Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 CrAccepted-AOC MONIPILLIL HOUSE AVOLI P O ANICAD MUVATTUPUZHA ERNAKULAM | MUVATTUPUZHA | ERNAKULAM | KERALA | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.7 Cr+₹96.7 L (7.60%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹14.8 Cr+₹2.1 Cr (16.2%)Rejected-AOC KURUKOOR HOUSE KUTHUKUZHI P O KOTHAMANGALAM | KOTHAMANGALAM | ERNAKULAM | KERALA | L3 | Rejected-AOC L3 | |
| 4 | Rejected-Technical EDAPAZHATHIL HOUSE VAZHAKULAM PO MUVATTUPUZHA | MUVATTUPUZHA | ERNAKULAM | KERALA | - | Rejected-Technical Not prequalified |
Tender Value
₹12.8 Cr
EMD Value
₹5 L
Closing Date
22 Sept 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
P H Circle, Kerala Water Authority Kalmandapam, Palakkad.
Providing FHTCs (3866 Nos) and laying balance distribution system in Vilayur Gramapanchayath
2020_KWA_381428_1
26/20-21/SE/PHC/PKD
Open Tender
Civil Works - Others
Lump-sum
300 days
Vilayur
As per NIT
3 documents required · 3 mandatory
₹16,800
online
₹5 L
PH Circle Palakkad
11 Nov 2020
28 Aug 2020
24 Sept 2020
28 Aug 2020
22 Sept 2020
28 Aug 2020
28 Aug 2020 - 3 Sept 2020
4 Sept 2020
120 days
Amount
Jal Jeevan Mission 2020 - 21 - Prividing FHTCs in Vilayur Panchayath and laying balance distribution
Supplying ,laying ,testing,commissioning and maintenance of distribution system using 350mm to 200mm DI K9 pipe 160mm to 90mm PVC pipe, 150mm to 80mm GI pipes in Vilayur panchayath including all types of specials for laying, taking branch lines, providing control valves, scour valves, air valves, supplying and fixing of required type of joints possible in DI/PVC/GI/MS, providing MS fabricated pipe for road crossing through the casing pipe and providingFHTCs including geotagging and construction of RCC pillar for supporting pipes at Edapalam thodu,Chirakkal thodu and Chundanpetta thodu and all other works mentioned in NIT volume 2.(Scope of work). (It is the responsibility of the contractor to complete all works in the scope of work, successfully, trial run and commissioning and maintain the entire work done by him for the maintenance period of 12 months after commissioning and handing over the scheme to KWA. The defect liability period (guarantee period) is 24 months for electro mechanichal and electrical works from date of commissioning. The quoted amount shall be inclusive of all incidental charges, etc. for completion of all works in scope of work as per site conditions)
JB Engineering and construction company
Tomco Engineering (P) Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
recovered-award.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .