Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.4 LAdmitted-Finance | -31.32% | ₹12.4 L | L1 | Admitted-Finance |
| 2 | L2₹13.1 LAdmitted-Finance | -27.30% | ₹13.1 L | L2 | Admitted-Finance |
| 3 | L3₹13.5 LAdmitted-Finance | -25.02% | ₹13.5 L | L3 | Admitted-Finance |
| 4 | L4₹14.1 LAdmitted-Finance | -21.88% | ₹14.1 L | L4 | Admitted-Finance |
Tender Value
₹18.0 L
EMD Value
₹36,040
Closing Date
28 May 2026, 6:00 pmClosed
XEN LMC CAD K PATAN
XEN LMC CAD K PATAN
Excavation Desilting and Construction of VRB in Drainage system in Balkasha Section Ist of Sub Division Kapren.
2026_CADKO_560724_7
CAD K PATAN NIT 02/2026-27
Open Tender
Civil Works
BUNDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
AS PER NIT
₹36,040
Yes
1 Jun 2026
20 May 2026
29 May 2026
20 May 2026
28 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ITEMS | |||||
| 1.01 | Excavation including loading, unloading, disposal and dressing of excavated earth within intial lead of 50m and lift up to 1.5 m in dry or moist including dressing of excavated area dewatering wherever required complete in all respect (b)Hard / Dense soil | 1 | P.Cum | 79 | ₹78.92 |
| 1.02 | Providing and laying in position Cement concrete Nominal mix (1:3:6) M-10 including leads of all construction materials, curing , compaction and finshing with rendering in cement mortar 1:3 ( 1 Cement : 3 Coarse sand ) and making good the joints excluding the cost of centring, shuttering and reinforcement and finishing having well graded crushed broken stone aggregate of maximum size up to 20mm | 1 | P.Cum | 4,654 | ₹4,649.35 |
| 1.03 | Side shuttering including proping etc. complete (to achieve finish f2 (a) for block joints of foundation, stilling basins, buckets, aprons etc. (non-suspended horizontally lain mass concrete) for Dowels. | 1 | P.Sqm | 160 | ₹159.84 |
| 1.04 | Supplying of M.S. reinforcement including labour charges for bending, binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using toe or ribbed bar (IS:1786-1985) | - | P.kg | 78 | - |
| 1.05 | Centring and shuttering for slab, beam, lintels, columns through with or without caps and base including propering and remove. | 1 | P.Sqm | 225 | ₹224.78 |
| 1.06 | Providing and laying in position Cement concrete Nominal mix (1:1.5:3) M-20 including leads of all construction materials, curing , compaction and finshing with rendering in cement mortar 1:3 ( 1 Cement : 3 Coarse sand ) and making good the joints excluding the cost of centring, shuttering and reinforcement and finishing having well graded crushed broken stone aggregate of maximum size up to 20mm | 1 | P.Cum | 5,564 | ₹5,558.44 |
| 1.07 | Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. NP-3 (h) 1000 mm | - | P.RM. | 7,217 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.54 MB
BOQ_998068.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid