| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 CrAccepted-AOC | ₹5.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹6.0 Cr+₹27.5 L (4.83%)Rejected-Finance F 8 35 RAMPUR GARDEN BAREILLY UTTAR PRADESH 243005 | BAREILLY | BAREILLY | UTTAR PRADESH | 243005 | ₹6.0 Cr+₹27.5 L (4.83%) | L2 | Rejected-Finance BEINGH HEIGHER RATE |
| 3 | L3₹6.1 Cr+₹45.3 L (7.96%)Rejected-Finance 67 AASANI BAS PALANA PALANA BIKANER BIKANER RAJASTHAN 334402 UDYAM RJ 08 0063520 | BIKANER | RAJASTHAN | 334402 | ₹6.1 Cr+₹45.3 L (7.96%) | L3 | Rejected-Finance BEINGH HEIGHER RATE |
| 4 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE PRAHRI SHEET |
Tender Value
₹6.7 Cr
EMD Value
₹15.3 L
Closing Date
2 Dec 2023, 12:00 pmClosed
SE BAREILLY CIR PWD BAREILLY
OFFICE OF SE BAREILLY CIR PWD BAREILLY
Utility Shifting work of BHAMORA SHAHBAD BILARI Road (S.H.125) in Distt Bareilly Fin. Year 2023-2024
2023_CEBLY_850565_2
8395/453C(E-Tender)-3/2023-24 DATE 20.09.2023
Open Tender
Electrical Works
Item Rate
90 days
BAREILLY
Please refer SBD
3 documents required · 3 mandatory
₹2,725
₹15.3 L
BAREILLY
16 Feb 2024
18 Nov 2023
2 Dec 2023
18 Nov 2023
2 Dec 2023
18 Nov 2023
20 Nov 2023
Amount
PROVIDING FIXING 11 Kv XPLE Cable 3*185 SQ MM INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20 An-18 For 11 kv UG Line
Cost Of cable Hosting For 11 kv , UG Line INCLUDING ALL LABOUR ETC( As per Cost Data Book 2019-20 An-1
Cost Of GI pipe 6 mm dia Under ground Road Crossing For 11 kv UG Line INCLUDING ALL LABOUR ETC
Cost Of pole Mounted S/S on 11 Kv 11 mtr STP Pole For 11 kv UG Line INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20 An-1
Cost Of pole Materials for DP Structure with 11 Mtr Long STP pole For 11 Kv Under ground Line INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20 An-16
Cost Of pole Materials for DP Structure with 9 Mtr Long STP pole For 33 Kv Under ground Line INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20 An-20
T-off Complete For 11 kv UG Line INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20 An-05
PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC ABC cable 3*95 SQ MM ( As Per Stock Issue Rate 20-21) For LT Line
PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC ABC 3*50+1*35+1*16 SQ MM ( As Per Stock Issue Rate SN-16)
PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC ABC cable 3*120 SQ MM ( As Per Stock Issue Rate 20-21) For LT Line
PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC PCC POLE 8.5 MTR LONG for AB cable( As per Cost Data Book )
PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC PCC POLE 9.0 MTR LONG for AB cable( As per Cost Data Book An-02)
PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC 3 PHASE Distribution /Box with 2 clamps ( As Per Stock Issue Rate SN-114)
PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC LT INSULATOR ( As per Cost Data Book An-15 SN-5)
PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC LT CLAMPS FOR IT INSULATOR ( As per Cost Data Book An-15 SN-3)
PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC CONCRETING OF STAY SET ( As Per Cost Data Book An-16 SN-18)
PROVIDING FIXING Piercing Connector
PROVIDING FIXING LT Lug 1*120 SQ MM
PROVIDING FIXING LT Lug 1*70 SQ MM
PROVIDING FIXING LT Lug- 1*400 SQ MM
Cost Of GI pipe 6 mm dia Under ground Road Crossing For 33 kv UG Line INCLUDING ALL LABOUR ETC
PROVIDING FIXING 33 Kv XPLE Cable 3*300 SQ MM INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20 For 33 kv UG Line D.Ckt( As Per Cost Data Book An-24 )
Cost Of pole Materials for DP Structure with STP pole For 33 Kv Under ground Line INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20 An-07
Cost Of cable Hosting For 33 kv , UG Line INCLUDING ALL LABOUR ETC( As per Cost Data Book 2019-20 An-07
PROVIDING FIXING 11 Kv Line on PCC Pole Line Per Mtr 11 Kv Over Haed Line ALL LABOUR Etc Complete.
T-off Complete For 11 kv Over Haed Line INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20 An-05
Cost Of pole Materials for DP Structure with STP Pole For 11 Kv Over Haed Line INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20
Cost Of pole Materials for DP Structure with PCC Pole For 11 Kv Over Haed Line INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20
PROVIDING FIXING / ERECTION INCLUDING ALL LABOUR ETC ACSR WESEL CONDUCTOR ( As Per Cost Data Book An-17 SN-10)
Cost Of DP For 25 Kva/63 Kva/100 Kva T/F INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20
Cost Of DP For 250 Kva T/F With Plinth and Fancing INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20
Cost Of DP For 400 Kva T/F With Plinth and Fancing INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20
High Pressure Testing of 11 Kv XPLE Cable INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20
High Pressure Testing of 33 Kv XPLE Cable INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20
Laying of 11 Kv XPLE Cable Drill Method INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20
Laying of 33 Kv XPLE Cable Drill Method INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20
Cost Of TRI Pole INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20
PROVIDING FIXING LT XPLE Cable 3.5*400 SQ MM INCLUDING ALL LABOUR ETC ( As Per Stock Issue Rate2022-23 )UG 11 kva Line
Cost Of pole Mounted S/S on 11 Kv 8.50 mtr PCC Pole For 11 kv UG Line INCLUDING ALL LABOUR ETC ( As per Cost Data Book 2019-20 An-16
PROVIDING Fixing Of Cable Box 3.*185 SQ MM INCLUDING ALL LABOUR ETC ( As Per Stock Issue Rate2022-23 )UG 11 kva XPLE Cable Line
mishrilal associates pvt.ltd
S. S. Construction Co.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .