Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.6 LAdmitted-Finance D NO 7 1 332 220KV SUBSTATION ROAD AMBEDKAR CENTER BANDARUGUDEM BHADRADRI KOTHAGUDEM DIST 507117 TELANGANA INDIA | BHADRADRI KOTHAGUDEM | TELANGANA | 507117 | ₹55.6 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s AYESHA CONSTRUCTIONS L1 |
|---|---|---|---|---|
| 1.00Earth work excavation for foundations in all types of soils other than soft and hard rock, back filling in plinth and around foundations with excavated soil in layers not exceeding 150 MM, watering, consolidating including shoring/ strutting, de-watering and disposing off surplus earth within plant premises. etc., all complete as per drawings, specifications and as directed by the Engineer. | ||||
| 1.10 | Up to 1.5 m depth | 110 | Cum | 650 ₹71,500 Lowest |
| 1.20 | Below 1.5 m depth | 82 | Cum | 750 ₹61,500 Lowest |
| 2.00 | Supplying and filling with sand below foundation, including watering,ramming, consolidating and dressing etc. complete as per specifications and as directed by EIC. | 31 | Cum | 2,000 ₹62,000 Lowest |
| 3.00 | Providing and laying Plain cement concrete of 1:3:6[1 cement,3sand 6 stone aggregate] grade, using 40mm and down gauge crushed stone aggregate of approved quality in foundation and plinth, under floors, pavements, footings, pedestals etc. including centering and shuttering, spreading, leveling, ramming, finishing, curing etc. complete as per specifications and as directed by the Engineer-in-charge. | 15 | Cum | 8,500 ₹1,27,500 Lowest |
| 4.00 | Providing and laying WBM with specified stone aggregate of size 63mm to 45mm,(Grade-II) stone screening and blinding material including screening, sorting,spreading to template, watering and consolidation with power road roller of 8 to 10 tonne capacity etc., complete as per specifications, drawings, and as directed by the Engineer. | 15 | Cum | 3,000 ₹45,000 Lowest |
| 5.00Providing and laying in position specified grade of reinforced cement concrete,1:1.5:3 (1 cement : 1.5 coarse sand (zone-II) : 3 graded stone aggregate 20 mm nominal size). make of ACC/ULTRATECH/BIRLA/JAYPEE cement grade of OPC-43, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete, laying at site, spreading and compacting mechanically by using needle and surface vibrator, curing by hassien cloth, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge. The cement consumption for this item is 360Kg/Cum. In addition to the cement the agency has to add 40Kg of fly ash per Cum of concrete. The total cementitious content will be 400kg/Cum. Ash from field No2 of boiler in CPP of HWPM will be issued free of cost to the contractor. It will be the sole responsbility of the contractor to match the property of fly ash to Grade I of IS 3812 before being used in the works. the rate for concrete shall also include taking delivery of ash from CPP HWPM, transportation of fly ash to work site, processing the fly ash to specified grading, mixing the fly ash with cement etc.free of cost. It is the sole responsibility of the agency to transport the fly ash field no.2 of Boiler in CPP site. Processing the fly ash to specified grading. mixing the fly ash wtih cement etc. | ||||
| 5.10 | Upto a plinth level | 34 | Cum | 10,500 ₹3,57,000 Lowest |
| 5.20 | Above plinth level | 70 | Cum | 12,000 ₹8,40,000 Lowest |
| 6.00Centering and shuttering including strutting, Propping etc, and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc., with water proof ply 12 mm thick complete as per specifications and as directed by the Engineer in Charge. | ||||
Tender Value
₹51.5 L
EMD Value
₹1.0 L
Closing Date
9 Apr 2026, 6:00 pmClosed
GENERAL MANAGER
O/o GM HWPM BHADRADRI KOTHAGUDEM DIST TELANGANA 507116
Providing Elevated Morcha near East Gate and Watch Tower near Coal Handling Plant (CHP) at HWPM.
2026_HWB_902826_1
HWPM/CIVIL/CPP/NIT/2025/33 (2nd Call)
Open Tender
Civil Works
Item Rate
270 days
HWPM
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.0 L
9 Jul 2026
20 Mar 2026
17 Apr 2026
20 Mar 2026
9 Apr 2026
20 Mar 2026
20 Mar 2026 - 30 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work excavation for foundations in all types of soils other than soft and hard rock, back filling in plinth and around foundations with excavated soil in layers not exceeding 150 MM, watering, consolidating including shoring/ strutting, de-watering and disposing off surplus earth within plant premises. etc., all complete as per drawings, specifications and as directed by the Engineer. | |||||
| 1.1 | Up to 1.5 m depth | - | Cum | - | - |
| 1.2 | Below 1.5 m depth | - | Cum | - | - |
| 2Supplying and filling with sand below foundation, including watering,ramming, consolidating and dressing etc. complete as per specifications and as directed by EIC. | |||||
| 3Providing and laying Plain cement concrete of 1:3:6[1 cement,3sand 6 stone aggregate] grade, using 40mm and down gauge crushed stone aggregate of approved quality in foundation and plinth, under floors, pavements, footings, pedestals etc. including centering and shuttering, spreading, leveling, ramming, finishing, curing etc. complete as per specifications and as directed by the Engineer-in-charge. | |||||
| 4Providing and laying WBM with specified stone aggregate of size 63mm to 45mm,(Grade-II) stone screening and blinding material including screening, sorting,spreading to template, watering and consolidation with power road roller of 8 to 10 tonne capacity etc., complete as per specifications, drawings, and as directed by the Engineer. | |||||
| 5Providing and laying in position specified grade of reinforced cement concrete,1:1.5:3 (1 cement : 1.5 coarse sand (zone-II) : 3 graded stone aggregate 20 mm nominal size). make of ACC/ULTRATECH/BIRLA/JAYPEE cement grade of OPC-43, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete, laying at site, spreading and compacting mechanically by using needle and surface vibrator, curing by hassien cloth, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge. The cement consumption for this item is 360Kg/Cum. In addition to the cement the agency has to add 40Kg of fly ash per Cum of concrete. The total cementitious content will be 400kg/Cum. Ash from field No2 of boiler in CPP of HWPM will be issued free of cost to the contractor. It will be the sole responsbility of the contractor to match the property of fly ash to Grade I of IS 3812 before being used in the works. the rate for concrete shall also include taking delivery of ash from CPP HWPM, transportation of fly ash to work site, processing the fly ash to specified grading, mixing the fly ash with cement etc.free of cost. It is the sole responsibility of the agency to transport the fly ash field no.2 of Boiler in CPP site. Processing the fly ash to specified grading. mixing the fly ash wtih cement etc. | |||||
| 5.1 | Upto a plinth level | - | Cum | - | - |
| 5.2 | Above plinth level | - | Cum | - | - |
| 6Centering and shuttering including strutting, Propping etc, and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc., with water proof ply 12 mm thick complete as per specifications and as directed by the Engineer in Charge. | |||||
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.83 MB
TU.pdf
Tender Documents • 0.14 MB
ANNEXUREXI.pdf
Additional Documents • 0.09 MB
AERBSAFETYGUIDE.pdf
Tender Documents • 0.23 MB
TechnicalBids2025332ndcall.xls
Tender Documents • 0.90 MB
TD2025332NDCALL.pdf
Tender Documents • 7.68 MB
GCCMaintenanceWorks2023.pdf
Tender Documents • 24.43 MB
BOQ_948927.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .