Tender ID
Tender Value
₹20.8 Cr
EMD Value
₹11.9 L
Closing Date
11 Mar 2026, 12:00 pmClosed
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
CE/CON/II
15 conditions · 3 needing a document upload
Submit the scanned copy (In PDF Form) of the documents as per the requirement of financial eligibility criteria of the tender [Refer para 2.3 of tender document {Para 2.3 for tenderer(s) participating as JV firm}]. TENDERS NOT ACCOMPANIED BY THESE DOCUMENTS WILL BE SUMMARILY REJECTED.
Submit the scanned copy (In PDF Form) of the documents for evaluating the Bid Capacity (Please refer Clause 12.25 of tender document). This is applicable in all works contract having tender value of Rs. 20.00 Crore and above. TENDERS NOT ACCOMPANIED BY THESE DOCUMENTS WILL BE SUMMARILY REJECTED.
Submit the scanned copy (In PDF Form) of the work(s) completion certificate(s) as per the requirement of Technical eligibility criteria of the tender [Refer para 2.3 of tender document {Para 2.3 for tenderer(s) participating as JV firm}]. TENDERS NOT ACCOMPANIED BY THESE DOCUMENTS WILL BE SUMMARILY REJECTED.
Defination of Similar Work :- Any Civil Engineering work involving construction of any residential/office buildings.
28 conditions · 15 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Notes for all schedules: Standard Schedule of Rates (SSOR) Items: Any item of work carried out by the Contractor on the instructions of the Engineer which is not included in the accepted Bill(s) of Quantities but figures in the Standard Schedule of Rates (SSOR), shall be executed at the rates set forth in the "Standard Schedule of Rates (SSOR)" modified by the tender percentage as accepted in the contract for that chapter of Standard Schedule of Rates (SSOR). However, the cumulative value of all such extra item(s) together (modified by the respective tender percentage) shall not exceed 10 % of the original contract value.
Option of Payment through Letter of Credit (L.C.): Tenderer(s) may submit option for taking payment through Letter of Credit (L.C.). [Refer para 7.1 of tender document].
Credentials if submitted in foreign currency shall be converted into Indian currency i.e., Indian Rupee as under: The conversion rate of US Dollars into Rupees shall be the daily representative exchange rates published by the Reserve Bank of India for the relevant date. Where, relevant date shall be as on the last day of month previous to the one in which tender is invited. In case of any other currency, the same shall first be converted to US Dollars as on the last day of month previous to the one in which tender is invited, and the amount so derived in US Dollars shall be converted into Rupees at the aforesaid rate. The conversion rate of such currencies shall be the daily representative exchange rates published by the International Monetary Fund for the relevant date.
Electronic Reverse Auction (eRA) is applicable in works tender valued more than Rs 50 crore in each case. [Refer para 7.2 of tender document].
Contract under EBR (IF): It is agreed by and between the parties that Railway shall continue to be held responsible for all obligations, risk and liabilities, whatsoever, arising out of or in connection with the Principal agreement and this novation agreement, whether during the progress of the work or after its completion. It is further agreed and understood by and between the parties that IRFC shall be the owner of assets, if any, arising out of execution of works as defined in the Principal Agreement, except the land whose ownership shall continue with Railway. Accordingly, the invoices shall be issued by capturing GSTIN of contractor (as the supplier) and GSTIN of IRFC (as bill to party). Also, the contractor shall submit the invoice, issued in the name of IRFC, to railway for processing payment by Railway to contractor subject to applicable TDS under the Income Tax, GST or any other applicable laws. It is further agreed by and between the Parties that IRFC shall be responsible to comply with Income Tax and GST laws in relation to filling of returns.
There are several changes in the tender document after the new GCC April 2022 is issued. Tenderer(s) are requested to go through the tender document & GCC carefully before the submission of the offer.
Clarification of Bids: To assist in the examination, evaluation & comparison and pre-qualification of the Tender, the Railway may, at its discretion, ask any Bidder for a clarification of its Bid. Any clarification submitted by a Bidder that is not in response to a request by the Railway shall not be entertained or considered. The Railway request for clarification and the response of the bidder in this regard shall be in writing. However, if a Bidder does not provide clarification of its bid by the date and time communicated in the Railway request for clarification, the bid shall be evaluated as per the documents submitted along with the bid.
All General Instructions are available in the uploaded tender document.
The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids (i.e. excluding the last date of submission of bids). Nominated officials are Dy CE/Con/Works & Stores/GRC, S. E. Railway, Kolkata-700043 and Dy CE/Con/Adra, Office of the Dy CE/Con/Adra, S. E. Railway
Construction of 04 nos. type-III quarters, 08 nos. type-II quarters, camp office at Chandil and Damodar, Officer Rest House accommodation at Purulia in connection with Chandil-Burnpur third line project under the Dy CE/Con/Adra.
4598-GRC-CE-C-II-28-2025
4598-GRC-CE-C-II-28-2025
Open
Works - General
24 Months
Unknown (Unspecified Location)
₹0
₹11.9 L
11 Feb 2026
11 Feb 2026
273 items across 10 schedules · ₹18,99,98,021.45 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| EARTH WORK | — | — | — | — | |
| General | — | — | — | — | |
| Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | — | — | — | — | |
| 1 | All kinds of soil. | cum | 4376 | 260.3 | 11,39,072.8 |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | cum | 738 | 700.5 | 5,16,969 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | cum | 714 | 2,123.75 | 15,16,357.5 |
| CONCRETE WORK | — | — | — | — | |
| CEMENT CONCRETE (CAST IN SITU) | — | — | — | — | |
| Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | — | — | — | — | |
| 4 | 1:1 1/2:3 (1 Cement: 1 1/2 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 1411 | 8,340.85 | 1,17,68,939.35 |
| 5 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 75 | 7,878.5 | 5,90,887.5 |
| 6 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 671 | 7,294.7 | 48,94,743.7 |
| REINFORCEMENT CEMENT CONCRETE | — | — | — | — | |
| FORM WORK | — | — | — | — | |
| Centering and shuttering including strutting, propping etc. and removal of form for | — | — | — | — | |
| 7 | Foundations, footings, bases of columns, etc. for mass concrete | Sqm | 6734 | 392.15 | 26,40,738.1 |
| 8 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | Sqm | 1328 | 842.5 | 11,18,840 |
| 9 | Suspended floors, roofs, landings, balconies and access platform | Sqm | 3613 | 927.25 | 33,50,154.25 |
| 10 | Lintels, beams, plinth beams, girders, bressummers and cantilevers | Sqm | 5370 | 736.4 | 39,54,468 |
| 11 | Columns, Pillars, Piers, Abutments, Posts and Struts | Sqm | 3661 | 961.3 | 35,19,319.3 |
| 12 | Stairs, (excluding landings) except spiral- staircases | Sqm | 102 | 764.95 | 78,024.9 |
| DESIGN MIX CONCRETE | — | — | — | — | |
| Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete w o r k ; u s i n g coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag c e m e n t , admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: | — | — | — | — | |
| All works upto plinth level | — | — | — | — | |
| 13 | Concrete of M25 grade with minimum cement content of 330 kg /cum | cum | 980 | 9,504.75 | 93,14,655 |
| All works above plinth level upto floor V level | — | — | — | — | |
| 14 | Concrete of M25 grade with minimum cement content of 330 kg /cum | cum | 1721 | 9,860.4 | 1,69,69,748.4 |
| MASONRY WORK | — | — | — | — | |
| General | — | — | — | — | |
| Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: | — | — | — | — | |
| 15 | Cement mortar 1:6 (1 cement : 6 coarse sand) | cum | 767 | 7,132.25 | 54,70,435.75 |
| HALF BRICK MASONRY | — | — | — | — | |
| Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. | — | — | — | — | |
| 16 | Cement mortar 1:4 (1 cement :4 coarse sand) | Sqm | 623 | 1,123.8 | 7,00,127.4 |
| EXPOSED BRICK WALL | — | — | — | — | |
| Brick work with non modular fly ash bricks conforming to IS:12894, class designation 10 average compressive strength in super structure above plinth level up to floor V level in : | — | — | — | — | |
| 17 | Cement mortar 1:6 (1 cement : 6 Coarse sand) | cum | 1662 | 8,752.55 | 1,45,46,738.1 |
| ROAD WORK | — | — | — | — | |
| ROADS | — | — | — | — | |
| Supplying and stacking at site. | — | — | — | — | |
| 18 | 63 mm to 45 mm size stone aggregate | cum | 656 | 1,636.05 | 10,73,248.8 |
| 19 | 53 mm to 22.4 mm size stone aggregate | cum | 556 | 1,842.3 | 10,24,318.8 |
| 20 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density . | cum | 1212 | 1,046.95 | 12,68,903.4 |
| WATER PROOFING | — | — | — | — | |
| General | — | — | — | — | |
| 21 | Providing and mixing integral crystalline admixture for water proofing treatment to RCC structures like basement raft, retaining walls, reservoir, sewage & water treatment plant, tunnels / subway and bridge deck etc. at the time of transporting of concrete into the drum of the ready-mix truck , using integral crystalline admixture @0.80% (minimum) to the weight of cement content per cubic meter of concrete) or higher as recommended by the manufacturer's specification in reinforced cement concrete at site of work. The material shall meet the requirements as specified in ACI-212-3R- 2010 i.e. by reducing permeability of concrete by more than 90%, compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure. The crystalline admixture shall be capable of self-healing of cracks up to a width of 0.50 mm. The work shall be carried out all complete as per specification and the direction of the Engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. | Kg | 500 | 388 | 1,94,000 |
| Schedule total | ₹8,56,50,690.05 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCApril-2022.pdf
BarChart_1.pdf
ElectricalNotes_1.pdf
AdvanceCorrectionSlipNo1to10_1.pdf
TD28-2025.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .