Loading…
Loading…
Tender Value
₹1.7 Cr
EMD Value
₹3.5 L
Closing Date
30 Jun 2026, 11:00 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (WMS)
Above/Below/Par
WORKS
16 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V = Advertised value of the tender in crores of Rupees N = Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-F, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The individual / firm should have minimum Valid B grade electrical license and the license should be on their own name/Firm name issued by the Competent Authority. A copy of license should be uploaded through IREPS with their offer, failing which the tender will be rejected.
Definition for SIMILAR NATURE OF WORK (Ref: CEE/SCR Letter no. E.227/TL&AC/4/Policy dt: 08.09.2010) The tenderer should have executed any work in coaches such as Provision of with/ without supply of emergency light unit/ Laptop/ Mobile Charging point/ Footboard lighting/ Reservation chart lighting including wiring/ rewiring in TL/AC/EMU/MEMU/ coaches in divisions/ Workshops/production units.
44 conditions · 4 needing a document upload
Contractor should have GST Registration and Certificate should be submitted along with tender. The Tenderer should be GST Compliant. No Bills will be acceptable without GST Registration, which is mandatory after starting of GST Implementation. Responsibility for remitting the GST lies with the Tenderer. This GST will be reimbursed on submission of proof of payment to the Government at prevailing rates for this work.
The contractor should have PAN card, they should attach copy of PAN card
The contractor has to submit the certificates required as per Tender document in support of their legal authority to participate in the tender in favor of the individual to sign the tender on behalf of the tenderer and create liability against them.
The tenderer should submit the copy of ANNEXURE-V online
The tenderer should submit the copy of ANNEXURE-VA online(if applicable)
The tenderer should submit the copy of an undertaking that the tenderer is not blacklisted or debarred by Railways or any other Ministry /Department of Govt. of India from participation in tender on the date of opening of bids [PDF file to be uploaded].
The tenderer should submit the copy of filled up & duly signed PART-I, PARTII, PART-III (A) & PART-III(B) of Tender Document [PDF file to be uploaded].
If the Bid of a Tenderer is seriously unbalanced in relation to the Engineers estimate of the cost of work to be performed under the contract, the Railways may require the tenderer to produce detailed price analysis for any or all items of the Tender Schedule, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed.
STATUTORY VARIATION CLAUSE: Any addition or variation of statutory taxes, levies and duties after the date of opening of tender shall be paid to the contractor after production of necessary document proof. Similarly benefit of reduction/abolition of duties, taxes or levies, if any, should be passed on to Railway.
The tenderer should submit the copy of filled up & duly signed (NEFT)MANDATE FORM-NEW (ANNEXURE-IV) along with tender
The tenderer should submit the copy of filled up & duly signed ANNEXURE-VI, along with tender[PDF file to be uploaded].
The contractor should have to pay statutory payments like EPF, ESI & Bonus etc., to the contract staff engaged for the subject work without fail and proof of such payments made shall have to be submitted to railways along with the bills for ensuring the compliance. However, Railways will not reimburse the same to the contractor.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The General Conditions of Contract governing the performance of the works covered by this tender are the Indian Railway Standard General Conditions of Contract as amended from time to time up to date. A soft copy of the Indian Railway Standard General conditions of Contract is uploaded in the annexed documents to the tender. Hard copy may be perused in the office of the Assistant Divisional Electrical Engineer/Carriage Repair Shop/Tirupati. Insubmitting his tender it would be deemed that the tenderer has kept himself fully informed of the provision of the IRS General conditions of Contract including all corrections and Amendments issued up to date and claim that he is not aware of any amendment or correction slip to the IRS GCC shall not be entertained
CORRIGENDUM NOTICE ON IREPS: [I]Railway may modify the tender document by issuing online corrigendum through www.ireps.gov.in [II] Prospective Bidders shall keep watch for CORRIGENDUM upto 15 days prior to the deadline for submission of bids. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer. [III]To give prospective bidders a reasonable time on account of CORRIGENDUM in preparing their bids, the Railways may at their discretion extend as necessary, the deadline for submission of Tender document. Railways decision will be final and no correspondence will be entertained from prospective bidders
Tenderer is instructed to carefully go through the Tender Schedule/Scope of Work, Measurement of Work & also visit the Site, before quoting his own percentage rates
Long Term Safety measures for Electrical installations in Track Machine camping coaches at Carriage Repair Shop, Tirupati for a period of 36 Months
CRS-E-02-26-27
CRS-E-02-26-27
Open
Works - General
36 Months
Tirupati, Andhra Pradesh
₹0
₹3.5 L
30 Jun 2026
9 Jun 2026
16 Jun 2026
59 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,72,81,660 | ||
| — | 110.00 | — | — | ||
| Supply of Industrial Plug and socket DB 63A, 2P+N+E+FP confirming to IEC 61439-3 suitable for flush mounting and surface mounting. | — | — | — | 14,73,230 | |
| — | 165.00 | — | — | ||
| Supply of Rotary change over switch 63A,440V, 2P, 2 way heavy duty | — | — | — | 3,10,530 | |
| — | 55.00 | — | — | ||
| supply of RCBO Rated current (In) 63 A, 2P (Phase + Neutral), rated voltage 230 V AC, frequency 50Hz, residual current sensitivity (In) 100 mA as , breaking capacity 6 kA or 10 kA (model dependent), tripping curve C suitable for DIN rail mounting. | — | — | — | 4,61,120 | |
| — | 55.00 | — | — | ||
| Supply of Duration monitoring relay | — | — | — | 1,03,840 | |
| — | 220.00 | — | — | ||
| Supply of 2 Amps, SP MCB (Desert Cooler; TV Set; Exhaust Fans, Electrical Chimney) | — | — | — | 1,33,980 | |
| — | 110.00 | — | — | ||
| Supply of 4 Amps, SP MCB (Kitchen Socket, Store Socket) | — | — | — | 66,990 | |
| — | 110.00 | — | — | ||
| Supply of 6 Amps, SP MCB (Refrigerator) | — | — | — | 39,930 | |
| — | 220.00 | — | — | ||
| Supply of 10 Amps, SPN MCB (1-Tonne AC; Lights & Fans) | — | — | — | 2,55,860 | |
| — | 110.00 | — | — | ||
| Supply of 16 Amps, SPN MCB (Induction Stove) | — | — | — | 1,27,930 | |
| — | 55.00 | — | — | ||
| Supply of 25 Amps, SPN MCB | — | — | — | 63,965 | |
| — | 55.00 | — | — | ||
| Supply of 16 way SPN distribution board (double door) | — | — | — | 2,64,385 | |
| — | 8250.00 | — | — | ||
| Supply of 16 Sq.mm E-Beam Copper Cable. (Existing FRLS Copper Cable has to be replaced with E-Beam Copper Cable) (Red-50Mtrs, Black-50 Mtrs & Green- 50 Mtrs) | — | — | — | 17,73,750 | |
| — | 18150.00 | — | — | ||
| Supply of 4 Sq.mm E-Beam Copper Cable. (Existing FRLS Copper Cable has to be replaced with E-Beam Copper Cable) (Red-110 Mtrs, Black-110 Mtrs & Green- 110 Mtrs) | — | — | — | 14,70,150 | |
| — | 49500.00 | — | — | ||
| Supply of 2.5 Sq.mm E-Beam Copper Cable. (Existing FRLS Copper Cable has to be replaced with E-Beam Copper Cable) (Red-300 Mtrs, Black-300Mtrs & Green- 300 Mtrs) | — | — | — | 21,78,000 | |
| — | 57750.00 | — | — | ||
| Supply of 1.5 Sq.mm E-Beam Copper Cable. (Existing FRLS Copper Cable has to be replaced with E-Bam Copper Cable) (Red-350 Mtrs, Black-350Mtrs & Green- 350 Mtrs) | — | — | — | 20,79,000 | |
| — | 2750.00 | — | — | ||
| Supply of 40mm dia Poly Amide Conduit Pipes (E-Beam Copper Cables has to be run through PA Conduit Pipes) | — | — | — | 4,86,750 | |
| — | 6050.00 | — | — | ||
| Supply of 25mm dia Poly Amide Conduit Pipes (E-Beam Copper Cables has to be run through PA Conduit Pipes) | — | — | — | 3,87,200 | |
| — | 24200.00 | — | — | ||
| Supply of 18mm dia Poly Amide Conduit Pipes (E-Beam Copper Cables has to be run through PA Conduit Pipes) | — | — | — | 5,80,800 | |
| — | 3355.00 | — | — | ||
| Supply of 6 Amps Switches (Modular Type) | — | — | — | 2,21,430 | |
| — | 550.00 | — | — | ||
| Supply of 16 Amps Switches (Modular Type) with indicator | — | — | — | 1,29,800 | |
| — | 550.00 | — | — | ||
| Supply of 16 Amps Sockets with complete switch Board (Modular Type) - (Induction Stove, Refrigerator) | — | — | — | 2,13,400 | |
| — | 825.00 | — | — | ||
| Supply of 6 Amps Sockets (Modular Type) (for Kitchen Socket, Store Socket, TV, Water Purifier; Desert Cooler, Electrical Chimney) | — | — | — | 1,46,025 | |
| — | 110.00 | — | — | ||
| Supply of 3 Modular plate with frame | — | — | — | 20,350 | |
| — | 110.00 | — | — | ||
| Supply of 4 Modular plate with frame | — | — | — | 24,420 | |
| — | 550.00 | — | — | ||
| Supply of 6 Modular plate with frame | — | — | — | 1,67,200 | |
| — | 220.00 | — | — | ||
| Supply of 8 Modular plate with frame | — | — | — | 87,560 | |
| — | 330.00 | — | — | ||
| Supply of 12 Modular plate with frame | — | — | — | 1,67,310 | |
| — | 55.00 | Per Coach | — | ||
| Rewiring of SG Coach, Refrigeration Works (3 AC Units), Loading / Unloading of Fridge /Deep Freezer (Each), POH of AC Fan (1 No.) ( In Camping Coach 19 Fans), POH of Exhaust Fan (1 No.)(In Camping Coach 2 Exhaust Fans), Unloading / Loading of Fan (1No.) + 2 Exhaust Fan (In Camping Coach 19 Fans), POH of Light Fitting (1 Nos) (In Camping Coach 24 Light Fittings) including erection, testing and commissioning of all the above coaches | — | — | — | 19,57,780 | |
| — | 55.00 | Per Coach | — | ||
| Attention of Panels and ceiling related to Mechanical portion | — | — | — | 18,88,975 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
RCCtenderschedule-ireps.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .