Tender Value
₹8.3 L
EMD Value
₹9,000
Closing Date
4 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Anand Irrigation Division Anand.
Desilting , Jungle Cutting And Removing Debries of various Canal Structure and Canal Under the Sandesar Section
287156
19 of 2025-26
Open
Miscellaneous Works
Anand
6 documents required · 5 mandatory · 1 optional
₹900
Yes
Executive Engineer Anand Irrigation Division Anand
₹9,000
Yes
20 Mar 2026
20 Mar 2026
20 Mar 2026
4 Apr 2026
20 Mar 2026
Bill of Quantities
Memorandum showing items of works to be carried out
OF Desilting , Jungle Cutting And Removing Debries of various Canal Under the Sandesar Section
Item No Descripation of Item Quantity Unit Rs. in figures. Amount
Clearing the shrubs, like akadas, weeds and other
vegetables including depositing the same outside and
1 burning etc. complete from canal beds and both slopes 19.68 Km 5776.00
of the banks, for canal with discharge. For Canals
Below - 20 Cusecs.
Clearing the silt from the canal/drain bed by a digging
the same to the required bed level and gradient
including depositing the excavated earth regularly in
spoil bank for utilizing the same preparing the banks
after breaking clods as and where directed for all leads
and lifts.For Canals Below 20 Cusec. & 0 to 1.5 m lift.
Clearing the silt from the CANAL BED / SLOPE by
digging the same to the required bed level and
gradient including depositing the excavated earth
3 regularly in spoil bank for utilizing the same preparing 1061.00 Cum 57.10
the banks after breaking clods as and where directed
for lead upto 50 m. and all lifts. Canal Having Capacity
Below 20 cusecs. (BY MACHINERY)
Clearing the silt/debries from the pipe
culvert/syphon/ syphon well. Under ground pipe
drain/box drain for Drain/Canal by digging the same
including depositing the excavated earth/debries etc.
for all leads and lift.(A) For pipe culvert/ Syphon. (i)
Upto 900 mm dia. Pipe.
Rs. Eight Lac Twenty Seven Thousand Two Hundred Fifteen & Thirty Eight Paise Only
I / We am /are willing to carry out the work at .....-....... % above /below..........-......................
.................................................( percent should written in figures and words )
of the estimated rate mentioned above.Amount of my / our tender work out as under.
Estimated amount Put to tender
Estimated amount Put to tender
Deduct :- ____ % Below Add ____ % above
In words Rs. In words Rs.
Notes 1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-
Charge for which no extra payment shall be made.
Notes 2 - The labour cess will be deducted as pe rprevailing rules i.e.1% of the work done.
Notes 3 - GST and Incometax TDS will be deducted at a source while making payments of bills.
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-
10/2017CementConsumption/16/CDate:11/05/2017as stated in
S.O.R.therefore in R.C.C.items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in
all the tender.
Deputy Executive Engineer
Anand Irrigation Sub Division
Signature of contractor. Anand
Price Adjustment Statement
Name of Work:- Desilting , Jungle Cutting And Removing Debries of various Canal Under the Sandesar Section
Brake up of Rate Brack Up Amount
Without GST Rate
Item No. Item of work but may be
Unit Amount (Rs.)
more or less Plant & Machinery
Labour Cement Steel Bitumen POL Machinery Other Material Labour Cement Steel Bitumen POL Other Material
Clearing the shrubs, like akadas, weeds and other
vegetables including depositing the same outside and
slopes of the banks, for canal with discharge. For
Canals Below - 20 Cusecs.
Clearing the silt from the canal/drain bed by a digging
the same to the required bed level and gradient
including depositing the excavated earth regularly in
after breaking clods as and where directed for all
leads and lifts.For Canals Below 20 Cusec. & 0 to
Clearing the silt from the CANAL BED / SLOPE by
digging the same to the required bed level and
gradient including depositing the excavated earth
preparing the banks after breaking clods as and
where directed for lead upto 50 m. and all lifts. Canal
Having Capacity Below 20 cusecs. (BY MACHINERY)
Clearing the silt/debries from the pipe
culvert/syphon/ syphon well. Under ground pipe
drain/box drain for Drain/Canal by digging the same
including depositing the excavated earth/debries etc.
for all leads and lift.(A) For pipe culvert/ Syphon. (i)
Upto 900 mm dia. Pipe.
Deputy Executive Engineer Executive Engineer
Anand Irrigation Sub Division Anand Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice-19 of 2025-26 Online -(03-2026) .pdf
1 FRONT PAGE sub minor Sandesar.pdf
2 Certificate sub minor Sandesar.pdf
2.1 Checklist sub minorSandesar.pdf
3 NIT sub minor Sandesar.pdf
4 New SBD Book Sandesar.pdf
5 GTS Sub minor Sandesar.pdf
6 BOQ AND POL Sub minor Sandesar.pdf
7 Special ConditionSandesar.pdf
8 ITS sub minor Sandesar.pdf
Download all tender documents and submit your bid