Loading…
Loading…
225 live130 closing this weekmost from Rail Coach Factory, Kapurthala and Indian Railways
225 results • Latest
SUPPLY & INSTALLATION OF SET OF LAYOUT OF MODULAR TOILET, PANELLING & MOULDING OF ENDWALL AND PARTITION, CEILING OF DOORWAY, GANGWAY, MOTHER ROOM & STORE ROOM FOR BANGALADESH RAILWAYS ( 04 TYPES)
Electrical arrangement for Proposed RPF Post in Workshop RCF Kapurthala.
TROUGH FLOOR ASSEMBLY COMPLETE FOR 3 PHASE MEMU/DMC COACH NOTE:- 1.0 EXTRA CHANNELS ARE TO BE PROVIDED ON SUITABLE LOCATION OF TROUGH FLOOR ASSEMBLY FOR LIFTING/TRANSPORATION PURPOSE ., as per Drawing: EM11545 ALT'b' ITEM NO. 6 TO BE SUPPLIED AS LOOSE IN SEPRATE PACKING, Packing Instruction: NO SPECIAL PACKING REQUIRED. THE PROTRUDING, THREADED PORTION, GAUGES AND LOOSE ITEMS ETC. IF ANY ARE TO BE PROTECTED WITH SUITABLE COVERING TO PREVENT IT FROM DAMAGE. HOWEVER TRANSIT DAMAGE IF ANY SHALL BE AT THE COST OF SUPPLIER.
SET OF ALUMINIUM CHEQUERD SHEET FOR AC 2-TIER AMRIT BHARAT COACHES
GLASS UNIT FOR FIXED WINDOW (680X880) FOR LHB POWER CAR EOG COACHES
FRONT LOOK OUT GLASS FOR MEMU DMC 3PHASE COACHES AS PER DMU/DPC/SS-1- 0-043 ALT. a
HANDLE FOR WATER TANK FLAP ARRGT. (ACP) FOR AMRIT BHARAT 3.0 COACHES.
SMALL FIXED WINDOW FOR AC AMRIT BHARAT 3.0 COACH
SET OF ALUMINIUM COMPONENTS FOR FLOORING IN LHB HOT BUFFET AMRIT BHARAT 3.0 COACHES
BODY SIDE & EMERGENCY OPENABLE WINDOW ARRANGEMENT FOR AMRIT BHARAT 3.0 COACH
Sterileand Single Use) Conformingto IS/ISO10555 (Part5) (Q2)
SUPPLY, TESTING AND COMMISSIONING (INCLUDING ALL CONNECTIONS AND DRESSING W/O LOADING) OF SWITCH BOARD CABINET