Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.1 LAccepted-AOC | ₹5.1 L | 1 | Accepted-AOC Lowest |
Tender Value
₹5.1 L
EMD Value
₹12,800
Closing Date
6 Mar 2026, 6:40 pmClosed
EXECUTIVE ENGINEER, TDB, MAVELIKKARA
OFFICE OF THE EXECUTIVE ENGINEER, TDB, MAVELIKKARA-690101
Panyannarkavu Devaswom in Ambalappuzha group- Pucca maintenance to the temple structure and certain urgent work in connection with Mandalam Makaravilakku festival in 1201 ME RETENDER
2026_TDB_841250_2
EEM/ET-150/2025-26
Open Tender
Repair and Maintenance Works
Percentage
30 days
Mavelikkara
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,239
₹12,800
18 Jul 2026
3 Mar 2026
7 Mar 2026
3 Mar 2026
6 Mar 2026
3 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix I - | |||||
| 1.01 | Labour for clearing the site including cutting jungle around pond | 4 | Each | 1,082.18 | ₹4,328.72 |
| 1.02 | Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 24 | hour | 345.54 | ₹8,292.96 |
| 1.03 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) | 19.2 | M2 | 579.74 | ₹11,131.01 |
| 1.04 | water washing and cleaning the old painted surface with pressure pump including hire charges of pump etc complete | 1,000 | M2 | 6.23 | ₹6,230 |
| 1.05 | Dismantling and removing manglore tiles over roofs including ridges,hips,valley sheet,wind ties and boardering but excluding roof timbers and stacking materials with in a distance of 150 m | 354.24 | M2 | 54.11 | ₹19,167.93 |
| 1.06 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area below 40 square centimeters | 250 | Metre | 18.42 | ₹4,605 |
| 1.07 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above | 0.77 | M3 | 4,607.85 | ₹3,529.61 |
| 1.08 | Supplying Anjily wood wrought and put up for roof members. | 0.27 | M3 | 85,370.25 | ₹22,708.49 |
| 1.09 | Supplying and fixing Dept. wood wrought and put up for roof members including cost and conveyance of materials etc. complete. | 0.77 | M3 | 9,940.49 | ₹7,614.42 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
22ndtender.pdf
Tender Documents • 0.59 MB
priliminaryagreement.pdf
Tender Documents • 0.32 MB
BOQ_1423246.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].