Tender Value
₹12.1 L
EMD Value
₹12,100
Closing Date
20 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Anand Irrigation Division Anand.
Restoration of HR Structure of Anand Distributary Ex.Borsad Branch.
282623
17 of 2025-26
Open
Miscellaneous Works
Anand
6 documents required · 5 mandatory · 1 optional
₹900
Yes
Executive Engineer Anand Irrigation Division Anand
₹12,100
Yes
6 Mar 2026
6 Mar 2026
6 Mar 2026
20 Mar 2026
6 Mar 2026
Bill of Quantities
Restoration of HR Structure of Anand Distributary Ex.Borsad Branch.
Item No. Description Qty Rate In figure unit Amount in Rs.
Dismantling the existing brick masonry Rs. Seven
including sorting out and stacking the useful Hundred
1 material and removing the debries and making 53.60 750.90 Fifty & Cum
good the damages etc. complete as directed. In Ninety Paise
Dismantalling the C.C. lining including Rs. Eighty
2 including disposing off the dismentalled 209.40 86.50 Six & Fifty Sqmt
materials as directed etc. complete.-7.50 cm thick Paise Only
Dismantling the existing R.C.C. Pipes including Rs. One
sorting out and stacking of the useful materials
3 of the following diameters including refilling the 20.00 1270.70 Meter
trenches etc. complete as directed. NP_2 pipes (d) Seventy Paise
1000 mm. to 1200 mm. Only
Excavation for foundation in all sorts of soil
including yellow sandy gravelly soils ,soft & hard
murrum etc. in dry condition including
4 depositing the excavated stuff in uniform layers 193.70 102.40 Cum
in banks or as and where directed etc. complete Paise Only
for lead upto 500 m and all lift. (BY
MACHINERY)- Excluding dewatering.
Providing & Laying in position "NOMINAL MIX"
cement concrete using cement, sand and
crushed aggregate by mass and machine mix for
C.C./R.C.C work incl. necessary formworks
centering, scaffolding, compaction by vibrator,
curing as directed with all lead & lift etc complete
Without Dewatering and excluding cost of steel
(A) For Foundation concrete / General purpose
(c) C. C. Nominal Mix, M-15 and MSA-20 mm 30.70 3935.00 Cum
(f) C. C. Nominal Mix, M-20 and MSA-20 mm 118.70 4296.00 Two Hundred Cum
Providing & Placing in position reinforcement
bars including cutting, bending, welding joints
where necessary, hooking etc. complete as per
drawing for all lead and lifts.
Back filling the foundation trenches around the
structures etc with selected excavated stuff
7 113.10 36.90 & Ninety Cum
including watering, ramming, compacting etc. Paise Only
complete. (By Machinery)
Providing and fixing in position ( different
diameter ) NP2 R.C.C. pipe with collar including
filling and caulking the joints with cement
mortar 1:1 proportion, finishing to design grade
and level curing etc. complete for all leads and
NP-2 class 1200 mm dia pipe. 25.00 3091.10 Ninety One & Meter
Over hauling and oiling greasing of CR/HR gates
of branch/distributory/minor etc comp as Rs. One
directed.(d)New/ Reparing of steel gate including
9 1490.00 127.20 Twenty Seven Kg.
providing basic steel material; M.S. Shaft plate, & Twenty
angles, channels etc. incl. fabriction transporting Paise Only
to site & Erection and painting etc. complete.
Providing and fixing the iron rod for steel gates Seven
10 including providing big size thread and finishing 5.00 1740.80 Hundred Meter
as required etc comp. b- dia of bar 50 mm rod. Forty &
Providing and fixing heavy duty CI nut for steel Thousand
gates as directed etc comp b- for 50mm and
11 2.00 2795.40 Hundred No.
mm dia rod land height of nut is 160 x 160 x 120 Ninety Five &
cutting Forty Paise
Providing and fixing heavy duty thrust bearing
for following dia as directed etc comp a- for
12 2.00 800.00 Hundred No.
mm dia and 50 mm dia bar and ID/OD 65mm to Only
Providing and laying plain / reinforced cement
concrete lining of Nominal Mix, M-15, (MSA-20
mm) in bed, side slopes and curvature, Rs. Three
including mixing, transporting, placing, Hundred
13 vibrating, smooth finishing, curing, including 155.00 369.50 Sixty Nine & Sqmt
dewatering where required. Fifty Paise
(MANUALLY WITH CONVENTIONAL MIXER )
(A)7.5 cm thick lining in bed/slope - with water
Total Amount Rs.
Total Amount Rs.
Rs. Twelve Lac Nine Thousand Nine Hundred Seventy Two & Fifty Seven Paise Only
I/We am/are willing to carry out the work at……………………………. % above/ below percent (Should be written in figures and words) of the
estimated rate mentioned above. Amount of my/our tender works out as under.
Estimated amount Put to tender Estimated amount Put to tender
Deduct …………………….% Below Add ……………. % above
In Words In Words
The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for
which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC 10/2017 Cement
Consumption /16/CDate:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix
design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
Signature of contractor.
Deputy Executive Engineer Divisional Accountant
Anand Irrigation Sub Division Anand Irrigation Division
Price Adjustment
Name of Work Restoration of HR Structure of Anand Distributary Ex.Borsad Branch.
Brake up of Rate Brack Up Amount
Qty Estimated Without
Item of work but may be GST Rate Unit Amount (Rs.) Plant & Plant & Net Amount
more or less (Rs.) Labour Cement Steel Bitumen POL Machinery Labour Cement Steel Bitumen POL Machinery Other Material
Dismantling the existing brick
masonry including sorting out
and stacking the useful
debries and making good the
damages etc. complete as
directed. In Cement Mortar
Dismantalling the C.C. lining
including including disposing
as directed etc. complete.-7.50
Dismantling the existing
R.C.C. Pipes including sorting
out and stacking of the useful
materials of the following
diameters including refilling
the trenches etc. complete as
directed. NP_2 pipes (d)
Excavation for foundation in
all sorts of soil including yellow
sandy gravelly soils ,soft &
hard murrum etc. in dry
condition including depositing
layers in banks or as and
where directed etc. complete
for lead upto 500 m and all lift.
(BY MACHINERY)-
Excluding dewatering.
Providing & Laying in position
"NOMINAL MIX" cement
concrete using cement, sand
and crushed aggregate by
mass and machine mix for
C.C./R.C.C work incl.
necessary formworks
centering, scaffolding,
compaction by vibrator, curing
as directed with all lead & lift
etc complete Without
Dewatering and excluding cost
of steel reinforcement.
(A) For Foundation concrete /
General purpose
(c) C. C. Nominal Mix, M-15
(f) C. C. Nominal Mix, M-20
Providing & Placing in position
reinforcement bars including
cutting, bending, welding
joints where necessary,
hooking etc. complete as per
drawing for all lead and lifts.
Back filling the foundation
trenches around the structures
etc with selected excavated
stuff including watering,
ramming, compacting etc.
complete. (By Machinery)
Price Adjustment
Name of Work Restoration of HR Structure of Anand Distributary Ex.Borsad Branch.
Brake up of Rate Brack Up Amount
Qty Estimated Without
Item of work but may be GST Rate Unit Amount (Rs.) Plant & Plant & Net Amount
more or less (Rs.) Labour Cement Steel Bitumen POL Machinery Labour Cement Steel Bitumen POL Machinery Other Material
Providing and fixing in position
( different diameter ) NP2
R.C.C. pipe with collar
including filling and caulking
8 the joints with cement mortar
1:1 proportion, finishing to
design grade and level curing
etc. complete for all leads and
Over hauling and oiling
greasing of CR/HR gates of
branch/distributory/minor etc
comp as directed.(d)New/
Reparing of steel gate
material; M.S. Shaft plate,
angles, channels etc. incl.
fabriction transporting to site
& Erection and painting etc.
Providing and fixing the iron
rod for steel gates including
finishing as required etc comp.
b- dia of bar 50 mm rod.
Providing and fixing heavy
duty CI nut for steel gates as
directed etc comp b- for 50mm
and 63 mm dia rod land height
of nut is 160 x 160 x
Providing and fixing heavy
duty thrust bearing for
following dia as directed etc
comp a- for 38 mm dia and
mm dia bar and ID/OD 65mm
Providing and laying plain /
reinforced cement concrete
lining of Nominal Mix, M-15,
(MSA-20 mm) in bed, side
slopes and curvature,
including mixing,
transporting, placing,
vibrating, smooth finishing,
curing, including dewatering
where required.
CONVENTIONAL MIXER )
(A)7.5 cm thick lining in
bed/slope - with water curing.
Deputy Executive Engineer Executive Engineer
Anand Irrigation Sub Division Anand Irrigation Division
Cement Requirement Statement
Restoration of HR Structure of Anand Distributary Ex.Borsad Branch.
Description of Item Qty. Unit ption in
No. No. requirement
Providing & Laying in position "NOMINAL MIX" cement concrete using cement, sand and crushed
aggregate by mass and machine mix for C.C./R.C.C work incl. necessary formworks centering,
scaffolding, compaction by vibrator, curing as directed with all lead & lift etc complete Without
Dewatering and excluding cost of steel reinforcement. (A) For Foundation concrete / General
purpose(a) C. C. Nominal Mix, M-15 and MSA-40 mm
Providing & Laying in position "NOMINAL MIX" cement concrete using cement, sand and crushed
aggregate by mass and machine mix for C.C./R.C.C work incl. necessary formworks centering,
2 5(A)(f) scaffolding, compaction by vibrator, curing as directed with all lead & lift etc complete Without 118.70 m3 7.20
Dewatering and excluding cost of steel reinforcement. (A) For Foundation concrete / General
purpose(f) C. C. Nominal Mix, M-20 and MSA-20 mm
Providing and fixing in position ( different diameter ) NP2 R.C.C. pipe with collar including filling and
caulking the joints with cement mortar 1:1 proportion, finishing to design grade and level curing etc.
3 8 complete for all leads and lifts. 25.00 m3 0.20
NP-2 class 1200 mm dia pipe.
Providing and laying plain / reinforced cement concrete lining of Nominal Mix, M-15, (MSA-20 mm) in
bed, side slopes and curvature, including mixing, transporting, placing, vibrating, smooth finishing,
curing, including dewatering where required.
(MANUALLY WITH CONVENTIONAL MIXER )
(A)7.5 cm thick lining in bed/slope - with water curing.
Deputy Exectutive Engineer Exectutive Engineer
Anand Irrigation Sub Division Anand Irrigation Division
Steel Requirement Statement
Name of Work :- Restoration of HR Structure of Anand Distributary Ex.Borsad Branch.
Sr No. Item No. Description of Item Qty. Unit
Providing & Placing in position reinforcement bars including cutting, bending,
welding joints where necessary, hooking etc. complete as per drawing for all lead
1 4 and lifts. (A) TMT / CRS (FE 500 D) 1.60 MT
Total 1.6030 MT
Deputy Exectutive Engineer Exectutive Engineer
Anand Irrigation Sub Division Anand Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice-17 of 2025-26 Online -(03-03-2026).pdf
1 Front Page..pdf
2 Certificate.pdf
4.SBD Book HR.pdf
5 GTS HR AD.pdf
6 IWS HR AD 0.pdf
7. BOQ HR Anand Distry.pdf
8.Drawing.pdf
3 Notice Inviting online Tender -HR.pdf
Download all tender documents and submit your bid