Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.5 LAdmitted-Finance | -33.53% | ₹6.5 L | L1 | Admitted-Finance |
| 2 | L2₹7.2 LAdmitted-Finance | -26.01% | ₹7.2 L | L2 | Admitted-Finance |
| 3 | L3₹7.8 LAdmitted-Finance | -20.10% | ₹7.8 L | L3 | Admitted-Finance |
| 4 | L4₹8.8 LAdmitted-Finance | -10.12% | ₹8.8 L | L4 | Admitted-Finance |
| 5 | Not Admitted-Finance | - | - | - | Not Admitted-Finance Others-other |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
23 Mar 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW RAJOURI
EXECUTIVE ENGINEER REW RAJOURI
Please Refer BOQ
2026_RDPR_306368_1
e-NIT No. 359 REW Rajouri of 2025 Dated 16-03-2026
Open Tender
Civil Works
30 days
RAJOURI
Please Refer Tender Documents
2 documents required · 2 mandatory
₹500
CD Account N0 0020010200000890
₹20,000
26 Mar 2026
17 Mar 2026
24 Mar 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
Earth work in bulk excavation by mechanical means with 70% AKS & 30% OR
Earth work in Trench excavation by mechanical means with 70% AKS & 30% OR
Earth work in surface excavation by mechanical means with AKS
P/Lnon pressure NP3class R C C pipes with collars jointed 600mm dia
Supply and stacking of graded stone aggregates of 63-45mm nominal size
Supply and spreading of good earth over shingle layer (Excluding cost of rolling and watering)
Laying of WBM all works complete
Providing and laying in position cement concrete of M5 grade including curing but excluding the cost of centring and shuttering.
Providing and laying in position cement concrete of M10 grade including curing but excluding the cost of centring and shuttering.
Providing and laying in position BOULDERS
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. M15
Steel reinforcement for RCC work @80kg/m3
Centering and shuttering including strutting, propping etc. and removal of form work Foundations
Centering and shuttering including strutting, propping etc. and removal of form work Edges
Material Consumptions and Carriages, Carriage of Sand /Aggragates by 50km MT
Carriages of stones by 10 km by MT
carriage of NP3 RCC pipes by 70 Km MT
Add Cost Of CIB
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_994796.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid