Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.4 L+₹9,438.61 (1.29%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | ANIYAN PILLAI A S L2 | A S RAJANPILLAI L1 |
|---|---|---|---|---|---|
| 1.00Detailed Estimate | |||||
| 1.00 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 118.26 | sqm | 65 ₹7,686.97 | 56.51 ₹6,682.93 Lowest |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 0.61 | cum | 2,900 ₹1,763.2 | 2,129.84 ₹1,294.94 Lowest |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.18 | cum | 3,999 ₹719.82 | 3,671.89 ₹660.94 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 7.84 | cum | 650 ₹5,096 | 359.72 ₹2,820.2 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.72 | cum | 8,500 ₹6,120 | 7,932.89 ₹5,711.68 Lowest |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 4.32 | cum | 8,343.49 ₹36,043.88 Lowest | 8,343.49 ₹36,043.88 Lowest |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 10.2 | cum | 318.47 ₹3,248.39 Lowest | 318.47 ₹3,248.39 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.7 | cum | 9,235.97 ₹15,701.15 Lowest | 9,235.97 ₹15,701.15 Lowest |
| 1.01 | 50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 5.16 | cum | 7,279.03 ₹37,559.79 Lowest | 7,279.03 ₹37,559.79 Lowest |
Tender Value
₹7.4 L
EMD Value
₹18,432
Closing Date
10 Sept 2025, 3:00 pmClosed
Assistant Executive Engineer
PWD Buildings Subdivision Thiruvalla
GENERAL Police Quarters Thiruvalla Maintenance works to police quarters no 12 General Civil Work
2025_PWD_792614_1
PWD/BLDG/TR/10725/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
150 days
Thiruvalla
Please refer tender documents
10 documents required · 10 mandatory
₹1,630
₹18,432
18 Oct 2025
29 Aug 2025
12 Sept 2025
29 Aug 2025
10 Sept 2025
29 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1308013.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .