Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.2 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹5.5 L+₹27,550.28 (5.31%)Accepted-Finance | 2 | Accepted-Finance L2 | |
| 3 | 3₹5.7 L+₹47,947.97 (9.24%)Rejected-Finance | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | KUNHIMOIDEENKUTTY L1 | MUHAMED FAHIS M L3 | ABDUL BASITH KT L2 |
|---|---|---|---|---|---|---|
| 1.00 | 15.57:Dismantling aluminium / Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by Engineer - in-Charge | 5.43 | sqm | 50 ₹271.75 Lowest | 53.59 ₹291.26 | 51.66 ₹280.77 |
| 2.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 3.14 | cum | 3,000 ₹9,420 Lowest | 3,372.7 ₹10,590.28 | 3,251.28 ₹10,209.02 |
| 3.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 0.75 | cum | 1,400 ₹1,047.2 | 1,427.77 ₹1,067.97 | 1,376.37 ₹1,029.52 Lowest |
| 4.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 1.82 | cum | 2,250 ₹4,095 Lowest | 2,334.88 ₹4,249.48 | 2,250.82 ₹4,096.49 |
| 5.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 3.16 | cum | 1,850 ₹5,838.6 Lowest | 1,956.3 ₹6,174.08 | 1,885.87 ₹5,951.81 |
| 6.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 10 | cum | 330 ₹3,300 | 330.41 ₹3,304.1 | 318.52 ₹3,185.2 Lowest |
| 7.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.6 | cum | 6,700 ₹17,420 Lowest | 7,286.51 ₹18,944.93 | 7,024.2 ₹18,262.92 |
| 8.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 10.2 | cum | 6,300 ₹64,260 Lowest | 7,663.65 ₹78,169.23 | 7,387.76 ₹75,355.15 |
| 9.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.3 | cum | 9,500 ₹12,350 | 9,634.13 ₹12,524.37 | 9,287.3 ₹12,073.49 Lowest |
| 10.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 8 | sqm | 700 ₹5,600 | 700.72 ₹5,605.76 | 675.49 ₹5,403.92 Lowest |
Tender Value
₹5.7 L
EMD Value
₹14,165
Closing Date
26 Sept 2026, 6:00 pmClosed
Executive Engineer (Civil)
Office of the Executive Engineer (Civil) Engineering Department University of Calicut Calicut University P O Malappuram District Kerala 673635
Construction of security cabin and providing new gate for Pareeksha bhavan
2026_UoC_870952_1
D2/816/2026
Open Tender
Civil Works - Buildings
Item Rate
90 days
Calicut University Campus Thenjippalam
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,475
Yes
₹14,165
Yes
29 Sept 2026
18 Sept 2026
28 Sept 2026
18 Sept 2026
26 Sept 2026
18 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 15.57:Dismantling aluminium / Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 metres lead as directed by Engineer - in-Charge | 5.44 | sqm | - | - |
| 2 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 3.14 | cum | - | - |
| 3 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 0.75 | cum | - | - |
| 4 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 1.82 | cum | - | - |
| 5 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 3.16 | cum | - | - |
| 6 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 10 | cum | - | - |
| 7 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.6 | cum | - | - |
| 8 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 10.2 | cum | - | - |
| 9 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.3 | cum | - | - |
| 10 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 8 | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1475997.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.64 MB
DRAWING.pdf
Additional Documents • 0.07 MB
epaymentform.pdf
Additional Documents • 0.01 MB
Formoftender.pdf
Additional Documents • 0.21 MB
Integritypactcertificate.pdf
Additional Documents • 0.19 MB
Affidavit.pdf
Additional Documents • 0.20 MB
TENDERDOCUSECURITYCABINPB.pdf
Tender Documents • 1.48 MB
BOQ_1475997.xls
BOQ • 0.30 MB
PreliminaryAgreement.pdf
Additional Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .