| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.4 CrAdmitted-Finance | ₹49.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹49.4 CrAdmitted-Finance | ₹49.4 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | N M ENTERPRISES L2 | M/s Puna Hinda L1 |
|---|---|---|---|---|---|
| 1.00Rumgong ADC HQ to NH-13 at Patum | |||||
| 1.01 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
By Manual Means. In area of light jungle. | 15.11 | Hect. | 99,028 ₹15.0 L | 99,028 ₹15.0 L |
| 1.02 | Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres. | 2,46,135.65 | Cum. | 255 ₹6.3 Cr | 216 ₹5.3 Cr |
| 1.03 | Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres. | 61,587.06 | Cum. | 207 ₹1.3 Cr | 309 ₹1.9 Cr |
| 1.04 | Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres | 12,044.37 | Cum. | 386 ₹46.5 L | 382 ₹46.0 L |
| 1.05 | Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.) | 1,26,945 | sqm | 135 ₹1.7 Cr | 134.7 ₹1.7 Cr |
| 1.06 | Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade. | 1,26,945 | sqm | 6.46 ₹8.2 L | 6.4 ₹8.1 L |
| 1.07 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
(i) for grading- I Material | 19,041.75 | Cum | 1,946 ₹3.7 Cr | 1,737.6 ₹3.3 Cr |
| 1.08 | Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.) | 24,331.13 | Cum | 2,145 ₹5.2 Cr | 2,342.7 ₹5.7 Cr |
| 1.09 | Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.) | 1,16,366.25 | Sqm | 62 ₹72.1 L | 51.9 ₹60.4 L |
Tender Value
₹49.4 Cr
EMD Value
₹49.4 L
Closing Date
5 Apr 2025, 10:30 amClosed
Executive Engineer, Rumgong Division PWD, Rumgong
Office of the Executive Engineer, Rumgong Division PWD AP, Rumgong PO/PS-Rumgong, District-West Siang, PIN-791001
Improvement of road from Rumgong ADC HQ to NH-13 at Patum (CMCSRDP-II)
2025_PWDAP_2456_1
RUM/CMCSRDP-II/e-NIT/24-25/681
Open Tender
Civil Works – Roads
1825 days
Rumgong ADC HQ to NH-13 at Patum
Please refer Tender documents.
6 documents required · 6 mandatory
₹15,000
EE PWD Rumgong
₹49.4 L
20 May 2025
27 Mar 2025
5 Apr 2025
27 Mar 2025
5 Apr 2025
27 Mar 2025
Amount
Rumgong ADC HQ to NH-13 at Patum
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Manual Means. In area of light jungle.
Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres.
Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres.
Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres
Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.)
Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade.
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (i) for grading- I Material
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.)
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.)
Dense Graded Bituminous Macadam (Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.) (ii) for Grading II (19 mm nominal size)
Tack Coat (Providing and applying tack coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.)
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects) (ii) for Grading-II (13 mm nominal size)
Construction of Sub-grade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2)
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) I. Ordinary Soil (A) Manual Means (i) upto 3 m depth (without de-watering)
II. Ordinary Rock not requiring blasting (A) Manual Means (i) upto 3 m depth (without de-watering)
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) (i) Ordinary Soil (A) Manual Means - Upto 3 m depth (with de-watering)
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification (A) RCC Grade M20 Using Concrete Mixer (i) For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) (i) Ordinary Soil (A) Manual Means - Upto 3 m to 6m depth (with dewatering)
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. (A) PCC Grade M20 Height upto 5m
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (without de-watering)
Stone masonry work in cement mortar 1:3 in Foundation complete as per drawing and Technical Specifications. A)Square Rubble Coursed Rubble Massonry (first sort)
Parapet Wall (Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications) A) PCC Grade M15 (upto height 5m)
Providing and construction of a gabian structure for retaining earth with segments of wire crates of size 7 m x 3 m x 0.6 m each divided into 1.5 m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be tied with 4 mm galvanised steel wire
Direction and Place Identification signs upto 0.9 sqm size board (Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing)
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) (i) Ordinary kilometre stone (precast)
(ii) 5th kilometre stone (precast)
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.)
N M ENTERPRISES (BID ID -7174)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
TenderDoc.pdf
Tender Documents • 3.68 MB
BOQ_2618.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid