Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹41,000
Closing Date
24 Apr 2020, 6:55 pmClosed
Executive Engineer Mech. Irrig. Div. Baramulla
Mech. Irrig. Div. Baramulla
IMPROVEMENT/RESTORATION OF HT LINE AT VARIOUS LIFT IRRIGATION SCHEMES OF SUB-DIVISION PATTAN.
2020_IFC_95846_1
eNIT 02 of 2020-21
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Pattan
Please refer Tender documents.
4 documents required · 4 mandatory
₹100
Yes
Executive Engineer Mech. Irrig. Div. Baramulla
Yes
Mech. Irrig. Div. Baramulla
4 May 2020
18 Apr 2020
25 Apr 2020
18 Apr 2020
24 Apr 2020
18 Apr 2020
22 Apr 2020
Amount
Sohkhul Goshbugh Realigning and erection of 09 m tilted steel tubular poles tilted during heavy snowfall by way of excavation of pit and back filling of soil and consolidating each deposit layer by ramming and watering etc. The job also includes tightening of drooped ACSR conductor. The job includes cost of engagement of skilled labour for execution of job at site.
Relocation of existing H-frame to new site of installation within premises at distance of 05 m by way of dismantling HT Gadgets after lowering of HT/LT transformer and channel from steel tubular poles. Then Extraction of 02 no. HT poles from ground and shifting to new installation site. Installation of these 02 no. ST poles at new site by way of earth excavation, cement bottoming 2.5 feet below ground, one feet above ground with 1.5 feet dia excluding pole dia in M15 grade cement concrete mix using 40 mm crush stone aggregate 0.08 cum per pole including shuttering, stone soling, curing etc. Reassembling of HT gadgets including link set, drop out set, disc insulators etc after fitment of channels on poles for fabrication of H frame. Raising of 100 KVA HT/LT transformer and resting on channels. The job includes hire charges on account of carriage of material, skilled, non-skilled labour, various tools and tackles required for execution of job at site.
Providing, fitting of 11 KV HT pin insulators with nuts to be fitted on cross arms
Providing fitting of ISMC 75 channel 9 feet long for replacing damaged (by snowfall) H-frame at top housing HT disc insulators. The job includes cost of drilling holes, nuts and bolts etc for completion of job.
Providing, fitting of 0.03 ACSR conductor.
Goshbugh old Realigning and erection of 09 m tilted steel tubular poles tilted during heavy snowfall by way of excavation of pit and back filling of soil and consolidating each deposit layer by ramming and watering etc. The job also includes tightening of drooped ACSR conductor. The job includes cost of engagement of skilled labour for execution of job at site.
Providing, fitting of 11 KV HT pin insulators with nuts to be fitted on cross arms
Providing, fitting of 0.03 ACSR conductor.
ASIF ENGINEERING WORKS AZAD GUNJ BARAMULLA
M/s SAJAD ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .