Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.2 LAccepted-AOC | ₹4.2 L | 1 | Accepted-AOC Selected As per Panchayath Board Resolution |
| 2 | 2₹4.2 LRejected-AOC | ₹4.2 L | 2 | Rejected-AOC Selected As per Panchayath Board Resolution |
| Sl No | Description | Qty | Unit | Raveendran M L1 | RAJESH P L2 |
|---|---|---|---|---|---|
| 1.00SIDE PROTECTION | |||||
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 32 | cum | 440 ₹14,077.80 | 441.5 ₹14,125.79 |
| 1.00 | OD455813/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site
(modified data 60.7.1) | 88.48 | cum | 4,160.22 ₹3.7 L | 4,160.22 ₹3.7 L |
| 1.00 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 3.95 | cum | 9,554.21 ₹37,739.13 | 9,554.21 ₹37,739.13 |
Tender Value
₹4.2 L
EMD Value
₹10,499
Closing Date
3 Mar 2026, 3:00 pmClosed
Assistant Engineer
O/O Assistant Engineer LID EW Section Nellaya GP
Annual Plan-NLY GP 2025-26 PROJECT NO 73 MADATHILPADI KUNDIL ROAD RENOVATION- MADATHILPADI KUNDIL ROAD RENOVATION MGR-500000-General Civil Work
2026_LSGD_839757_1
ET-5/73/AE/LSGD/NLY/25-26
Open Tender
Civil Works - Roads
365 days
NELLAYA
Please refer Tender documents.
7 documents required · 7 mandatory
₹930
₹10,499
29 May 2026
24 Feb 2026
5 Mar 2026
24 Feb 2026
3 Mar 2026
24 Feb 2026
SIDE PROTECTION
3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3
OD455813/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site (modified data 60.7.1)
75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1415216.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.85 MB
BOQ_1415216.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid