| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 CrAccepted-AOC | ₹6.2 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹6.4 CrRejected-Finance | ₹6.4 Cr | L2 | Rejected-Finance L2 BIDDER |
| 3 | L3₹6.4 CrRejected-Finance | ₹6.4 Cr | L3 | Rejected-Finance L3 BIDDER |
Tender Value
₹5.8 Cr
EMD Value
₹5.8 L
Closing Date
27 Jan 2026, 5:00 pmClosed
CHIEF CONSTRUCTION ENGINEER, R.W.CIRCLE, SAMBALPUR
CHIEF CONSTRUCTION ENGINEER, R.W.CIRCLE, SAMBALPUR
Construction of Bridge over Dharmadandi Nallah at 2nd Km on Ganthiapali to Sialbahali road in the District of Bargarh under SBY for the year 2024-25.
2026_CERWI_124608_1
BRIDGE TENDER ONLINE RWCSBP-28/2025-26
Open Tender
Civil Works - Bridges
450 days
Padampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹5.8 L
Yes
26 May 2026
15 Jan 2026
28 Jan 2026
15 Jan 2026
27 Jan 2026
15 Jan 2026
15 Jan 2026 - 22 Jan 2026
Earthwork in excavation in cutting in hard soil within the initial lead and lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth etc complete as per the direction of the Enngineer in Charge.
Earthwork in excavation in foundation in hard soil within the initial lead and lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth etc complete as per the direction of the Enngineer in Charge.
Plain Cement Concrete (1:3:6) using 40mm down graded chips in Foundation and Plinth
Plain Cement Concrete M15 Grade using 40mm down graded chips in Foundation and Plinth
Reinforced Cement Concrete M 30 Grade using 20mm down graded chips in superstructure-Foundation
Abutment & Pier Shaft
Pier & Abutment Cap
DIRT Wall
Retaining Wall / Wing Wall
Approach Slab
Wearing Course- Mastic Asphalt
DECK SLAB
RCC Railing & Post of M25 Grade Concrete
Straightening, cutting, bending binding M/S or T.S. rods and placing in position etc. complete
Providing and laying of Filter media with stone crushed aggregates of 45 mm size satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment , wingwall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specifications.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications.
Rough stone dry packing in approns and revetments with hard granite stone (30 cm & above) including cost of all materials etc complete
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification-Gravel backing
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification -BOULDER FILLING WITH SAND GROUTED
Providing and fixing 15 cm dia & 1.00m long RCC Guard posts including all costs & conveyance etc complete.
Providing fitting and fixing of expansion joint -Strip seal Expansion Joint
Providing fitting and fixing of expansion joint -Fixing of Salitax Board
Cement Concrete 1:3:6- Below approach slab
Providing and laying Tar paper
Providing, fitting & fixing of Drainage spout
Providing and applying two coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescense and applying paint @ 1 litre per 02 Sqm
Providing, fitting & fixing of SBY Information board
APPROACH ROAD--Construction of embankment with approved material obtained from borrow pits with all liifts and leads, transporting to the site by mechanical means within a lead of 05kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H specifications for Road & Bridge works (04th Revision)
Loosening of the ground upto a level of 500 mm below the sub grade level, watered, graded and compacted in layers to meet requirements of table 300 - 2 for sub grade construction & clause 305 of MoSRT&H specifications for road & bridge works (4th revision).
Construction of granular sub-base by providing Close graded Granular subbase Grading-III material as per table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density complete as per Clause 401 of MoSRT&H Specifications for Road & Bridge works (4th Revision)
Providing, laying, spreading & compacting graded stone aggregate to Wet Mix Macadam specification including pre mixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on well prepared surface & compacting with vibratory roller to acieve the desired density as per clause 406 of MoSRT & H specifications for road & bridge works.(4th Revision)
Providing and applying Primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surfaces and spraying primer @ 0.60kg/ sqm using Mechanical means as per clause 502 of MoSRT&H Specifications of Road & Bridge work (04th Revision)
Providing and applying Tack coat with bitumen emulsion on prepared surface including clearing of road surfaces and spraying primer @ 0.20kg/ sqm using Mechanical means as per clause 502 of MoSRT&H Specifications of Road & Bridge work (04th Revision)
Providing & laying Bituminous Macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen, transported to site, laid over previously prepared surface with hydrostatic paver finisher with sensore control to the required grade, level & alingment & roling with smooth wheeled,vibratory & tandem rollers to achieve the desire compaction as per clause 504 of MoSRT&H Specifications for road and bridge works (4th Revision) Page-169 Item -45
Providing & laying Semi Dense Bituminous Concrete with batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to site, laying with a hydrostatic paver finisher with sensore control to the required grade, level & alingment, roling with smooth wheeled,vibratory & tandem rollers to achieve the desire compaction as per clause 508 of MoSRT&H Specifications for road and bridge works (4th Revision) Page -175 item - 47
Fine dressing & Turfing with initial lead of 50 mtr. and initial lift of 1.50 mtr..
RETAINING WALL-Earthwork in excavation in foundation in hard soil within the initial lead and lift including rough dressing and breaking clods to maximum 5cm to 7cm andlaying in layers not exceeding 0.3 mtr in depth etc complete as per the direction of the Enngineer in Charge.
Filling in Foundation Trenches with sand as per drawing and technical specification and as per the direction of the Engineer-in-charge.
Providing Plain Cement Concrete of Nominal Mix of (1:3:6) in open foundations comepte as per drawings and as per direction of Engineer in Charge.
Plain Cement Concrete M 15 Grade using 20mm down graded chips in Foundation and Plinth
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications.
Rough stone dry packing in approns and revetments with hard granite stone (30 cm & above) including cost of all materials etc complete
(CROSS DRAINAGE WORKS):-Earth work in excavation of fondation in hard soil within the initial lead & lift including dressing & levelling the bed & depositiong the excavated earth away from the site etc. all complete as per the direction of Engineer in Charge.
Filling sand-Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge.
P.C.C-M-15using 40mm size H.G.metal well rammed with cost, Conveyance , royality,taxes of all material and labour,T & P etc.Complete.
Providing laying R.C.C. Hume pipe NP3 class for culverts including fixing collar with cement mortar 1:2 but excluding excavation, protection work, backfilling,concrete and masonry work in head walls and parapets clause 1106 of MORD specification for Rural roads and as per irection of Engineer-in charge.(1000 mm Dia Single row HPC)
Plain cement concrete M-15 grade in Foundation complete as per drawing and technical specification.
Plain cement concrete M-15 grade in Sub-Structure complete as per drawing and technical specification.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
Tendernotice_2.pdf
PDF • 6.00 MB
BOQ_575920.xls