| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC DATTUMURI BASTI 22 12 SIJUA DHANBAD | DHANBAD | DHANBAD | JHARKHAND | 828121 | L1 | Accepted-AOC Approved | |
| 2 | L2₹2.5 L+₹9,469.64 (4.00%)Rejected-Finance CHHATABAD KATRASGARH DHANBAD DHANBAD 828113 JHARKHAND INDIA | DHANBAD | JHARKHAND | 828113 | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.5 L+₹16,571.87 (7.00%)Rejected-Finance 22 12 SIJUA TETULMARI DHANBAD DHANBAD DHANBAD 828121 JHARKHAND INDIA | DHANBAD | JHARKHAND | 828121 | L3 | Rejected-Finance L3 |
Tender Value
₹2.4 L
EMD Value
₹2,959
Closing Date
18 Sept 2025, 5:00 pmClosed
AM EnM Sijua Area
Sijua Area office
For Partial Repairing Cork Sheet Change Stud Change of 3 Nos. Lighting Transformer (a)1000KVA,11KV/440V(b) 500KV,11KV/550V(C ) 100KVA,3.3KV/440V TMC(2)and Maintenance and Overhauling and Transformer Oil Filtration of 500KVA 11KV/440V Transformer
2025_BCCL_343478_1
GM/SA/AM(EnM)-NIT/2025-26/058
Open Tender
Electrical and Maintenance Works
Percentage
10 days
TMC and NPTS under Sijua Area
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,959
31 Oct 2025
8 Sept 2025
19 Sept 2025
9 Sept 2025
18 Sept 2025
9 Sept 2025
9 Sept 2025 - 16 Sept 2025
eProcurement System of Coal India Limited Created By: Lokesh Jain Created Date/Time: 17-Oct-2025 04:00 PM Tender Title: Partial Repairing Cork Sheet Change Stud Change of 3 Nos. Lighting Transformer (a)1000KVA,11KV/440V(b) 500KV,11KV/550V(C ) 100KVA,3.3KV/440V TMC(2)and Maintenance and Overhauling and Transformer Oil Filtration of 500KVA 11KV/440V Transformer Tender ID: 2025_BCCL_343478_1
Tender Inviting Authority: AM(E&M)
Name of Work: For Partial Repairing Cork Sheet Change Stud Change of 3 Nos. Lighting Transformer (a)1000KVA,11KV/440V(b) 500KV,11KV/550V(C ) 100KVA,3.3KV/440V TMC(2)and Maintenance and Overhauling and Transformer Oil Filtration of 500KVA 11KV/440V Transformer EEF make Sr.No.4010852 installed at Nichitpur Township Substation under Sijua Area.
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 ZED ENTERPRISES (GSTN-20AIDPA2564Q1ZF) BID ID -1184973 200628.00 0.00 236741.04 Two Lakh Thirty Six Thousand Seven Hundred and Fourty One
2.00 SANGAM ENTERPRISES (GSTN-20AIEPA2528F1Z5) BID ID -1184992 200628.00 7.00 253312.91 Two Lakh Fifty Three Thousand Three Hundred and Tweleve
3.00 LUXMI ELECTRICAL AND ENGINEERING WORKS (GSTN-20AJBPA5819K1ZN) BID ID -1185001 200628.00 4.00 246210.68 Two Lakh Fourty Six Thousand Two Hundred and Ten
Lowest Amount Quoted BY: ZED ENTERPRISES(236741.04)
BOQ Summary Details Tender Title: Partial Repairing Cork Sheet Change Stud Change of 3 Nos. Lighting Transformer (a)1000KVA,11KV/440V(b) 500KV,11KV/550V(C ) 100KVA,3.3KV/440V TMC(2)and Maintenance and Overhauling and Transformer Oil Filtration of 500KVA 11KV/440V Transformer Tender ID: 2025_BCCL_343478_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 ZED ENTERPRISES (BID ID -1184973) 236741.04 L1
2 LUXMI ELECTRICAL AND ENGINEERING WORKS (BID ID -1185001) 246210.68 L2
3 SANGAM ENTERPRISES (BID ID -1184992) 253312.91 L3
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .