Loading…
Loading…
Tender Value
₹36.8 L
EMD Value
₹37,000
Closing Date
4 Jun 2026, 6:00 pmClosed
Executive Engineer, Surendranagar Irrigation Division, Surendranagar
Construction of Kotada Checkdam near village:Kotada Taluka Sayla of Surendranagar District.
307030
03 of 2026-27
Open
Civil Works - Others
Lump-sum
Surendranagar
6 documents required · 5 mandatory · 1 optional
₹1,500
Executive Engineer, Surendranagar Irrigation Division, Surendranagar
₹37,000
20 May 2026
20 May 2026
20 May 2026
4 Jun 2026
20 May 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
SURENDRANAGAR IRRIGATION DIVISION - SURENDRANAGAR
Name of Work : Construction of Kotda Checkdam Near Village Kotda Taluka Sayla Of Surendranagar District.
Memorandum showing Items of Woks to be carried out
Item No Quantities Item of work ESTIMATED RATES Total amount
Item No Quantities Item of work ESTIMATED RATES Total amount
estimated but In words Unit according to
may be more or In Figures estimated
less quantities
Excavation in all sort of strata and formations incl. depositing the unusefull excavated stuffas and where directed incl sorting and Rupees SeventyNine
1(A) 338.00 stacking useful materials as directed up to 200 m. lead and all lifts etc. complete incl. dewatering. (A) IN OVERBURDEN 79.00 Only Cum
INCL. HARD MURRUM.
Rupees One Hundred
1(B) 738.00 (B) IN SOFT ROCK. 176.00 Cum
SeventySix Only
Drilling 25mm dia holes at distance as specified and depth upto 3.0mt for check dam foundation & fixing anchor bars of specified Rupees Two Hundred
2 132.00 diameter with cement grout incl cleaning holes as directed etc.(excluding cost of bars) 252.00 FiftyTwo Only Rmt
Providing,cutting,bending,binding and fixing in position as per drawing .TMT BAR , reinforcement for R.C.C. works and anchor bars Rupees SeventySix
incl cost of black annealed 16 to 18 BWG M.S.. Wire etc.complete with all lead and lift. Thousand Five
(b) Fe-500 Hundred SeventyFour
Prov. & Laying in position cement concrete using cement , sand and crushed metal coarse aggregate by mass and machine mix for PCC/RCC Rupees Three
including necessary formworks compaction by vibrator,curing as directed with all lead & lift etc complete. (Excluding cost of steel ) FOR Thousand Four
4 778.00 .BODY WALL, APRON, TRAINING WALL, SIDE WALL, SPLAY WALL, KEY WALL, CUT OF WALL ETC. 3423.00 Hundred Cum
4/C) Controlled Concrete grade M-15 and MSA-40mm TwentyThree Only
Providing and fixing in position 100/110 mm dia PVC Pipe weep holes in the retaining walls/sidewall/abt etc Rupees Three
5 67.00 358.00 Hundred FiftyEight Rmt
Back filing with appropriate excavated material behind the structures or refiling the trenches with excavated useful material including Rupees EightyFour
6 290.00 watering ramming, consolidation etc complete with all lead and lift.
Providing and laying dry rubble pitching with 20 cm thick gravel/metal and 20 cms sand layers as base of inverted graded filter and without Rupees Seven
7 255.00 header stone but incl.hand packing trimming & dressing of slopes etc complete. 723.00 Hundred Sq Mt
a) 45 cms thick stone pitching TwentyThree Only
Providing and laying graded filters of sand,gravel/metal and over size metal ( 100 to 150 mm) behind the retaining wall & wing walls as Rupees Five Hundred
8 18.00 directed as per approved drawing with all lead and lifts etc complete. 530.00 Thirty Only Cum
Providing and fixing in position white marble plate of size 45x45x1.8 cm incl ingraving the letters as per drawing/as directed etc complete. Rupees One Thousand
9 1.00 1350.00 Three Hundred Fifty No.
In Words Rs. Rupees ThirtySix Lakh EightyTwo Thousand Nine Hundred FiftyTwo Paise SixtyNine Only
I/We am/are willing to carry out the work at % above/ below present (should be written in figures and words)
of the estimated rates mentioned above. An amount of my/our tender works out as under:
* Estimated Amount * Estimated Amount
Put to tender Rs_____________________________ Put to tender Rs_________________
In Words (Rs. ) In Words Rs.( )
(Pease strike out whichever is not applicable)
Note-1: The Contractor shall exhibit a board with brief details of work as directed by the Engineer-In-Charge for which no extra payment shall bemade.
Note-2: Thel abour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note-3: GST and Incometax TDS will be deducted at a source while making payments of bills
Note-4: In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in R.C.C.
items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned
in all the tender.
Executive Engineer
Signature of Contractor. Surendranagar Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Cover Page.pdf
2 E-Tender Notice.pdf
3 Invitation For Bid P 1 to 6.pdf
4 SECTION-1 Instruction to Bidders P 7 to 27.pdf
5 SECTION-2 Qualification Information P 28 to 35.pdf
6 SECTION-3 Conditions of Contract P 36 to 64.pdf
7 SECTION-4 Contract Data P 65 to 74.pdf
8 SECTION-5 to 10 Annexure P75 to 96.pdf
9 Annexure-1 Section-5 tech Spec P 97 to 185.pdf
10 Annexure-2 Sec-7 Bill of Quantities Schedule B.pdf
KOTDA DRAWING.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .