Tender Value
₹67.3 L
EMD Value
₹67,270
Closing Date
8 May 2026, 5:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Capital Project Division No.2, Gandhinagar
Water Proofing Work on Terrace, China Mosaic Work on Terrace and Miscellaneous Civil Work of Block No.3,6,7 & Sub Station at New Sachivalaya, Gandhinagar.
299629
02 of 2025-26/02
Open
Civil - All
Gandhinagar
1 document required · 1 mandatory
₹2,400
Executive Engineer, Capital Project Division No.2, Gandhinagar
₹67,270
29 Apr 2026
29 Apr 2026
29 Apr 2026
8 May 2026
29 Apr 2026
MEMORANDUM SHOWING THE ITEMS OF WORKS TO BE CARRIED OUT
QUANTITI ESTIMATED RATES UNIT TOTAL AMOUNT
QUANTITI ESTIMATED RATES UNIT TOTAL AMOUNT
ES ITEMS OF WORK IN FIGURE ACCORDING TO
NO. IN WORDS Unit
ESTIMATE Rs. Ps. ESTIMATED
Item No.1 Water Proofing Work on Terrace 1. Surface Preparation Rupees One Thousand Twenty
include Remove all loose material, grease, oil, Dust etc. from the Nine and Ninety Five Paisas
Surface, all spout & pipe Penetration must be firmly grouted. Crack Only
should be filled with Epoxy Material (MYK ARMENT Epoxy) 1. Apply
coat of BASF Primer & Geofibre sheet of 40 micron on the surface
1 4,200.00 with the help of Brush. 2. After the Primer Coat dries, a Second 2 1029.95 SMT Rs.
coat of PU BASF 379 is applied at an average consumption of
waterproofing material at 0.80 lit/sqft & work also including Spout
borewell packing as per EIC or as per recommendation of company.
Item No.2 1. Surface Preparation include Remove all loose material, Rupees Nine Hundred Nineteen
grease, oil, Dust etc. from the Surface. 1. Apply 1 coat of Bitumen and Ten Paisas Only
2 240.00 Primer on the Surface with the help of Brush. 2. Apply 3 mm thick 919.10 SMT Rs.
Membrane sheet on the surface with the help of heating gun.
Item No.3 Providing and fixing Expansion joint including Rupees Three Thousand Nine
Dismentalling & Removing old expansion joint by necessary Hundred Seventy Nine and
equipment and tools. The expansion joint gap shall be filled by baker Twenty Nine Paisas Only
3 60.00 rod. The polysulphide sealent shall be applied in the gap. Expansion 3979.29 RMT Rs.
joint belt of Size 8" Width EPDM Belt upto 3mm thick shall be
applied with epoxi chemical for joint of expansion joint.
Item No.4 Dismentaling tiled of stone floors laid in mortar including Rupees Fifty and Ten Paisas
4 980.00 stacking of serviceable materilas and disposal of unserviceable 50.10 Only sqm Rs.
materials with all lead and lift.
Item No.5 Providing and laying broken chine mosaic flooring Rupees Seven Hundred Seventy
forterrace using 12 mm to 20 mm broken pieces of glazed tiles to be Nine and Sixty Nine Paisas Only
laid over cement mortar 1:3 to plain or slope and to be tempered to
5 980.00 bring mortar creme out upto surface using white cement including 779.69 sqm Rs.
rounding off junctions and extending them upto 15 cm along the
wall, clearing with water and oxalic acid etc. as directed
Item No.6 PU Grouting work: Item includes Pu nosal grouting work Rupees Seven Hundred Fifty
with PU chemical with injection grouting method in RCC lift shaft as Seven and Fifty Paisas Only
6 200.00 per given detail by EIC. Work includes PU chemical coating after 757.50 no Rs.
nozel grouting work completed. Rates are inclusive of all kind labor
and transportation charges in it.
Item No.7 Repairing, overhauling, and restoring the mechanical Rupees Seven Hundred Thirty
vertical opening rolling shutter to a fully functional and smooth Seven and Thirty Paisas Only
operating condition. The work includes dismantling the curtain,
straightening bent slats, replacing damaged slats and providing new
end-locks. It involves the replacement of worn-out high-tensile
springs, pulleys, and heavy-duty ball bearings to ensure proper
tensioning. The scope also includes realigning side guide channels,
repairing the bottom rail with locking bolts, and thorough lubrication 737.30 SMT Rs.
of all moving parts with industrial grease. The entire assembly shall
be cleaned of rust and old paint, followed by the application of one
coat of anti-corrosive primer and two coats of synthetic enamel paint
of approved shade. All work is to be comp…
Item No.8 Steel work, welded in built up sections framed work Rupees Eighty Eight and Thirty
including cutting, hoisting, fixing in position and applying a priming Seven Paisas Only
coat of red lead paint. (A)In beams and joists, channels angles Tees,
flats, with connecting plates or angle cleats as in main and cross
beams. Hip and jack rafters, purlins conneted to common rafters and
Item No.9 Providing, supplying, and fixing green-colored UV- Rupees Sixty and Sixty Paisas
stabilized construction safety net made of high-quality HDPE (High- Only
Density Polyethylene) or high-tenacity Polypropylene
monofilament/tape. The net shall have a minimum weight of
GSM (as specified) with a shade factor of 50% to 75% to ensure dust
control while maintaining airflow. The net must be capable of
withstanding harsh weather conditions and be securely fastened to 60.60 SMT Rs.
scaffolding or structural members using heavy-duty nylon ropes or
cable ties at regular intervals. The scope includes all labor, materials,
scaffolding, and safety arrangements required for installation at any
height as per the instructions of the Engineer-in-Charge.
Item No.10 Providing and laying polished Kota stone slab flooring Rupees One Thousand
over Nineteen and Thirty Nine Paisas
20mm (Average) thick base of cement mortar 1:6 (1-cement: 6-coarse Only
10 72.00 sand) or L.M. 1.1.5 (1-Lime putty:1.5 coarsesand) laid over and 1019.39 sqm Rs.
jointed with grey cement slurry mixed with pigment to match the
shade of slab including rubbing and polishing etc. complete. (A)
Item No.11 Pigeon net: Providing and fixing pigeon net on windows Rupees Five Hundred Twenty
using high-quality UV-stabilized nylon or HDPE net (mesh size Two and Sixty Seven Paisas Only
approx. 25mm), secured with nylon rope, clamps, and fasteners. Net
11 1,350.00 to be installed taut and neatly, ensuring full coverage and durability. 522.67 SMT Rs.
Rate includes all materials, labor, scaffolding, and complete
installation.as directed by Architect/Engineer-in-charge.
Item No.12 Applying two coats of putty & two coats of primer of Rupees Forty and Fifty Nine
approved brand and manufacture on new wall surface to give an even Paisas Only
12 245.00 shade including thoroughly brushing the surface free from mortar 40.59 sqm Rs.
dropping and other foreign matter and sand papered smooth
Item No.13 Wall painting (two coats) with plastic emulsion paint of Rupees Eighty Three and
approved brand and manufacture on undecorated wall surface to give Eighteen Paisas Only
13 245.00 an even shade including throughly brushing the surface free from 83.18 SMT Rs.
mortar droppings and other foreign matter and sand papered smooth
Item No.14 Providing and Fixing FRP Sheet of 3 mm thickness Rupees One Thousand Three
14 50.00 including Labour fixing charge 1338.25 Hundred Thirty Eight and SMT Rs.
Twenty Five Paisas Only
Rupees Sixty Seven Lacs Twenty Six Thousand Nine Hundred Eighty Six and Forty Three Paisas Only
I/We am/are willing to carry out the work at % above/below percent (Should be
written in figures and words) of the estimated rates mentioned above. The Amount of my/our tender work as under.
* Estimated Amount * Estimated Amount
₹ 6,726,986.43 Put to tender ₹
1 All the works shall be carried out as per Public Works Department Hand Book and other Specification of the Division or as directed.
2 All the column in the Schedule-B filled in INK and the total of the entries in the last column should be struck by the contractor under his signature.
3 Rates quoted include clearance of site ( Prior commencement of work and its close) in all respects and hold good for work under all condition,site,moisture/
4 The above quoted rates are for continuous services on 24×7 basis for the full calender month and year and inclusive of all taxes applicable.
5 The above amount derived by adopting prevailing minimum wages rate including prevailing provisions of EPF, ESIC & Bonus as per rule, GST will be paid extra
on bill amount as per prevailing GST rates as applicable at tha time of payment of bills.
6 Bidders has to put their bid considering above all this provisions and requirements of paying the wages to the persons enraged as per charges applicable the
contract period. Minimum labour wages considered for the tender are as per labour commissioner Gandhinagar letter Dt.29/03/2025 . Bidders has to pay as per
minimum labour wages to be declared in future by labour department during the contract period and further increment or decrease in the tendered rate will be
paid or deducted to bidder for future increments or decrease in minimum wages as calculated in item.
7 Bidders shall have to provide the required documents and evidence of payment made to the men enraged on the work including certified copies of EPFO & ESIC
challans while claiming each R.A. Bill.
8 I/We hereby declare that, I/We have carefully studied conditions of contract, Specifications & other than tender documents of this work and agree to execute
that same accordingly.
9 Agency shall have to upload the Scan Copy of Security Deposit of 12 Months as per Below amount quoted for Material part, Otherwise the tender of the agency
will not be opened.
10 If Agency fail to provide material as per tender, the above security deposit will be forfeited by department and punishable action shall be taken as per tender
11 The payments must be paid in the workers bank account directly. Payment of all workers must be done before 10th day of successive month. If fails, to do
same, penalty of Rs.1000/- per day.
Bidder has to quote the "service charge" From 3.85 % to 10 % on Sch B amount for qualifing Tender Approval process i.e Bidding procedure for this
manpower work. The rate quoted shall be responsive and the same shoud be inclusive of all statutory obligation such as Minimum wages, ESI, EPF
contributions, Bonus Wages for leave reserve as well as salary slip, Maintenance of record, Stationary etc., service charge all kind of taxes, the offers of those
prospective bidders which do not meet the statutory requirement are liable to be rejected.
Sign of Contractor Deputy Executive Engineer Executive Engineer
Capital Project Sub Division No. 4 Capital Project Division No.2
Gandhinagar Gandhinagar
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Eligibility Criteria.pdf
07 SBD Book (1) (1).pdf
13 Special condition (1).pdf
10 Specifications Water proofing.pdf
09 Additional Instructions.pdf
08 schedule -B Block 1.pdf
06 Notice Inviting Tender.pdf
05 E-Tendering Notice.pdf
14 GTS Building Specificatiion.pdf
Download all tender documents and submit your bid