Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.0 LAccepted-AOC | L1 | Accepted-AOC Only one bidder participated on retender |
Tender Value
₹32.0 L
EMD Value
₹50,000
Closing Date
22 Feb 2020, 6:00 pmClosed
Executive EngineerInland Navigation Division Kolla
Inlanland Navigation Division Kollam
CSIND Rennovation of boat jetties at Thanni Mukkom Eravipuram and Mundakkal boat jetty and foot bridges across Kollam thodu in Eravipuaram constituency
2020_Irrig_338074_2
8/EE/2019-20
Open Tender
Civil Works - Others
Item Rate
120 days
Eravipuram
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,115
online
₹50,000
Yes
12 Nov 2020
12 Feb 2020
27 Feb 2020
12 Feb 2020
22 Feb 2020
12 Feb 2020
Amount
Description
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers etc. as per the direction of Engineer-in-charge
15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size etc. as per the direction of Engineer-in-charge
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform etc. as per the direction of Engineer-in-charge
5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).etc. as per the direction of Engineer-in-charge
10.26.1 : Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer.M.S. tube etc. as per the direction of Engineer-in-charge
13.7.1 : 12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) etc. as per the direction of Engineer-in-charge
13.72 : Washed stone grit plaster on exterior walls height upto 10 metre above ground level, in two layers, under layer 12 mm cement plaster 1:4 ( 1 cement : 4 coarse sand), furrowing the under layer with scratching tool, applying cement slurry on the under layer @ 2 kg of cement per square metre, top layer 15 mm cement plaster 1:1/2:2 ( 1 cement : 1/2 coarse sand : 2 stone chipping 10 mm nominal size), in panels with groove all around as per approved pattern including scrubbing and washing the top layer with brushes and water to expose the stone chippings, complete as per specification and direction of Engineer-in-charge (payment for providing grooves shall be made separately).
13.43.1 : Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer etc. as per the direction of Engineer-in-charge
13.65.1 : Painting with black anti- corrosive bitumastic paint of approved brand and manufacture to give an even shade:Two or more coats on new work etc. as per the direction of Engineer-in-charge
13.51.1 : Painting with silicon & acrylic emulsion based water thinnable sealer of approved brand and manufacture on wet or patchy portion of plastered surfaces:One coatetc. as per the direction of Engineer-in-charge
13.52.2 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work etc. as per the direction of Engineer-in-charge
13.70 : Floor polishing on masonry or concrete floors with wax polish of approved brand and manufacture etc. as per the direction of Engineer-in-charge
8.2.2.1 : Providing and fixing 18 mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.Granite of any colour and shadeArea of slab upto 0.50 sqm etc. as per the direction of Engineer-in-charge
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more etc. as per the direction of Engineer-in-charge
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)etc. as per the direction of Engineer-in-charge
8.3.2 : Providing edge moulding to 18 mm thick marble stone counters, vanities etc., including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer -in-Charge.Granite work
13.60.1 : Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work etc. as per the direction of Engineer-in-charge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil etc. as per the direction of Engineer-in-charge
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size)etc. as per the direction of Engineer-in-charge
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at siteetc. as per the direction of Engineer-in-charge
60.7.6 : Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45dm3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc.etc. as per the direction of Engineer-in-charge
60.7.7 : Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45dm3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to form the core of the sea wall as per approved design including all leads and lifts etc. as per the direction of Engineer-in-charge
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc. as per the direction of Engineer-in-charge
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)etc. as per the direction of Engineer-in-charge
4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. as per the direction of Engineer-in-charge.
od41824/2019_2020/IA : Earthwork in excavation in under water by mechanical means (Hydraulic excavator with pontoon) over areas in front of boat jetty (exceeding 30cm depth up to 2.5m depth)including disposal off excavated earth /or clay sufficiently away from the boat route channel and spreading uniformly in low lying area in the back water not exceeding 15cm thickness etc. as per the direction of Engineer-in-charge .
60.64.1 : Coconut Pile - Supplying and stacking well matured straight coconut post for driving down through various strata below bed level including cost coveyance labour charges etc. as per the direction of Engineer-in-charge
60.64.4 : Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end etc. as per the direction of Engineer-in-charge
60.64.6 : Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150m etc. as per the direction of Engineer-in-charge
14.72 : Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story height made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
od54864/2019_2020/IA : RING BUND type-1 putting up ring bund as per approved shape 2.5m bottom width,1m top width using empty gunny/polythene bags fiiled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete (as per 60.1.1 of DSR)etc. as per the direction of Engineer-in-charge
13.48.1 : Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm etc. as per the direction of Engineer-in-charge
11.20.1 : Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Light shade pigment using white cement etc. as per the direction of Engineer-in-charge
12.20 : Providing and laying pressed clay tiles ( as per approved pattern 20 mm nominal thickness of approved size) on roofs jointed with cement mortar 1:4 (1 cement : 4 coarse sand mixed with 2% integral water proofing compound, laid over a bed of 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand) and finished neat complete. as per the direction of Engineer-in-charge
od57634/2019_2020/IA : O.D for 10 spots. Cutting off the left reinforcement which protrudes from existing R.C.C and make good the area using epoxy repair mortor as per the direction of the departmental Engineer etc. as per the direction of Engineer-in-charge
od57635/2019_2020/IA : Removal of rust from steel reinforcement of existing old R.C.C structures at the locations where concrete cover to reinforcement got peeled of due to debonding including clearing of all loose concrete by suitable means, make good the area using epoxy two component mortar of Dr.Fixit damp guard brand or equivalent, all man power, tools and plants as required etc. as per the direction of Engineer-in-charge
Bidder Name
T AJAYAKUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_479775.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .