Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹3.8 Cr+₹32.4 L (9.30%)Rejected-Finance | L2 | Rejected-Finance NOT L1 | |
| 3 | L3₹3.8 Cr+₹36.5 L (10.5%)Rejected-Finance | L3 | Rejected-Finance NOT L1 | |
| 4 | Rejected-Technical | - | Rejected-Technical Insufficent Bid Capacity. |
Tender Value
₹3.8 Cr
EMD Value
₹7.5 L
Closing Date
13 Jan 2026, 10:00 amClosed
Assistant Chief Engineer
Araksha Bhawan 3rd Floor Block DJ Sector II Salt Lake City
Construction of six Storied (G Plus 5) Model Urban Police Station with female barrack at Baguiati P.S. under Bidhannagar Police Commissionerate - Balance Work. (1st Call)
2025_WBSPH_974493_1
WBPHIDCL/ACE/NIT- 136(e)/2025-2026
Open Tender
CIVIL AND ELECTRICAL WORKS
Percentage
180 days
Refer to NIT
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹7.5 L
Yes
7 Apr 2026
17 Dec 2025
15 Jan 2026
17 Dec 2025
13 Jan 2026
26 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS
Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 231.01 | Sqm. | 11.92 | ₹2,753.64 |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not execeeding 1,500 mm | 414.12 | Cum | 142.15 | ₹58,867.44 |
| 3 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation | 94.08 | cum | 92.41 | ₹8,694.03 |
| 4 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consoliding the same by through saturation with water ramming complete including the cost of supply of sand (payment to be made on measurment of finished quantity). | 25.09 | Cum | 1,115.78 | ₹27,992.69 |
| 5 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 231.75 | Sqm. | 430.24 | ₹99,708.12 |
| 6 | (I)Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor.A) [Pakur Variety].(a) 1:3:6 proportion | 26.08 | cum | 6,407.12 | ₹1,67,078.47 |
| 7 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works
9 to 12 mm thick approved quality plyboard shuttering in any concrete work-
Ground floor | 184 | Sqm. | 439.77 | ₹80,917.68 |
| 8 | Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m. | 81.75 | Sqm. | 40.52 | ₹3,312.51 |
| 9 | Brick work with 1st class bricks in cement mortar (1:6). (a) In foundation and plinth. | 49.42 | cum | 6,123.19 | ₹3,02,614.17 |
| 10 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | 328.68 | Sqm | 877.16 | ₹2,88,305.83 |
stage.html
html • 0.04 MB
technical_2372407.pdf
techsummary_2372407.pdf
finance_2372407.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.18 MB
Tendernotice_2.pdf
PDF • 0.20 MB
Tendernotice_3.pdf
PDF • 0.41 MB
Tendernotice_4.pdf
PDF • 2.42 MB
Tendernotice_4.pdf
Tender Document • 2.42 MB
Tendernotice_1.pdf
Tender Document • 1.18 MB
Tendernotice_3.pdf
Tender Document • 0.41 MB
Tendernotice_2.pdf
Tender Document • 0.20 MB
BOQ_2372407.xls
BOQ • 0.58 MB
BOQ_2372407.xls
BOQ • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .