Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹27.9 L
EMD Value
₹49,500
Closing Date
16 Jan 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
O/o District Project Manager, HPCDP (Phase-II), JI
O/o District Project Manager, HPCDP (Phase-II), JICA-ODA, Mandi Distt. Mandi (H.P.). Agriculture Complex Khaliyar Mandi Distt. Mandi (H.P).
C/o Flow Irrigation Scheme, Chater Nallah to Chakli Kuhal,Village Sukad, G.P. Sagnehar, Tehsil Jogindernagar District Mandi (H.P.)
2026_HPCDP_125233_1
F(5)-121/2025-3242dt07.01.2026
Open Tender
Civil Works - Water Works
Item Rate
365 days
Village Sukad, G.P. Sagnehar, Tehsil Jogindernagar
Please refer Tender documents.
16 documents required · 16 mandatory
₹1,500
₹49,500
O/o District Project Manager, HPCDP (Phase-II), JI
7 Jan 2026
7 Jan 2026
17 Jan 2026
7 Jan 2026
16 Jan 2026
7 Jan 2026
13 Jan 2026
Demolishing of cement concrete manually/ by mechanical means including disposal of material within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation, trenches or drains, pits upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing and pumping out water, chieselling soft / hard rock including getting out the excavated soil, dressing of sides, ramming of bottoms and returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and then disposing of surplus excavated soil as directed, within all leads and lifts complete in all respect and to the entire satisfaction of the Engineer-in-Charge.
Foundations, footings, bases for columns, mass concrete complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
Suspended floor , roofs , landing , balconies and access plateform etc.complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
Edges of slab and break in floor and walls complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Bed complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
In sides complete in all respect within all leads and lifts and to the entire satisfaction of the engineer-in-charge.
Providing and laying in position cement concrete 1:4:8 (1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete excluding the cost of centering and shuttering complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Providing and laying in position cement concrete 1:3:6 (1 Cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centering , shuttering in All work up to plinth level, complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
All work up to plinth level excluding the cost of centering, shuttering & reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
In retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed, bkocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering & finishing cpmplete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
All work up to plinth level excluding the cost of centering, shuttering & reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level upto all level, excluding the cost of centering, shuttering and reinforcement complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Bed complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Side slopes complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Providing and Laying Stone/ Boulder filling behind the Retaining wall , also under floor and upstream of i/ gallery/ under floor etc.complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Providing Mild steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
150 mm dia, PN-1.0 (10.2 Kg/cm²)
Providing, laying, jointing , commissioning and testing in trenches (to level or grade) GMS tubes confirming to IS : 1239: 2004 of 150 mm dia, medium class with all necessary fittings conforming to IS specification capable to withstand the required hydraulic test pressure as per IS code in random length of 6.00 mtrs. including flushing , cleaning and hydraulic testing of pipe complete in all respect within all leads and lifts and to the entire satisfaction of Engineer-in-Charge.
Cutting of MS Plate permanent engraving marked scale/calibration on the plate and fixed at the site of work.
Writing new letters and figures of any shade with synthetic enamel black or any other approved colour to give an even shade as per drawings and technical specifications clause 1701 in English and roman, hyphen, commas and the like not to be measured and paid complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Finishing with epoxy paint (two or more coats) at all locations prepared on steel work and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete in all respect within all leads and lifts and to the entire satisfaction of the Engineer-in-Charge.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.10 MB
BidDocumentChatterNallah.pdf
Tender Documents • 1.51 MB
BOQ_184410.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .