll be given a s per on e numb er ba sis.
Item No. 22: Labour charges for doing washout of water pipe line at end including necessary excavation
refilling the pir. Allowing the water to flow for 15 minutes twice or thrice as per site condition during supply
hour, dewatering the pir and plugging with existing wooden butch. etc. comp. as per instruction
Labour charges fo r doin g washout of water pipe line at end including necessary
excavation refilling the pit. Allowing the water to flow for 1 5 m inutes twice or
Signature of Bidder Page 43 of
Ahmedabad Municipal Corporation
thrice as per site condition during suppl y hour, dewaterin g the pit and pluggin g wit h
existing wooden butc h. etc. com p. as per instrucion
The Mode of m ea suremen t a nd ra te sha ll be given a s per on e numb er ba sis.
Item No. 23: P/S OF good quality of rubber rings for following dia meter.
This Specif ica ti on covers the men tioned supply item s fro m o pen market & supp lied a t
a n munici pa l store or site of wo rk.
APPLICABLE CODES :
IS: 638 Specification for sheet rubber jointing and rubber inserting jointing.
IS: 5382 Specification for rubber sealing ring for Gas mains water and sewers.
The Mode of mea su remen t a nd ra te sha ll be given a s p er on e number ba sis.
Item No. 24: Supplying wooden taper bunches from jungle wood (Like limda, ambo) Etc.comp.
The wood en ta per plug shou ld be mad e from country wood a s per the sa mple an d suitable
to the / dia of p ipe and sh oul d be free f rom cra cks.
The size of wooden plug should the plu g ca n ea sily entered in pip e and fixed p roperly
with the co nnectio n o f pipe so tha t wa ter m a y not teak through plug and ca n easily
removed a s and where required.
The Mode of m ea suremen t a nd ra te sha ll be given a s per on e numb er ba sis.
Item No. 25 Labour ch arges f or repairing of s lu ice v alve / re flux valve
in cluding materials , labo urs and testing etc.,complete (B)Replacing o f Glan
p ack ing o nly
The Mode of m ea suremen t a nd ra te sha ll be given a s per on e numb er ba sis.
Item No. 26 Providing, laying and jointing glazed stoneware pipes including excavation upto 2 mt.
refilling, transporting pipes to work site, unloading, lowering in trench, laying and jointing pipes
including all jointing materials such as cement, sand, hemp bitumen as directed, including
Signature of Bidder Page 44 of
Ahmedabad Municipal Corporation
watering the trenches spreading and carting away of surplus earth within 100 mts. lead as directed
The pipes shall be of best quality stone ware pipes. The pipes shall be of approved quality and make
and shall be brought on site after approval. (The pipes shall be laid in grade as per instruction)
contractor shall have introduced bills for standard pipes.
The joints shall be done in cement prop. (1 : 1) (1 part cement : 1 part sand) using spun yarn dispend
in hot asphalt and caulking tools. The hydraulic pressured test shall be given be the contractor for
testing pipes and jointing. No. trenches shall be filed without the approval of the Engineer in charge.
The rate of the pipes work are inclusive of excavation and refilling. The excavation etc. shall be done
The sewer trench shall be excavated to the alignment and gradient as per instructed. In all sorts soil including
masonary asphalt roads and wet excavation . The sewer excavation shall be commenced at the downstream
end of the sewer and be continued up to the gradient as directed. The trench shall not open more than
meters in advance of the completed sewer only when directed by the Engineer in charge looking to the
progress of the work in obtaining the formation of the bottom of the trenches the usual methods of suing
sight rails and bonning roads shall be adopted during the whole of the process. The center line of uniform
height shall be carried clearly on each rail.
The depth of the excavation and invert of the sewer shall be checked by means of bonning road of
appropriate length and also straight edge.
The bed of the trench be shall well remmed before starting laying of sewer lines and cement concrete and
masonary work. Where trenches are deep in bad grounds the sides shall be supported by suitable timbering
of shorting work looking to the nature of soil near big or important structures, the sides of the trenches shall
be closely and securely timbered. If any settlement of the building is anticipated the timbering shall be left in
the ground. The various materials excavated shall be separately stacked so that in refilling the may be re-laid
on the same order as before and least possible damage shall be done carpet on the public roads and private
properties. Surface covering consisting of asphalt carpet shall be kept on one side and preserved for
reinstatement. The excavated earth shall not heaped near the trenchers so as to caused unnecessary
obstruction along the pulling inspection, trenches etc. shall be tunneled under only as necessary. The side of
the trenches shall be nearly vertical and plumb & red light shall be placed at each end at intervals as
instructed and further protested by rope fence. Necessary caution boards shall also be erected and diaced as
directed by the Engineer in charge.
Wherever possible material excavated from the trenches of whatever kind shall not placed nearer than
meters from the outer edge of the excavated trench. The utmost shall have to be taken in refilling the
Signature of Bidder Page 45 of
Ahmedabad Municipal Corporation
trenches so that no damage may be done no sewer no lump shall be allowed to be put around the sewer. The
remming of the filling shall be done and well watered. The surplus earth shall be removed directed within
meters lead. The measurement of the work shall be exact length and width of the trench as specified or as per
City Engineer instruction and depth shall be measured vertical as per section up to invert or the pipe lind The
Engineer in charge reserves the right of extra excavation on either side if considers necessary for the safely of
the work. The bottom and sides of the trench shall be dressed in level and plumb in all directions before any
concrete laid. In case the excavation is done deeper than required no filling shall be allowed to bring the
formation to proper level but contractor shall have to lay cement or lime be concrete of filling or other
acceptable materials as directed by engineer at contractor won cost so as to come to proper information, in
case bas formation are met with the work shall have be done as per instruction of engineer necessary
arrangements for watering trenches must be provided be contractor and without proper watering trenches
will not be allowed to be tilled to further. Contractor shall have to make arrangement for access to invert of
the sewer and for inspection of the ware as ordered by the Engineer.
In case no work shall be done at night or on Sundays & other holidays and during the recess time except in
and other holiday the case of bad grounds such as running sand where the work must be executed various
day night without interruption when so ordered by the Engineer.
All existing water pipe storm drains sewer line railway tract, electric cables etc. which do not in the opinion of
Engineer required to be charged in location shall be supported and protected from injury by the contractor.
The contractor shall be liable to pay all damages to water pipe, drains electric and telephone cables and to
private property during the execution of this contract and the same will be recovered from the running bills or
the deposit of work whenever it becomes necessary in the opinion of the Engineer in charge location of any
existing sewers drains etc. not otherwise from in these specification the contractor shall do the work of
making such change and the work shall be paid for as extra work. All places of public utility etc. shall be kept
accessible for use.
No extra payment shall be made for land sides and side slopes done without prior approval of the Engineer in
Wherever natural soil commends winder excavation the mentioned above the same shall be given after
approved by Engineer in charge. The rate for excavation for easy jointing and caulking nothing extra shall be
paid for this. Refilling of trenches shall be done only after the grade of line and hydraulic test practicable of
the lines are checked and approved of and order given by the Engineer in charge. The refilling shall be
accompanied by through watering the layers of 0.50 metrs. Further refilling shall be done there after and
process should be repeated till trenches are completely refilled. Temping and ramming with rammers shall
have to be done at all place of important work where ordered by Engineer in charge. After the trench is give
the trenches shall have to be refilled within 4 days with complete watering. If the contractor fails to do
watering satisfactory corporation shall get it done at the risk and cost of the contractor with or without giving
any notice and the expenses incurred in doing so recovered from the contactor either in cost or from his
payment through bills.
Signature of Bidder Page 46 of
Ahmedabad Municipal Corporation
The Mode of m ea suremen t a nd ra te sha ll be given a s per on e running meter ba sis
Item No. 27 Fixing of valve Road box incl .locating valve, nece. excavation, Brick Masonary,PCC
work. Item also inclues cartring form AMC store to site. Etc.Comp. as directed.
Fixing of valve Road box incl .locating valve, nece. excavation, Brick Masonary,PCC work. Item also inclues
cartring form AMC store to site. Etc.Comp. as directed
The Mode of m ea suremen t a nd ra te fo r item sha ll be given a s per o ne number b asis.
Item No. 28 Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the Material with water at OMC in mechanical mix
plant carriage of mixed Material by tipper to site, laying in uniform layers in sub- base / base
course on well prepared surface and compacting with plate compactor to achieve the desired
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by
tipper to site, laying in uniform layers in sub- base / base course on well prepared surface and compacting
with plate compactor to achieve the desired density
For detailed specification refer latest edition of MoRTH.
The Mode of measurement and rate shall be given as per one cubic meter basis..
ITEM NO :29 To provide Tractor with Hydraulic Trolley, driver with fuel, to carryout different works
during day/night for 12 Hrs. Shift. Work shall be carried out as per the instructions of
Engineer In-Charge. No extra charged shall be paid for night shift.
This item relates to provide Tractor with Hydraulic Trolley, driver with fuel, to carryout
different works during day/night for 12 Hrs. Shift. Work shall be carried out as per the
instructions of Engineer In-Charge. No extra charged shall be paid for night shift.
M/s. shall be on Shift. basis.
Item No. 30 Barricadding The Entire Break Down Or Excavated Area On Rental Basis Using Wooden
Ballies / M.S.Angles At Max. 2.00 Meter Center To Center, C.G.I. Sheet, Reflective Paint Out Side
To Avoid Accident & For Smooth Traffic Diversion & Movement Including Cautionary Board
Etc...The Same Shall Be Removed After Compleion Of Work.
Signature of Bidder Page 47 of
Ahmedabad Municipal Corporation
Barricade, Erection of a temporary fence wall to segregate the existing area from the RCC
road construction site. The fence shall be at least 1.2 m high and should efffectively barricade the
site from Road. The fencing shall consist of new C.G. I. sheets supported appropriately by pipes
horizontally as well as vertically. Verticles shall be fixed to base plates of atleast 300x300 mm to rest
on firm ground. if necessary, inclined props to be intervals to make the fence stable.
The Mode of measurement and rate shall be given as per one running meter basis.
Item No. 31: Reinstatement of Asphalt road/any kind of paving/flooring using the same material.
The Mod e of mea su rement and ra te sha ll b e given a s p er on e sq meter ba sis
Item No. 32: Providing , Supplying and fixing ISI mark approved quality for ferrul connecting to
existing CI/DI pipe line of water tight joints per inst.of engg. in charge.
Providing , Supplying and fixing ISI mark approved quality for ferrul connecting to existing CI/DI pipe
line of water tight joints per inst.of engg. in charge.
The Mod e of mea su rement and ra te sha ll b e given a s p er on e numb er ba si s
Item No. 33 Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged
brick work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps
and existing MH sheet cover, removing the debris
from MH and carting the same as directed.
(a) Up to 0.15 mt. (@ Two Coarse)
(b) up to 0.35mt. (@ Four Coarse)
(c) up to 0.65 mt. (@ Seven Coarse)
Raising/ Lowering Of Existing Mh/Catch Pit up to surface road level removing old brick masonry up to
0:30 m costs. Masonry in C.M. 1:5 with cement plaster inside and outside up to 0.30 m incl. Fixing etc. comp.
As dire of the officer in charge of work.
This item relates to repairing existing manhole of any size with removing first existing seat & cover including
demolishing existing loose masonry work up to from GF level to 0.30 mt. depth & upto same height brick
work in CM 1:5 shall be completed & after completion of brick work plastering work in CM 1:3 shall also be
done. After completion of brick work & plastering same manhole seat & cover fixing at top.
The Mode of measurement and rate shall be given as per one number basis.
Signature of Bidder Page 48 of
Ahmedabad Municipal Corporation
Item no 34 Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick masonry
in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing chamber sheet cover, removing
the debris from chamber and carting the same as directed.
Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing chamber sheet cover,
removing the debris from chamber and carting the same as directed.
The M/s shall be on No. basis.
Item No. 35: Labour Work for temp Jodan of ex.line for running water supply incl making collar between
gap of pipe & jointing with jute & day after removing all this as per inst etc.comp as dire.
Labour Work for temp Jodan of ex.line for running water supply incl making collar between gap of pipe &
jointing with jute & day after removing all this as per inst etc.comp as dire.
The Mode of m ea suremen t a nd ra te sha ll be given a s per on e numb er ba sis.
Item No. 36 Conveyance charge of earth ,lime,murrum, building rubbish,manual
garbage,sludge,excavated rock ,fly ash,aggregate of any kind etc. comp.up to 5.0 Km. lead.
All the surplu s earth etc. sh a ll b e ca rried a wa y immed ia tely f rom the site o f wo rk to a
place within 5km. d istance or a s directed a nd o rd ered by the Engineer, so as not to ca use
a ny in convenien ce to the p ublic tra ff ic fin din g which in view of public sa fety a n d traff ic
con veni ence. Th e co rpora tion shal l ca rry out the work b y any o th er agency a t the
con tra ctor’ s risk and cost. If the in structions a re no t co mpleted with in 7 da ys fro m the
da te of order to ca rt the surplus ma teri als a nd clea r the site, the sa id work shall be
ca rried out by the Municip a l Corpo ratio n a t the risk an d co st of the co ntra ctor and no
cla im or d ispute sha ll be enterta ined in th is respect.
If th e f ill ing in trenches a f ter settlemen t of the ea rth f ill ing in trenches i s to be done and
the sa me shal l be ca rried o ut b y the contrac to r withou t a sking any extra ra te. T h e
con tra ctor sha ll h a ve to ca rt the surp lus ea rth af ter the trench es we will wa tered a nd
refilled with the sa nd. Th e ra te of ca rting inclu din g ca rting of bri ckba ts, meta l, rubb le
veg etable and ga rba g e, if necessary to clea r the road surface.
The Mode of m ea suremen t a nd ra te sha ll be given a s per on e cubic m eter ba sis.
Item No.37: Dismantling of any type of tiles/flooring work including striking of serviceable
material and is of unserviceable materials with all leads and lift.
Signature of Bidder Page 49 of
Ahmedabad Municipal Corporation
Demolishing work shall be carried out as per instructions given by the Engineer in charge.
Demolishing of stone slab pavement or any other type of paving, proportion of cement or lime, sorting out
materials, carting them up to lead of 60 mts. & Stacking the different materials separately as directed by the
Engineer in charge of work. The work shall be done carefully.
The Mode of measurement and rate shall be given as per one square meter basis.
Item No.38: Labour Work For Fixing Any Kind Of Paving With Cement Pointing In Cm 1:2, Including
Watering, Ramming Etc Comp. As Dir.For PavementSub:-(A)Laying On Sand Bedding As Per
Requirement To Fix The C.C.Block / Nibhada Stone In Line & Level
Nimb hada stone o f o rdina ry qual ity. pa ving o n 37 mm to 50 mm th ick/C.C. bl ock of size
45 x 30 x 4. Shal l b e used of ap p. qua l ity o n a vera ge 5.00 cm. thick sa nd beddin g incl.
cem ent poi nting in prop. of C.M. 1:2. Necessary wa tering cu ring etc. u p to 7 days shal l be
Necessa ry ex cavation sh a ll be do ne to the reqd. d epth & level & grad e a s sh own to th e
con tra ctor. The fou nda tio n b ed sho uld be watered and consolida ted befo re th e b edding is
The su rplu s ea rth sha ll be remo ved b y the co ntracto r with in in a lea d of 30 m ts a s
instructed & du mp will b e leveled b y th e co n tra ctor. The san d shall be clear & co arse.
The stone sha ll b e la id in line level & gra di ent reqd. No pa rt of ston e sha ll b e la id
projected. The jo int sha ll be ¾” mm thick. Staggeri ng of the jo int sha ll be provi ded if so
Fo r p ointing of a ll the j oi nts sha ll be ra cked out to fu ll dep th while the morta r ha s no t set
du ring the la ying of ston e. Th e join t sh all b e po inted with n eat cemen t so that the surface
ma y be smoo th & f lush with the sla b. Wa teri ng sh all be do ne fo r 7 da ys. For cem ent
po in ti ng C.M. sh all be o ne pa rt of cement a nd two parts of sa nd to full dep th etc.
comp lete a s req uired as d irected.
The Mode of m ea suremen t a nd ra te sha ll be given a s per on e sq uare m eter ba sis.
Item No. 39 Supplying And Fixing Nimbhada Ladi 37 To 50 Mm Thick For Walk-Way, Covering The
Activity Of Excavation, Ramming, Laying On Sand Bedding As Per Requirement To Fix The Nibhada
Stone In Line & Level With Cement Pointing In Cement Mortar 1:2 Etc Complete As Directed.
Nimb hada stone of ordin a ry qua lity pa vi ng on 37 mm to 50 mm th. sha ll be used of
a pp ro ved qua li ty on avera g e 5 .00 cm. thick sand bedd ing incl. cemen t po inting in pro p. of
C.M. 1:2. Nece ssary watering curing etc. up to 7 da ys sha ll b e done.
Signature of Bidder Page 50 of
Ahmedabad Municipal Corporation
Necessa ry ex cavation sh a ll be do ne to the reqd. d epth & level & grad e a s sh own to th e
con tra ctor. The fou nda tio n b ed sho uld be watered and consolida ted befo re th e b edding is
The su rplu s ea rth sha ll be remo ved b y the co ntracto r with in in a lea d of 30 m ts a s
instructed & du mp will b e leveled b y th e co n tra ctor. The san d shall be clear & co arse.
The stone sha ll b e la id in line level & gra di ent reqd. No pa rt of ston e sha ll b e la id
projected. The jo int sha ll be ¾” mm thick. Staggeri ng of the jo int sha ll be provi ded if so
instructed. For pointing of al l the joints sha ll be ra cked out to f ull dep th wh ile th e mo rta r
ha s no t set during the la ying of stone. Th e jo in t sh all be po inted with nea t cement so that
the surface ma y be smoo th & flu sh with the sla b . Wa tering sha ll be don e fo r 7 d ays. Fo r
cem ent poi nting C.M. shal l be one pa rt o f cem en t and two parts o f sand to f ull d epth etc.
comp lete a s req uired as d irected.
The Mode of m ea suremen t a nd ra te sha ll be given a s per on e sq uare m eter ba sis.
Item No : 40 Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10) for
foundation, C.C.Channel (1:2:4), finished 15 mm thick cement plaster inside in CM 1:3,
finishing with cement slurry, Brick masonary in CM 1:5 & excluding the cost of chamber
seat cover etc.completed.
0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90 meter
0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 0.90 meter.
0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to 1.20 meter.
The sewet trench shall be excavated to the alignment and gradient shown on the plan and section. In
all storts soil including oil masonary asphalt roads and wet. excavation . The sewer excavation shall be
commenced at the down stream end of the sewer and be continued upto the gradient as directed. The
trench shall not open more than 60 meters in advace of the completed sewer only when directed by
the Engineer in charge looking to the progress of the work in obtaining the formation of the bottom of
the trenches the usual methods of suing sight rails and bonning roads shall be adopted during the
whole of the process. The center line of uniform height shall be carried clearly on each rail. The depth
of the excavation and invert of the sewer shall be checked by means of bonning road of appropriate
length and also straight edge.
The bed of the trench be shall well remmed before starting laying of sewer ines and cement concrete
and masonary work.
Where trenches are deep in bad grounds the sides shall be supported by suitable imbering of shorting
work looking to the nature of soil near big or important structures, the sides of the trenches shall be
closely and securely timbered. If any settlement of the building is anticipated the timbering shall be left
in the ground. The various materials excavated shall be separately stacked so that in refilling the may
be relaid on the same order as before and least possible damage shall be done carpet on the public
roads and private properties. Surface covering consisting of asphalt carpet shall be kept on one side
and preserved for reinstatement. The excavated earth shall not heaped near the trenchers so as to
caused unnecessary obstruction along the pulling inspection, trenches etc. shall be tunneled under
Signature of Bidder Page 51 of
Ahmedabad Municipal Corporation
only as necessary. The side of the trenches shall be nearly vertical and plumb & red light shall be
placed at each end at intervals as instructed and further protested by rope fence. Necessary caution
boards shall also be erected and diaced as directed by the Engineer in charge.
Wherever possible material excavated from the trenches of whatever kind shall not placed nearer than
3 meters from the outer edge of the excavated trench. The utmost shall have to be taken in refilling
the trenches so that no damage may be done no sewer no lump shall be allowed to be put around the
sewer. The remming of the filling shall be done and well watered. The surplus earth shall be removed
directed within 30 meters lead. The measurement of the work shall be exact length and width of the
trench as specified or as per City Engineer instruction and depth shall be measured vertical as per
section upto invert or the pipe lind The City Engineer reserves the right of extra excavation on either
side if considers necessary for the safely of the work.
The bottom and sides of the trench shall be dressed in level and plumb in all directions before any
concrete in India. In case the excavation is done deeper than required no filling shall be allowed to
bring the formation to proper level but contractor shall have to lay cement or lime be concrete of
filling or other acceptable materials as directed by C.E. at contractor won cost so as to come to proper
information, in case bas formation are met with the work shall have be done as per instruction of C.E.
necessary arrangements for watering trenches must be provided be contractor and without proper
watering trenches will not be allowed to be tilled to further. Contractor shall have to make
arrangement for acees to invert of the sewer and for inspection of the ware as ordered by the
Engineer. If is required to shired or after the alignment section of diameter of the pip the contractor
shall carry or altered the alignment section or diameter of the pipe the contractor shall carry out the
altered work at the rates quoted by him for the original work for items and contractor shall not claim
any expenses due to the changes made.
In case no work shall be done at night or on Sundays & other holidays and during the recess time
except in and other holiday the case of bad grounds such as running sand where the work must be
executed various day night without intruption when so ordered by the Engineer.
All existing water pipe storm drains sewer line railway tract, electric cables etc. which do not in the
opinion of Engineer required to be charged in location shall be supported and protected from injury by
the contractor. The contractor shall be liable to pay all damages to water pipe, drains electric and
telephone cables and to private property during the execution of this contract and the same will be
recovered from the running bills or thedeposit of work whenever it becomes necessary in the opinion
of the Engineer in charge location of any existing sewers drains etc. not otherwise from in these
specification the contractor shall do the work of making such change and the work shall be paid for as
extra work. All places of public utility etc. shall be kept accessible for use.
No extra payment shall be made for land sides and side slopes done without prior approval of the
Engineer in charge.
Wherever natural soil commends winder excavation the mentioned above the same shall be given
after approved C.E. The rate for excavation for easy jointing and caulking nothing extra shall be paid for
Refilling of trenches shall be done only after the grade of line and hydraulic test practicable of the lines
are checked and approved of and order given by the Engineer in charge. The refilling shall be
accompanied by through watering the layers of 0.50 metrs. Further refilling shall be done there after
and process should be repeated till trenches are completely refilled. Temping and ramming with
rammers shall have to be done at all place of important work where ordered by Engineer in charge.
Signature of Bidder Page 52 of
Ahmedabad Municipal Corporation
After the trench is give the trenches shall have to be refilled within 4 days with complete watering. If
the contractor fails to do watering satisfactory corporation shall get it done at the risk and cost of the
contractor with or without giving any notice and the expenses incurred in doing so recovered from the
contactor either in cost or from his payment through bills.
The brickbats shall be of new bricks, hared well burnt and broken to 40 mm nominal size. These shall
be free from earth and shall be got app. use. Sand shall be clear coarse, sharp and free from earth and
other impurities. Mixing shall be done on brick or stone platform or of brickbats to mortar shall be
measured in heaps by brick height irregular measure. If ordered by C.E.
Concrete shall be laid in layers of 15 cms. and well consolidated maintained by the contractor for
before commencing the brick work. over boxes, concrete shall be well watered. The mix shall be done
in prop. of 1 : 5 :
Cement shall confirm to M-3, sand shall confirm to M-6, coarse agg. shall confirm to M-13, water shall
The prop. of the cement of sand coarse agg. shall be 1 : 5 : 10 i.e. 1 part of cement, 5 part of sand and
10 parts of coarse agg. by volume. and the work shall be carried out as per inst. of Engineer in charge
and as per C.3.
Brick work cement mortar :
Bricks shall be table brick confirming of approved kiln specifications as laid sown n PWD Hand book
NO. 2. These shall be well burnt and free from all defects and shall be got approved by the Engineer in
charge before the work is started. Cement to be used for mortar shall comply with PWD Hand book
specifications, cement mortar in the brick work shall be 1 part of cement, 5 parts of sand. Every brick
well sacked in water is required to be laid I full & closed joints of cement mortar the thickness of which
shall not exceed 1.25 cms. If on removal of centering any open joint shall be found, these shall be
pointed immediately. Special care shall taken to make the face of brick work smooth brick work shall
be toothed or shall racked back in coarse.
All intrades of curves shall be worked from temple strictly made to dimensions as per 1974-75 latest
plan and section approved by C.E.
Brick work in general shall be of first class workmanship & shall be executed according to the plan
working proper dimention & as directed by the Office in charge from time to time. Brick should be
thoroughly wetted in water before use. All brick work to be cleaned & wetted before laying cement
mortar shall be prepared in special iron pals. And mixed bag of 1.25 cft. or 1 cft. as measured as the
case may be. All materials shall be stacked in one side so as not to obstruct traffic in any way. The
masonry should be constructed in proper workmanship like manner with jointing plumb etc. to confirm
with the general specification No. 45 PWD Hand Book. The face work should be nearly finished. The
shall be kept watered for a week at least three days after the date of completion.
Providing and laying cement concrete 1:2:4
Signature of Bidder Page 53 of
Ahmedabad Municipal Corporation
(1 cement :2 coarse sand :4 graded stone aggregate 20 mm nominal size)
RCC Work :- In general, plain and reinforced concrete work for manholes shall be carried out in
accordance with latest version of IS 456 unless otherwise specified in this specification. The slab of
manhole shall be cast with shutters lined with plywood and shall be
smooth finished. For avoiding surface cracks due to variation in atmospheric temperature and
exposure to direct sunlight, RCC slab of manholes after casting shall be kept wet. M 15 grade of
concrete used for construction of RCC manholes shall have minimum cement content of 360 kg/cum of
concrete. Bar bending schedule for reinforcement shall be prepared by contractor and got approved
from owner/ engineer before proceeding with the work. Minimum cover to the reinforcement shall be
The rate includes cost of all labour, materials, tools and plant etc. required for satisfactory completion
of this item as described above.& the drawing as per A.M.C Dr. S.O.R shall be final. The rate shall be for
a unit of one number basis.
Providing TMT bar.
TMT bars shall conform to M-18. Mild steel binding wires shall conform to M-21
The work shall consist of furnishing and placing reinforcement to the shape and dimensions shows as
on the drawings or as directed.
Steel shall be clean and free from rust and loose mill scale at the time of fixing in position and
subsequent concreting.
Reinforcing steel shall conform accurately to the dimensions given in the bar bending schedules shown
on relevant drawings. Bars shall be bent cold to specified shape and dimensions or as directed using a
proper bar bender, operated by hand or power to attain proper radius of bends. Bars shall not be bent
or straightened in a manner that will injure the material. Bars bent during transport or handling shall
be straightened before being used on the work. They shall not be heated to facilitate bending. Unless
otherwise specified, a ‘U’ type hook at the end of each bar shall invariably be provided to main
reinforcement. The radius of the bend shall not be less than twice the diameter of the round bar and
the length of straight part of the bar beyond the end of the curve shall be at least four times the
diameter of the round bar. In case of bars which are not round and in case of deformed bars, the
diameter shall be taken as the diameter of circle having an equivalent effective area. The hooks shall
be suitably encased to prevent any splitting of the concrete.
All the reinforcement bars shall be accurately placed in exact position shown on the drawing and shall
be securely held in position during, metal hangers, supporting wires or other approved devices at
sufficiently close intervals,. Bars shall not be allowed to sag between supports nor displaced during
concreting or any other operations of the work. All devices used for positioning shall be of
noncorrodible material. Wooden and metal supports shall no extend to the surface of concrete, except
where shown on drawings. Placing of broken stone or brick and wooden blocks shall not be allowed.
Pieces of broken stone or brick and wooden blocks shall not be used. Layers of bars shall be separated
by spacer bars, precast mortar blocks or other approved devices. reinforcement after being placed in
Signature of Bidder Page 54 of
Ahmedabad Municipal Corporation
position shall be maintained in a clean condition until completely embedded in concrete. Special care
shall be exercised to prevent any displacement of reinforcement in concrete already placed. To
prevent reinforcement from corrosion, concrete cover shall be provided as indicated on drawings. All
the bars producing from concrete and to which other bars are to be spliced and which are likely to be
exposed for a period exceeding 10 days shall be protected by a thick coast of neat cement grout.
Bars crossing each other where required shall be secured by binding wires (annealed) of size not less
than 1 mm in such manner that they do not slip over each other at the time of fixing and concreting.
As far as possible, bars of full length shall be used. In case this is not possible, overlapping of bars shall
be done directed. When practicable, overlapping bars shall not touch each other, but be kept apart by
25 mm or 1.25 mm times the maximum size of the coarse aggregate whichever is greater by concrete
between them. Where not feasible, overlapping bars shall be bound with annealed wires not less than
1 mm thick twisted tight. The overlaps shall be staggered for different bears and located at points
along the span where neither shear nor bending movement is maximum.
Whenever indicated on the drawings or desired by the Engineer- in-charge, bars shall be joined by
coup lings which shall have a cross-section sufficient to transpit the full stresses of bars. The ends of
the bars that are joined by coupling shall be upset for sufficient length so that the effective cross
section at the base of threads is not less than norma l cross-section of the bar. Threads shall be
standard threads. Steel for coupling shall conform to I.S.
When permitted or specified on the drawings, joints of reinforcement bars shall be butt-welded so as
to transmit their full stresses. Welded joints shall preferably be located at points when steel will not be
subject to more than 75 percent of the maximum permissible stresses and welds so staggered that at
any one section not more than 20 percent of the rods are welded. Only electric are welding using a
process which excludes air from the molten metal and conforms to any or all other special provisions
for the work shall be accepted. Suitable means shall be provided for holding bars securely in position
during welding. It shall be ensured that no voids are left in welding and when welding is done in two or
three stages, previous surface shall be cleaned properly. Ends of the bars shall be cleaned of all loose
scale, rust, grease, paint and other foreign matter before welding. Only competent welders shall be
employed on the work. the M.S. electrodes used for welding shall conform to I.S. 814. Welded pieces
of reinforcement shall be tested. Specimen shall be taken from the actual site and their number and
frequency of test shall be as directed.
R.C.C. Bedding :
Cement concrete for the bottom portion of manhole shall consist of one part of cement two parts of
sand four parts of black trap metal of other approved material of 0.6 to 2.5 cms size from well graded
as per instruction. The rate includes all necessary materials mixing lifting placing ramming watering etc.
the exposed faces to be neatly finished smooth with cement as per instructions. The concrete work to
kept constantly watered for at least fortnight.
Cement Plaster :
Cement plaster 15 mm thick shall be done using cement mortar of 1 part of cement & 3 parts of sand
in uniform thickness with surfaces trely in plums. The work in general shall comply with general
specifications for plaster No. 64 in PWD hand book. The plaster surfaces to be kept damp at least for a
fortnight. All internal sides of the manholes including soffit of the arch shall be provided with cement
Signature of Bidder Page 55 of
Ahmedabad Municipal Corporation
FRC manhole cover with seat to be set in cement mortar with cement concrete of 1 : 2 : 4 prop.
alround. FRC cover shall be marked with year mar AMC. etc. & arrow showing the direction of flow.
Foot steps shall be of the best quality PVC as specified above true to dimensions. The rate includes
mixing the same in position as directed PVC foot steps of approved design and quality shall have to be
fixed if so ordered by C.E. without extra charges. PVC steps shall be fixed at interval of 37 cm. vertically
& 22 cm. horizontally starting from the invert of the line.
Mode Measurment
The mode of measurement shall be on Nos.
Item No : 41 Constructing Slab Type M.H. Chamber Of The Following Size Including Excavation,
Refilling, Brick Bats Cement Concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of
thickness 10 C.M., finished 15 mm thick cement plaster inside & outside (Only for shaft) In
Cm 1:3, Finishing With Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated Steps 35 Cm C/C
At 35 Cm Staggered Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of thickness 15 C.M.,Including
Cantering & Reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm dia.)But Excluding The
Cost Of Manhole Seat Cover Etc..Completed Of Size 0.75 X 1.00 Meter (Inside Clear, M.H.
length should be parallel to the flow)
(Based on Drainage SOR 2015-16; Item No.14)
1.00 to 2.00 meter depth, (Slab at Ground level)
2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From G.L.)
Manhole shall be provided at every change of alignment, gradient or diameter of
sewer/storm water drains, Bends and junctions in the sewer/drain shall be grouped together
in manhole as far as possoble. The maximum distance between inspection chambers shall be
about 25 meters. Where the diameter of sewer/drain is increased, the soffit of the pipe shall
be fixed at the same level and necessary slope given to the channel of manhole/inspection
chamber. The minimum internal sizes of manhole/inspection chamber shall be as per the
respective item of work. The manhole/inspection chamber shall be constructed as per the
detailed drawings and as directed by Engineer. The bed concrete and the brick masonry shall
be constructed of such thickness as shown on drawing. The brick masonry shall be constructed
in C.M. (1:5), plastered on both faces with 15 mm cement plaster in C.M. (1:3). The channel
shall be semicircular in the bottom half and of diameter equal to the sewer/drain. Above the
horizontal diameter, the sides shall be extended vertically to the same level as the crown of
the outgoing pipe and the top edge shall be suitable rounded off. The branch channels shall
also be similarly constructed with respect to the benching out at their junction with the main
channel as appropriate fall suitable rounded off in the direction of flow in the main channel
shall be given. The channel at the bottom of manhole / inspection chamber shall be
plastered with C.M. (1:3) and finished smooth. Rungs shall be provided in all
manholes/inspection chambers over 0.6 mtr in depth and shall be of cast iron conforming to
IS:5455. These rungs shall be fixed staggered in two vertical runs, 300 mm apart horizontally
and 300 mm c/c vertically. The top rung shall be 450 mm below the manhole/ inspection
chamber cover and the lowest not more than 300 mm above the benching. The
manhole/inspection chamber frame and cover shall be of cast iron of specified weight and
Signature of Bidder Page 56 of
Ahmedabad Municipal Corporation
shall conform to the requirements given in IS:1726. The covers and frames shall be cleanly cast
and they shall be free from air and sand holes and from clod shuts. They shall be neatly
dressed and carefully trimmed. All castings shall be free from voids whether due to shrinkage,
gas inclusion or other causes.Covers shall have a raised chequered design on the top surface to
provide an adequered nonslip grip. Cover shall be capable of easy opening and closing and it
shall be fitted in the frame in workmanship like manner. The cover shall be gastight and water
tight. The size of covers specified shall be considered as the clear internal dimensions of
the frame. Covers and frames shall be coated with a black bituminous composition. The
coating shall be smooth and tenaceous. The frame of manhole/inspection chamber cover shall
be firmly embeded to correct alignment and level in cement concrete on the top of the
masonry. The item shall be executed as per the detailed drawing and as directed by Engineer.
Precast R.C.C. cover of required size and thickness shall be provided if specified in the item of
FRC SEAT COVER:
The frame shall be fixed in cement concrete of M15 grade all around and finished with neat
cement. The cover shall have a minimum thickness of 100 mm and weighing 78 kg. The fibers
shall constitute 1% of the weight of the concrete in the form of 50 mm to 100 mm long high
tensile steel wires. For the cover, MS sheet lapping of 3 gauge shall be provided to avoid
damage to the edges. Similarly for frame, MS angle/flat shall be provided along the edge.
Both MS sheet and angle shall be painted with black bituminous paint. The cover should have
suitable lifting arrangement. The fiber reinforced frame and cover shall be manufactured as
per the drawing approved by Owner/Engineer. The size, type, weight, and locking
arrangement for frame and cover shall be as specified
RCC Work :- In general, plain and reinforced concrete work for manholes shall be carried out
in accordance with latest version of IS 456 unless otherwise specified in this specification.
The slab of manhole shall be cast with shutters lined with plywood and shall be smooth
finished. For avoiding surface cracks due to variation in atmospheric temperature and
exposure to direct sunlight, RCC slab of manholes after casting shall be kept wet. M 20 grade
of concrete used for construction of RCC manholes shall have minimum cement content of
360 kg/cum of concrete. Bar bending schedule for reinforcement shall be prepared by
contractor and got approved from owner/ engineer before proceeding with the work.
Minimum cover to the reinforcement shall be 40 mm.
The rate includes cost of all labour, materials, tools and plant etc. required for satisfactory
completion of this item as described above. The rate shall be for a unit of one number basis.
Item No : 42 Dismantling of existing Arch type manhole up to Arch and then Const. Slab type manhole of
following size incl. excavation, refilling and & finished 15 mm thick cement plaster inside in CM 1:3,
P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered in masonry CM 1:5, incl.
cost of RCC Slab in CC 1:1.5:3, including Cantering & reinforcement as directed by engineer in
charge. Rate includes carting of debris and excavated soil
1.0 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement (Single jalli at 15 C.M.
c/c bothway 10 mm dia.) From 0 to 2 mt depth (Slab at Ground level)
Signature of Bidder Page 57 of
Ahmedabad Municipal Corporation
1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement (Single jalli at 15 C.M. c/c
bothway 10 mm dia.) From 2 to 3 mt depth (Slab at below 1.00 mt. From G.L.)
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM & reinforcement (double jalli at 15 C.M.
c/c bothway 10 mm dia.) From 0 to 2 mt depth (Slab at Ground level)
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM& reinforcement (double jalli at 15 C.M. c/c
bothway 10 mm dia.) From 2 to 3 mt depth (Slab at below 1.00 mt. From G.L.)
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM & reinforcement (double jalli at 15 C.M.
c/c bothway 10 mm dia.) From 3 to 4 mt depth (Slab at below 1.00 mt. From G.L.)
The manholes shall be Dismantling of existing Arch type manhole up to Arch and then Const. Slab type
manhole as per plan and section approved by the Addl. C.E. The specifications for different items of
manholes are as under :
Excavation: This shall be done as per specification mentioned in item No.1 Excavation.
Brickbats cement concrete in proportion (1:5:10) For detailed specification refer R & B Dept. booklet
for General Technical Specification for building works , Page no. 31 , Section.No. 5.3.8(a)
Brickwork(1:5):
For detailed specification refer R & B Dept. booklet for General Technical Specification for building
works ,Page no. 43 , Section. No. 6.12(B).
C.C. Channels :
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement 2 parts
of sand and 4 parts of aggregates of black trap metal of approved materials of sizes from 0.6 to
cm. well graded as per instructions.
The rate includes all necessary materials mixing, laying and ramming and watering. The exposed faces
to be finished with neat cement as per instructions. The channel shall be half round in lies with the dia
of pipe as per drawing and instruction of the engineer in charge. Proper benching shall be provided at
both sides of the channel.
Cement Plaster(1:3) :
For detailed specification refer R & B Dept. booklet for General Technical Specification for building
works , Page no. 104 , Section. No. 17.58(I) Except that the thickness of the plaster shall be 15 mm
instead of 10 mm.
4 mm dia M.S Steel HDPE coated steps 35 cm c/c at 35 cm staggered
For detailed specification refer R & B Dept. booklet for General Technical Specification for building
works , Page no. 159 , Section. No. 24.13 and fixation or any change at the site according to the
direction of Engineer-in-charge in charge
Carting of Surplus Earth :
The surplus earth which is left an site after refilling and proper watering of the trenches shall have to
be carted away upto a distance within 30 mts. & shall be spread at the site according to the direction
of Engineer-in-charge in charge.
RCC Work :- In general, plain and reinforced concrete work for manholes shall be carried out in
accordance with latest version of IS 456 unless otherwise specified in this specification. The slab of
manhole shall be cast with shutters lined with plywood and shall be smooth finished. For avoiding
surface cracks due to variation in atmospheric temperature and exposure to direct sunlight, RCC slab
of manholes after casting shall be kept wet. M 20 grade of concrete used for construction of RCC
manholes shall have minimum cement content of 360 kg/cum of concrete. Bar bending schedule for
Signature of Bidder Page 58 of
Ahmedabad Municipal Corporation
reinforcement shall be prepared by contractor and got approved from owner/ engineer before
proceeding with the work. Minimum cover to the reinforcement shall be 40 mm.
The rate includes cost of all labour, materials, tools and plant and size etc. required for satisfactory
completion of this item as described above.& the drawing as per A.M.C Dr. S.O.R shall be final.
The rate shall be for a unit of one number basis.
Seal and Signature of the Bidder Addl. City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 59 of
Ahmedabad Municipal Corporation
yb>tJt> BGþrlrmrvj ftuvtuohuNl
bægÍtul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau Bþsc Au.
"yt ftblt >huf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE ytExbltu
CtJ J^thtu ytvJtbtk ytJNu lrn. yuf s ftuLx[tfxhu yuf søgtyu <btb ftbdehe vtKe, z[ulus, vuJ´d,
heEMxuxbuLx rJ. <btb ftbdehe fhJtle Au. yBþf JF<u btºt vtKelt Ôgrf<d< flufNltu s c>jJtlt
«mkdtu WCt &Nu ylu yBþf JF< btºt bulntuj/ auBchlu Vh<u fta ltkFuÕþk ÃjtMxh fhJtLþk &tg <uÔþk vK
clNu. yBþf søgtyu swlt vÚ&h s VheJth heEMxux fhJtlt &Nu fu btºt ytMVtÕx htuz d{tWxed - heEMxux
fhJtltu &Nu. <uJe >huf ytExbbtk J^^x &tg fu ytExb yufÍefGþx l &tg <uÔþk vK clNu. ytlt btxu
ftuEvK «fthle J¤<hle btkdKe fhJtle hnuNu lrn fu CtJ J^thtu, vK ytvJtltu &Nu lrn. <ult btxu
Ãþh<tk mt^ltu ylu bsqhtu ntug, yuf mt&u yluf søgtytuyu ftb fhJtle ûtb<t ntug <ubKu s rJathelu xuLzh
ChÔþk. bsqhtu l&e fu dtbzu s<t hÌtt Au fu ntu¤e, lJhtºte, r>Jt¤e, jøl meÍl fu yLg <nuJthtubkt fu
«mkdtubtk bsqhtu ytJ<t l&e <uJt fu ceò ftuEvK cntlt nuX¤ ftb ck^ htFe NftNu lrn yLg&t htuslt
Yt. 250.00le J^thtle vulÕxe ftb ck^ hnu fu MËalt fh<t ytuAt bsqhtu ytJu <ulu je^u fhJtbtk ytJNu."
Seal and Signature of the Bidder AdditionalCity Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 60 of
Ahmedabad Municipal Corporation
(A) Penalty For Maintenance and SLA Purpose: Penalties will be applied for work done after the SLA period
based on the following schedule:
Department Category Problem SLA 10% 20% 30% Penalty
Penalty Penalty (Hours)
(Hours) (Hours)
Engineering Water Water-low pressure 240 Hours 240 480
Engineering Water Water-No Supply 240 Hours 240 480
Engineering Water Water-Other 72 Hours 72 144
Engineering Water Water-Leakage In Main 48 Hours 48 96
Engineering Water Water-Pollution In Supply 240 Hours 24 48
Engineering Drainage Drainage- Manhole Cover 24 Hours 24 48
Engineering Drainage Drainage-Other 48 Hours 48 96
Engineering Drainage Drainage- Choking Of Line 48 Hours 48 96
Engineering Drainage Drainage-Public 72 Hours 72 144
Toilets/Urinals Blockage
Engineering Road Road-Other 48 Hours 48 96
Engineering Road Road-Bhuva On Road 48 Hours 48 96
Engineering Road Road-Repair Require 72 Hours 72 144
Engineering Storm Road-Waterlogged Due To 24 Hours 24 48
Engineering Storm Road-Catch Pit Repairing 96 Hours 96 192
Engineering Public Public Building-Repairing 360 Hours 360 720
Building of Doors, Windows, Tiles
Engineering Footpath Road-Footpath Repairing 168 Hours 168 336
Engineering Building Building-Municipal Schools 168 Hours 168 336
Note: If work is not completed after the penalty time limit, a penalty equal to the full amount of the work will
(B) Penalty 10% for New Allocated Works.
Signature of Bidder Page 61 of
Ahmedabad Municipal Corporation
Signature of Bidder Page 62 of
Ahmedabad Municipal Corporation
AHMEDABAD MUNCIPAL CORPORATION
Central Zone - Engineering Dept.
ftblwk ltb:- bægÍtul ltkk sbtjvwh Jtuzo htgFz rJM<thbtkk FtYltk lt¤t , mtuœtdh le vtu¤,ftuXe bntuÕjt <&t yLg søgtyu vtKele jtRl ltkk jefuSm <ubs
sYhegt< bwsc le vtKele lJe jtRl ltFJtltkk ftb
Sr. No. Description Of Item Qty. Unit Net Rate Amount
1 Providing FoR Cost of Materials & supplying at Materials
A Providing TMT Bar FE 500D reinforcement for R.C.C. work 45 K.G 75.46
including bending, binding and placing in Position
complete upto floor two level (R & B Ah city SOR 23-24
Item no. 5.4.11 I.code 05014C) page No.54
B P/F dead shuttering for slab, beam etc.(Based on Drainage 20 SMT 312.50
SOR 2015-16 Item No.27)page No.5
C Lead (AMC central Stroe i.code 18910001 rate as on 120 K.G 214.74
D Jute (Spun Yarn) (AMC central Store i.code 18940001 rate 50 K.G 76.10
as on dated 21.02.2023)
E Bolts and washer for valves (GWSSB SOR 22-23 SECTION 4 K.G 63.00
F MS Plate (as per building SOR) 3 K.G 63.35
G MS pipe /piece 3 K.G 75.00
H MS Ring flange 3 K.G 125.00
I MS Blank flange 3 K.G 98.21
J Rubber Gasket 3 K.G 71.43
2 Providing & supplying For Welding Joints
A Hiring and operating the 20 KV 3 Phase Electric 1 SHIFT 2500.00
Generator for operating desilting machinery and lighting
and other requirements with Arranging diesel to run the
D.G. Set Do As Directed. 8 Hrs Shift.
B Rent of Welding machine per shift 1 SHIFT 893.00
C Rent for Grinder machine per shift 1 SHIFT 304.00
D Gas Cutting set per shift 1 SHIFT 513.00
E LPG bottle 1 NO 1205.00
F Oxygen bottle 1 NO 246.00
G Rent of Tools & Other Charges 1 SHIFT 446.00
H Rent of Chain pulley block & Tripod 1 SHIFT 446.00
3 Providing For Masonry & RCC Work 1
C M-Seal 100 gm pack 1 NO 26.79
D Cement bag (As per building SOR I.code M143) 1 BAG 323.00
Signature of Bidder Page 63 of
Ahmedabad Municipal Corporation
E Supplying grit size of 6.3 to 10 mm size at all road store of 1 CMT 803.67
khadiya ward incl. loading unloading grit shall consists of
crushed or broken stone and be hard strong dense,
durable clean form dust of proper gradation and free
from skin on coating likely to preven proper adhension of
mortar R & B Ah.City S.O.R.23-24 mat.Sr.158 page 13 +
Statement 5 Col.5 + ABOVE 50Km.
F Kapachi Aggregates (R & B Ah.City S.O.R.23-24 mat.Sr.178 5 CMT 958.99
G Supplying good quality River sand free from foreign 2 CMT 588.50
materials, impurities etc comp as dire at different store of
khadiya ward with loading and unloading etc comp R & B
Ah.City S.O.R.23-24 mat.Sr.191 page 13 + Statement
Col.5 + ABOVE 50Km & UP TO 100Km
H Supply bricks shall be hand or machine moulded and 1 NO 5.38
made from suitable soils and klin-burnt.They shall be free
from crack and nodules of free lime the size of brick
approved and conventional bricks with rectangle shap
with sharp corners with a frog at diff store with loading
and unloading etc comp
3 Providing and laying controlled cement concrete M.200 1 Cmt 3977.88
and curing complete excluding the cost of formwork and
reinforcement for reinforced concrete work in
(A)Foundations, footings, Base of columns and Mass
concrete (R & B Ah city SOR 23-24 I.No.5.8.2 I.Code
4 Labour charges for repairing of lekage CI/DI pipe line of
following diameter at different places incluyding
necessary excavation manually or by machinery,
removing of mud, dewatering, cleaning of pipe, cutting
of pipe, Jointing & repairing using CID joints including
CID joints, rubber rings, nut bolts, hiring excavator,
Hydra/ Crane, dewatering machine, fuel, operator
etc complete ( including cost of jointing material but
excluding cost of pipe) (GWSSB SOR 22-23 SECTION 1 G
Signature of Bidder Page 64 of
Ahmedabad Municipal Corporation
5 Labour charges for repairing of lekage CI/Di pipe
line for following dia different places including
necessary excavation manually or by machinery removing
mud dewatering cleaning of pipe and leakafe portion and
repairing by inserting lead wool jute tools required for
inserting lead wool hiring charges of excavators
Hydra/crane j.c.b dewatering set fuel operator cost of
lead wool etc complete(including all material but
excluding cost of pipel) (GWSSB SOR 22-23 SECTION 1 G
6 Providing, supplying and fixing check nut for sluice valve.
C.I./M.S./G.M. or Brass. Instruction of engg. In charge.
7 Labour charges for repiaing of Sluice valve / Reflux
valve inlcuding materials, labours and testing etc.
Complete. (i) Replacing of S.S. Spindle only (GWSSB
SOR 22-23 I.no.12.A.3)
Signature of Bidder Page 65 of
Ahmedabad Municipal Corporation
8 Providing and fixing to wall, ceiling and floor
galvanised Mild steel tubes (Medium grade) of the
following nominal bore, tube fitting and clamps
including making good the wall ceiling and floor. (R & B Ah
city SOR 23-24 Page No.162)
a 40 mm dia (I.code no. 23001EA Item No.23.2) 1 RMT 596.73
b 25 mm dia (I.code no.23001CA Item No.23.2) 0 RMT 393.93
c 20 mm dia (I.code no. 23001BA Item No.23.2) 0 RMT 297.25
d 15 mm dia (I.code 23001AA Item No.23.2) 0 RMT 244.13
e 50 mm dia (I.code no. 23001FA Item No.23.2) 0 RMT 779.60
9 Providing, laying and jointing in true line and level U.P.V.C
pipe (SCH - 40) of following dia. including fittings of
standard make as approved by Engineer - in - charge. Pipe
shall be fixed on the wall with the help of clamp at
every shall be concealed as directed including
necessary Tee ,bend, any joint & any fittings etc.
including testing of pipe and joints and fixing the same
with adhesive solvent, including cost of all materials
(R & B Ah city SOR 23-24 Page No.170)
A 15 mm (I.code no. 23061) Page No.170 15 RMT 91.93
B 25 mm (I.code no. 23062) Page No.170 5 RMT 90.93
C 32 mm (I.code no.23063) Page No.170 2 RMT 117.97
D 40 mm (I.code no. 23064) Page No.170 2 RMT 146.65
E 50 mm (I.code no. 23065) Page No.170 2 RMT 193.73
F 110mm (I.code no. 23067) Page No.170 2 RMT 826.88
G 160 mm (I.code no. 23066) Page No.170 2 RMT 822.99
10 Extra rate over item of excavation of earth for excavation
of asphalt pavement / RCC of thickness upto 0.20 meter
including demolishing the asphalt
carpet,metal,soiling/cutting Reinforcement etc.comp.
with stacking the material as directed.AMC Drainage /
SWD pipe line S.O.R.Jan/2016 Sr.4(a)
a a) upto 0.20 meter thickness (By Manual) AMC Drainage / 80 SMT 71.43
SWD pipe line S.O.R.Jan/2016 Sr.4(a)
b b) 0.20 meter to 0.30 meter (By Breaker Machine 10 SMT 178.57
including cost of operator, fuel, & transportaion etc
complete. AMC Drainage / SWD pipe line S.O.R.Jan/2016
c c) 0.30 meter & above (By Breaker Machine including cost 10 SMT 312.50
of operator, fuel, & transportaion etc complete. AMC
Drainage / SWD pipe line S.O.R.Jan/2016 Sr.4©
11 Providing and Making hole for House connection on
C.I./D.I. or M.S. with labour cost. Instruction of engg.
In charge AMC SOR - (Jan. 2016) Rates for Labour work
for water pipe line Sr.No.12 Item No.12 page
A 15mm Sr.No.12 Item No.12(a) 25 NO 312.50
B 20mm Sr.No.12 Item No.12(b) 2 NO 401.79
C 25mm Sr.No.12 Item No.12© 1 NO 535.71
E 40mm Sr.No.12 Item No.12d 1 NO 1785.71
F 2.0" dia on CI/DI Pipe up to300mm dia. Sr.No.12 Item 5 NO 2678.57
Signature of Bidder Page 66 of
Ahmedabad Municipal Corporation
12 Transporting from AMC store and laying spigot and socket
New DI pipe line DI-k-9 pipes of various classes with
CI/DI/MS specials of following diameters. Rate includes
excavation up to minimum 1.0 mt. depth from top of pipe
/ as per requirement in any soil, refilling after laying
pipe, covering and temptation of carting surplus
earth up to 30 mt. lead and watering and
compaction. Clearing the site. All Joints shall be made
tight & leak free etc. comp.AMC SOR - (Jan. 2016) Rates
for Labour work for water pipe line Sr.No.1 Item No.1
A 100 mm Sr.No.1 Item No.1(b) 100 RMT 64.29
B 150 mm Sr.No.1 Item No.1 © 100 RMT 77.68
C 200 mm Sr.No.1 Item No.1(d) 50 RMT 93.75
D 250 mm Sr.No.1 Item No.1(e) 10 RMT 113.39
E 300 mm Sr.No.1 Item No.1(f) 10 RMT 136.61
F 350 mm Sr.No.1 Item No.1(g) 10 RMT 185.71
G 400 mm Sr.No.1 Item No.1(h) 5 RMT 207.14
H 450 mm Sr.No.1 Item No.1(i) 5 RMT 272.32
I 500 mm Sr.No.1 Item No.1(j) 1 RMT 320.54
J 600 mm Sr.No.1 Item No.1(k) 1 RMT 384.82
13 Removing & relaying of existing CI/DI pipe line &
Specials, Cleaning of pipe & Specials from Inside,
including excavation, refilling etc. comp. in line & level
with any type of joints as per instruction of engg. in
charge AMC SOR - (Jan. 2016) Rates for Labour work for
water pipe line Sr.No.3 Item No.3 page
A 100 mm Sr.No.3 Item No.3(b) 150 RMT 64.29
B 150 mm Sr.No.3 Item No.3(c) 150 RMT 77.68
C 200 mm Sr.No.3 Item No.3(d) 150 RMT 93.75
D 250 mm Sr.No.3 Item No.3(e) 9 RMT 112.50
E 300 mm Sr.No.3 Item No.3(f) 10 RMT 119.64
14 Labours charges for collecting specials from Municipals 1000 K.G 21.43
store loading , transportation, unloading to the site,
laying and fixing CI specials inclusive of all jointing
materials like lead, spun etc.and labour, exacavation
re-filling and nece. dewatering as per instrucation of
engg. incharge AMC SOR - (Jan. 2016) Rates for Labour
work for water pipe line Sr.No.7 Item No.7 page
15 Labour charges for installing and jointing Sluice Valves
including loading, transporting from owner's store,
lowering in location to the required with excavation
refilling alignment by crane/ tripod and chain block
including cost of total nos. of nuts, bolts, Necessary
gaskets and excluding fixing of tail pieces with lead & jute
etc complete as directed by Engg. in charge. AMC
SOR - (Jan. 2016) Rates for Labour work for water pipe
line Sr.No.4 Item No.4 page
A 100 mm Sr.No.4 Item No.4(b) 5 NO 1410.71
B 150 mm Sr.No.4 Item No.4© 5 NO 1598.21
C 200 mm Sr.No.4 Item No.4(d) 5 NO 2125.00
Signature of Bidder Page 67 of
Ahmedabad Municipal Corporation
D 250 mm Sr.No.4 Item No.4(e) 5 NO 3000.00
E 300 mm Sr.No.4 Item No.4(f) 2 NO 3776.79
F 350 mm Sr.No.4 Item No.4(g) 1 NO 5026.79
G 400 mm Sr.No.4 Item No.4(h) 1 NO 6285.71
H 450 mm Sr.No.4 Item No.4(i) 1 NO 8348.21
I 500 mm Sr.No.4 Item No.4(j) 1 NO 9044.64
J 600 mm Sr.No.4 Item No.4(k) 1 NO 10366.07
16 Cutting of existing pipelines of following diameters
including carting of nece. specials from AMC store to site
and from site to AMC store (recovered materials) nace.
labours for excavation, jodan & backfilling fitter,
supervisor, etc. complete. Rate also includes electric
cutter, dewatering pump fuel and transportation of
machineries, chain pulley block if requires working at
an instructed specific time of day or night etc.
complete. AMC SOR - (Jan. 2016) Rates for Labour work
for water pipe line Sr.No.6 Item No.6 page
A 100 mm Sr.No.6 Item No.6 (b) 20 NO 1446.43
B 150 mm Sr.No.6 Item No.6 © 5 NO 1464.29
C 200 mm Sr.No.6 Item No.6 (d) 1 NO 2455.36
D 250 mm Sr.No.6 Item No.6 (e) 1 NO 3169.64
E 300 mm Sr.No.6 Item No.6 (f) 1 NO 5142.86
F 350 mm Sr.No.6 Item No.6 (g) 1 NO 5544.64
G 400 mm Sr.No.6 Item No.6 (h) 1 NO 6598.21
H 450 mm Sr.No.6 Item No.6 (i) 1 NO 10187.50
I 500 mm Sr.No.6 Item No.6 (j) 1 NO 11580.36
J 600 mm Sr.No.6 Item No.6 (k) 1 NO 14285.71
17 Supplying, labour for excavation of all types of soil at any
depth including excavation of asphalt pavement of any
thickness, demolition of brick work in CM of any
proportion including stacking of serviceable materials and
disposal of unserviceable material etc. comp. as directed.
A Labour charges - Mazdoor (male) R & B Ah.City S.O.R.23- 25 NO 493.00
24 I.CodeL022 Page No.39
B Fitter R & B Ah.City S.O.R.23-24 I.CodeL014 Page No.39 25 NO 640.00
C Labour charges - Supervision for Machinery R & B Ah.City 10 NO 711.00
S.O.R.23-24 I.CodeL029 Page No.39
18 Dewatering by pumping set of required capacity 10 HP/Hr. 18.32
including temporary platform carting pumping at site and
fixing the same in position including all accessories,
and fuel and labour etc. Complete (A) Pump set of
Capacity (GWSSB SOR 22-23 Section 2E-miscellaneous
19 Providing & Supplying JCB Machine on rental basis in 10 Hour 535.71
case of emergency situation and break down type
work & also during unavoidable condition as per
instruction of Engg. In Charge, rate includes all nece.
Shifting, fuel and operating charges and stacking of
useful & non-useful materials separately up to store. SOR
- (Jan. 2016) Rates for work of Drainage / SWD pipe line
Signature of Bidder Page 68 of
Ahmedabad Municipal Corporation
20 Supplying Pneumatic Breaker Machine for RCC Slab or 10 Hour 535.71
Asphalt Demolishing Work on site by using Operator, fuel,
power Supply etc. Complete as Directed. SOR - (Jan.
2016) Rates for work of Drainage / SWD pipe line
Machinery Sr.10
21 Excavation for trial pit for location of existing line 10 NO 290.00
including excavation of any depth including refilling,
watering etc. Comp (As per previous tender Rates)
22 Labour charges for doing washout of water pipe line 10 NO 669.64
at end including necessary excavation of pit, allowing the
water to flow for 15 minutes twice or thrice as per site
condition during supply hour, dewatering the pit and
plugging with existing wooden butch and refilling the pit
.etc. comp .as per instruction AMC SOR - (Jan. 2016)
Rates for Labour work for water pipe line Sr.No.15 Item
23 P/S OF good quality of rubber rings for following dia
meter. AMC SOR - (Jan. 2016) Rates for Labour work for
water pipe line Sr.No.17 Item No.17 page
A 100 mm Item No.17 (b) 10 NO 44.64
B 150mm Item No.17 © 10 NO 53.57
C 200mm Item No.17 (d) 2 NO 93.75
D 250mm Item No.17 (e) 2 NO 125.00
24 Supplying wooden taper butches from jungle wood (Like
limda, ambo) Etc. comp. AMC SOR - (Jan. 2016) Rates for
Labour work for water pipe line Sr.No.16 Item No.16 page
A 15 Mm dia. to 20 MM dia.Item No.16 (a) 250 NO 13.39
B 25 Mm dia. to 37 MM dia. Item No.16 (b) 12 NO 17.86
C 50 Mm dia. Item No.16 © 2 NO 89.29
D 80 mm dia to 100 mm dia line Item No.16 (d) 50 NO 312.50
E 150 mm dia Item No.16(e) 5 NO 446.43
F 200 mm dia Item No.16(f) 5 NO 714.29
25 Labour charges for repairing of sluice valve /
reflux valve including materials, labours and testing
etc.,complete (B)Replacing of Glan packing only (GWSSB
Signature of Bidder Page 69 of
Ahmedabad Municipal Corporation
26 Providing and laying (to level or slopes) and jointing with
stiff mixture of Cement Mortar in proportion 1:1 Salt
glazed stoneware pipes including testing of pipes and
joints complete.(R &B Ah city SOR -23-24 Item no.
24.1)page No.172
A 100 mm (I.code 24001AA) 15 RMT 211.05
B 150 mm (I.Code 24001BA) 15 RMT 288.23
27 Fixing of valve Road box incl .locating valve, nece. 15 NO 446.43
excavation, tem also inclues cartring form AMC store to
site. Etc.Comp. as directed AMC SOR - (Jan. 2016) Rates
for Labour work for water pipe line Sr.No.9 Item No.9
28 Providing, laying, spreading and compacting graded
stone aggregate to wet mix macadam
specification including premixing the Material with
water at OMC in mechanical mix plant carriage of
mixed Material by tipper to site, laying in uniform
layers in sub- base / base course on well prepared
surface and compacting with vibratory roller to
achieve the desired density as per Codal
Provision. (RA Approved St.Com.Res No.189,
A PRODUCTION & SUPPLY OF WMM 5 CMT 1975.00
B LAYING OF WMM 5 CMT 35.00
29 Hiring of Tractor with trolley considering 8 Hrs. As 1 DAY 2104.09
working Day hours inclu. Driver (GWSSB SOR -22-
23 Section 2E-Miscellenous Item no. 7)
30 Barricading the entire break down or excavated area 25 RMT 80.36
on rental basis using wooden ballies / M.S. angles at
max. 2.00 meter centre to centre, C.G.I. Sheet, reflective
paint / Board outside to avoid accident & for smooth
traffic diversion & movement including cautionary
board etc. Item also includes for making temporary
sufficient nos of lighting arrangement throughout the
work with necessary required arrangement. ..The same
shall be removed after completion of work. AMC SOR -
(Jan. 2016) Rates for Labour work for water pipe line
Sr.No.35 Item No.35 page
31 Reinstatement of Asphalt road/any kind of 15 Smt 103.57
paving/flooring using the same material. (As per previous
ARC tender rates)
32 Providing , Supplying and fixing ISI mark approved quality 15 No. 223.21
for ferrul connecting to existing CI/DI pipe line of water
tight joints per inst.of engg. in
charge (15 mm) dia AMC SOR - (Jan. 2016) Rates for
Labour work for water pipe line Sr.No.18 Item No.18 page
33 Repairing damaged M.H. and rasing M.H. up to road level
incl. removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I.
steps and existing MH sheet cover, removing the debris
from MH and carting the same as directed. SOR - (Jan.
2016) Rates for work of Drainage / SWD pipe line
(B) up to 0.35mt. (@ Four Coarse)AMC Drainage / SWD 1 No. 1160.71
pipe line S.O.R.Jan/2016 Sr.21(b)
Signature of Bidder Page 70 of
Ahmedabad Municipal Corporation
(C) up to 0.65 mt. (@ Seven Coarse)AMC Drainage / SWD 1 No. 1794.64
pipe line S.O.R.Jan/2016 Sr.21©
(D) up to 0.90 mt. (@ Ten Coarse )AMC Drainage / SWD 5 No. 2160.71
pipe line S.O.R.Jan/2016 Sr.21(d)
34 Repairing damaged I.C./ Raising removing damaged 25 No. 401.79
brick work and repairing by brick masonry in C.M.
1:5 and plaster in C.M. 1:3 and fixing C.I. steps and
existing chamber sheet cover, removing the debris
from chamber and carting the same as directed. SOR
- (Jan. 2016) Rates for work of Drainage / SWD pipe
35 Labour Work for temp Jodan of ex.line for running water 15 No. 267.86
supply incl makin collar between gap of pipe & jointing with
jute & day after removing all thi as per inst etc.comp as
dire.AMC SOR - (Jan. 2016) Rates for Labour work for
water pipe line Sr.No.14 Item No.14 page
36 Conveyance charges of lime, murrum, building, rubbish, 10 Cmt. 326.73
manure or sludge and excavated rock and fly ash J.
km R & B Ah.City S.O.R.23-24 Statement-5 I.Code
030201A1 Page No.6
37 Dismentaling tiled of stone floors laid in mortar 25 Smt. 47.25
including stacking of serviceable materilas and
disposal of unserviceable materials with all lead and
lift (P.140 I.No.2005 Building S.O.R.2023-2024)
38 Labour work for fixing any kind of paving with cement
pointing in CM 1:2, including watering, ramming etc
comp. as dir.For pavementSOR - (Jan. -2016) for Central
Verge / Footpath / Stone Paving
I) Laying on Sand bedding as per requirement to fix the 2 Smt. 69.64
C.C.Block / Nibhada Stone in Line & Level
39 Supplying and fixing Nimbhada ladi 37 to 50 mm thick for
walk-way, covering the activity of excavation, ramming,
Laying on sand bedding as per requirement to fix the
Nibhada Stone in Line & Level with cement pointing in
cement mortar 1:2 etc complete as directed.SOR - (Jan. -
2016) for Central Verge / Footpath / Stone Paving
Nimbhada ladi paving (37 to 50 mm.) 2 Smt. 236.61
40 Constructing Chamber of following size including
excavation, refilling, BBCC (1:5:10) for foundation,
C.C.Channel (1:2:4), finished 15 mm thick cement plaster
inside in CM 1:3, finishing with cement slurry, Brick
masonary in CM 1:5 & excluding the cost of chamber seat
cover etc.completed. (Based on Drainage SOR 2015-16;
a 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 5 No. 2261.61
b 0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 2 No. 2874.11
b 0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to 1.20 2 No 3905.36
meter for pipe dia <=20 mm
Signature of Bidder Page 71 of
Ahmedabad Municipal Corporation
41 Constructing Slab Type M.H. Chamber Of The Following
Size Including Excavation, Refilling, Brick Bats Cement
Concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4)
of thickness 10 C.M., finished 15 mm thick cement plaster
inside & outside (Only for shaft) In Cm 1:3, Finishing With
Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated
Steps 35 Cm C/C At 35 Cm Staggered Masonary In Cm 1:5,
Rcc Slab In Cc1:1.5:3 of thickness 15 C.M.,Including
Cantering & Reinforcement (Single jalli at 15 C.M. c/c
bothway 10 mm dia.)But Excluding The Cost Of Manhole
Seat Cover Etc..Completed Of Size 0.75 X 1.00 Meter
(Inside Clear, M.H. length should be parallel to the flow)
(Based on Drainage SOR 2015-16; Item No.12)
a 1.00 to 2.00 meter depth (Slab at Ground level) Sr. 5 No. 5651.79
No.12(a) page No.3
42 Dismantling of existing Arch type manhole up to Arch and
then Const. Slab type manhole of following size incl.
excavation, refilling and & finished 15 mm thick cement
plaster inside in CM 1:3, P/F 4 mm dia M.S.Steel HDPE
coated steps 35 cm c/c at 35 cm staggered in masonry CM
1:5, incl. cost of RCC Slab in CC 1:1.5:3, including
Cantering & reinforcement as directed by engineer in
charge. Rate includes carting of debris and excavated soil
(Based on Drainage SOR 2015-16; Item No.17)
a 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 1 No 5892.86
C.M& reinforcement (Single jalli at 15 C.M. c/c bothway
10 mm dia.) From 0 to 2 mt depth (Slab at Ground
level)Sr. No.17(a) page No.4
b 1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 1 No 8883.93
C.M& reinforcement (Single jalli at 15 C.M. c/c bothway
10 mm dia.) From 2 to 3 mt depth (Slab at below
mt. From G.L.)Sr. No.17(b) page No.4
c 1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM 1 No 8080.36
& reinforcement (double jalli at 15 C.M. c/c bothway
mm dia.) From 0 to 2 mt depth (Slab at Ground level)Sr.
No.17(c) page No.4
d 1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM 0 No 17008.93
& reinforcement (double jalli at 15 C.M. c/c bothway
mm dia.) From 2 to 3 mt depth (Slab at below 1.00 mt.
From G.L.)Sr. No.17(d) page No.4
e 1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM 0 No 24776.79
& reinforcement (double jalli at 15 C.M. c/c bothway
mm dia.) From 3 to 4 mt depth (Slab at below 1.00 mt.
From G.L.)Sr. No.17(e) page No.4
Seal and Signature of the Bidder Addl. City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 72 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER NO.59.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .