Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹3.9 LAdmitted-Finance | H1 | Admitted-Finance | |
| 2 | Rejected-Technical | - | Rejected-Technical not ok |
| Sl No | Description | Qty | Unit | IMTB Engineers Pvt Ltd H1 |
|---|---|---|---|---|
| 1.00Supply, Installation and Commssioning of Modem, Charger, Antena along with Online data Uploading to HWRA Server as per HWRA Guidelines of existing Piezometer and 02 nos. Tubewell flowmeters. | ||||
| 1.01 | Supply, Installation and Commssioning of Modem, Charger, Antena along with Online data Uploading to HWRA Server as per HWRA Guidelines of existing Piezometer for the duration of 01 year and onsite maintenance and trouble shooting as and when required. | 1 | Each | 1,20,000 ₹1,20,000 Lowest |
| 1.02 | Supply, Installation and Commssioning of Modem, Charger, Antena along with Online data Uploading to HWRA Server as per HWRA Guidelines of existing 02 nos. Electromagnetic Flowmeter installed at tubewell 1 & 2 for a duration of 01 year and onsite maintenance and trouble shooting as and when required. | 1 | Each | 2,40,000 ₹2,40,000 Lowest |
| 1.03 | FIT card for conversion of 4-20 mA to Rs-485 output | 1 | Each | 30,000 ₹30,000 Lowest |
Tender Value
Refer Docs
Closing Date
22 Nov 2025, 3:00 pmClosed
MD
The Shahabad Coop sugar mill Shahabad Markanda
Supply of Installation And Comm Of Modem Charger
2025_HBC_483728_1
Supply of Installation And Comm Of Modem Charger
Open Tender
Miscellaneous Services
Supply
The Shahabad Coop sugar mill Shahabad Markanda
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Yes
Exempted
3 Dec 2025
17 Nov 2025
22 Nov 2025
17 Nov 2025
22 Nov 2025
17 Nov 2025
17 Nov 2025 - 22 Nov 2025
Supply, Installation and Commssioning of Modem, Charger, Antena along with Online data Uploading to HWRA Server as per HWRA Guidelines of existing Piezometer and 02 nos. Tubewell flowmeters.
Supply, Installation and Commssioning of Modem, Charger, Antena along with Online data Uploading to HWRA Server as per HWRA Guidelines of existing Piezometer for the duration of 01 year and onsite maintenance and trouble shooting as and when required.
Supply, Installation and Commssioning of Modem, Charger, Antena along with Online data Uploading to HWRA Server as per HWRA Guidelines of existing 02 nos. Electromagnetic Flowmeter installed at tubewell 1 & 2 for a duration of 01 year and onsite maintenance and trouble shooting as and when required.
FIT card for conversion of 4-20 mA to Rs-485 output
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_561739.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .