Tender Value
₹54 L
EMD Value
₹1.1 L
Closing Date
14 Dec 2026, 4:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER
OFFICE OF EE CD-3 UPAVP GHAZIABAD
CONSTRUCTION OF PUMP HOUSE AND LAYING OF RISING MAIN FROM TUBWELL (T.W.-3) TO O.H.T. IN AJANTAPURAM YOJNA GHAZIABAD
2026_UPHDB_1211638_1
4418/ENG-4B/169 DATED 20.11.2026
Open Tender
Civil Works
Percentage
365 days
AJANTAPURAM GHAZIABAD
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
EE CD-03 UPAVP
₹1.1 L
24 Nov 2026
24 Nov 2026
14 Dec 2026
24 Nov 2026
14 Dec 2026
24 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | 642.48 | Cum | 198.47 | ₹1,27,513.01 |
| 2 | Providing and laying Cement concrete 1:4:8 (1 cement : 4coarse sand : 8 graded stone ballast 40 mm nominal size) including supply of all materials.labour and T&P etc. required for proper completion of the work and curing complete. also including cost of formwork in foundation | 22.52 | Cum | 5,193.99 | ₹1,16,968.65 |
| 3 | Brick work with first class brick (non modular) bricks of class designation 15 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) | 38.48 | Cum | 6,998.67 | ₹2,69,308.82 |
| 4 | Excavating, supplying, stacking and filling of local earth (including royalty)
by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift | 49.04 | Cum | 534.11 | ₹26,192.75 |
| 5 | Provoding and injecting chemical for pre constructional anti termite treatment and creatinf and chemical barrier under and around the column pit, wall trenches, basemenent, excavation, top surface in plinth filling junction of wall and floor, along the external per meter of binding expansion joints surrounding of pipes and conduits etc. Complete( plinth area of thr building and ground floor only shall be measured as per I.S. 6313(part ii 1981) aldrine emulsifiable concentrate or any other approved material such as heptachlor of chlordance will be used the rate of application of chemical emulsion shall be as follows, (1) Treatment of masonary and foundation 5ltr/sqm (2) Back fill in immeadiate contact with foundation 7.5 ltr/sqm (3) Treatment of surface of plinth filling 5 ltr/sqm (4) Treatment of soik along external perimeter of building 2.25 ltr/linear mtr of the perimeter wall (5) Treatment of soil under external perimeter 5 ltr/sqm | 95.17 | Sqm | 270 | ₹25,695.9 |
| 6 | 12 mm cement plaster of mix (1 cement: 4 coarse sand) | 48.78 | Sqm | 272.47 | ₹13,291.09 |
| 7 | Brick work with first class brick (non modular) bricks of class designation M-15 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) | 64.38 | Cum | 8,321.79 | ₹5,35,756.84 |
| 8 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.:
Note: Extra cement up to 10% of the minimum specified cement contentn in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth level,Concrete of M25 grade with minimum cement content of 330 kg /cum | 45.77 | Cum | 7,247.15 | ₹3,31,702.06 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.62 | Cum | 6,007.17 | ₹3,724.45 |
| 10 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as requiredIn gratings, frames, guard bar, ladder, railings, brackets, gates and similar works for hold fast of door frame, flat 35x5mm,tie rods 10mm dia. | 726.45 | Kg. | 131.6 | ₹95,600.82 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
Financial_Bid.pdf
Tender Documents • 9.11 MB
BOQ_2303270.xls
BOQ • 0.41 MB
Technical_Bid.pdf
Tender Documents • 9.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .