Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10.0 L
EMD Value
₹20,100
Closing Date
19 Jan 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer IFC DIvision Ganderbal
Irrigation and FC Jal Shakti Division Ganderbal
Construction of Right Wall on Left Side embankment of Tulmulla Nallah at Sehwat. Serial No 1
2022_IFC_156867_1
e_NIT NO 11 OF 2021-22
Open Tender
Civil Works
Item Rate
25 days
Irrigation and FC Jal Shakti Division Ganderbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer IFC DIvision Ganderbal
₹20,100
20 Jan 2022
12 Jan 2022
20 Jan 2022
12 Jan 2022
19 Jan 2022
12 Jan 2022
90 days
Amount
Earth –work in bulk excavation by manual means over areas (exceeding 30cm & upto 1.5m in depth, 1.5 mtrs in width as well as 10 sq m on plan ) including disposal of excavated earth Lead upto 50mtrsand lift upto 1.5m,as directed by Engineer –in-charge.All kinds of soils.
Open timber over areas inculding strutting , shorting etc. complete (Measurment to be taken of the face area timbered : ) Depth exceeding 1.5m but not exceeding 3m
Dumping stone in horizontal on level excluding cost of stones.
supply of stones (Nallah)
Providing and laying in position cement conc. of specified grade incl. curing excluding the cost of centering and shuttering. All work up to plinth-level. 1:4:8 (1 cement ,4 Coarse sand, 8 graded-stone. aggregate) 40mm nominal size (crushed)
Providing and laying in position cement conc. of specified grade including curing excluding the cost of centering and shuttering . All work up to plinth-level with:(1:3:6) 1 cement , 3coarse sand,6 graded-stone. aggregated 20mm nominal size
construction of ring bund/coffar dam by sand/earth filled bags poly EC bags and removal of the same after completion of work including cost of bags/sand/earth and bailing or pumping out water including all sorts of carriages by mechanical transport/head load if involved in all respects.complete job
FORM WORK : Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases for columns
Carriages of different materials from source to road site of work by mechanical transport incl. loading, unloading and stacking:-
Boulders from Wussan for an avg. lead of 15kms
40mm stone agg. for an avg.05kms.
20mm stone agg. And sand for an avg.05kms
Cement from Divisional stores for 18 kms
M/S ABDUL HAMID SOFI
abdul hamid
stage.html
html • 0.02 MB
finance_352296.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .