Loading…
Loading…
Tender Value
₹63.8 L
EMD Value
₹63,778
Closing Date
9 Jun 2026, 3:15 pm4d left
GUNTUR MUNICIPAL CORPORATION
GUNTUR
Gorantla water tank 4200KL and 600KL inlet and outlet Pipe line (2nd Call)
941530
ET No.12/2026-27, Item No.01
OPEN - NCB
Similar Work
GUNTUR
1 document required · 1 mandatory
₹2,258
₹63,778
30 May 2026
30 May 2026
30 May 2026
Supply and fixing of M.S Plats and its fabricatin charges etc., complete for M.S Pipes - 1 Kg. including cost and conveyance of all materials and labour charges for cutting, welding, grinding etc., , complete.as directed by the departmental authorities.
Supply, Delivery of D.I double flanged Sluice Valves conforming to IS- 14846 (with up to date amendments, if any) including gear arrangements for the following dia. as per test pressure having Body, Bonnet, Dome, Stool cover, Wedge, Stuffing box, Gland, Thrust plate, Cap/Hand wheel with D.I; Stem, Body seat ring, Wedge facing ring, Bushes, Bolts, Nuts, Pinion and Pinion shaft with Stainless steel (IS 6603) ; Wedge nut, Shoe, Channel with Leaded Tin Bronze ( IS 318 ); Gasket with Neoprene Rubber; Gland packing with Rubber; Gear, Gear housing with Cast Steel excluding all taxes and transportation, etc. complete ISI marked PN-1.6 (Mpa)
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering (BLD-CSTN-2-13.C)
Centering Charges for RCC vertical walls of plane surface including all type of labour charges (Open drains) for 600 mm and above.
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
Provision for Seignorage charges
Provision for DMF @ 30% on Seigniorage Charges
Provision for Consideration @ 100% on Seigniorage Charges
Provision for Merit @ 2% on Seigniorage Charges
Provision for NAC @ 0.10%
Provision for GST @ 18%
Provision for TPQA @ 0.739 %
Unforeseen item
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT - Copy.docx
TENDER_DOCUMENT • 0.03 MB
Tender Document.doc
TENDER_DOCUMENT • 0.45 MB
DECLARATION .docx
TENDER_DOCUMENT • 0.02 MB
Gorantla Pipe Line.xlsx
TENDER_DOCUMENT • 0.08 MB
Download all tender documents and submit your bid