Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical TC 4 1315 VYSAKH SREEVILAS G LANE KOWDIAR PO THIRUVANANTHAPURAM KERALA THIRUVANANTHAPURAM KERALA 695003 INDIA | THIRUVANANTHAPURAM | KERALA | 695003 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Sainath Enviro Tech L1 |
|---|---|---|---|---|
| 1.00FSTP ON BDOT BASIS | ||||
| 1.01 | DPR Preparation Civil Constructions Procurement Supply Fabrication Instalation and Commissioning | 1 | Nos | 2,05,00,000 ₹2,05,00,000 Lowest |
| 1.02 | Maintenance for 1st year post commissioning after warranty | 1 | Nos | 14,37,500 ₹14,37,500 Lowest |
| 1.03 | Maintenance for 2nd year post commissioning after warranty | 1 | Nos | 15,50,000 ₹15,50,000 Lowest |
| 1.04 | Maintenance for 3rd year post commissioning after warranty | 1 | Nos | 16,62,500 ₹16,62,500 Lowest |
| 1.05 | Maintenance for 4th year post commissioning after warranty | 1 | Nos | 17,75,000 ₹17,75,000 Lowest |
| 1.06 | Maintenance for 5th year post commissioning after warranty | 1 | Nos | 18,66,250 ₹18,66,250 Lowest |
Tender Value
₹2.6 Cr
EMD Value
₹1 L
Closing Date
12 Sept 2025, 6:00 pmClosed
ASSI.EXECUTIVE ENGINEER
Assistant Executive Engineer LSGD Division Idukki Painavu
Design Build Operation And Maintenance of 20 KLD Fecal Sludge Treatment Plant at Kuyilimala in Vazhathope Gramapanchayath E-QUOTATION
2025_LSGD_790941_1
05/T/AEE/LIDEW/IDK/2025-26
Open Tender
Civil Works - Others
Item Rate
270 days
vazhathopu
Please refer Tender documents.
11 documents required · 11 mandatory
₹8,720
Yes
₹1 L
Yes
LSGD Division Idukki Painavu
21 Oct 2025
27 Aug 2025
16 Sept 2025
27 Aug 2025
12 Sept 2025
27 Aug 2025
27 Aug 2025 - 12 Sept 2025
10 Sept 2025
Amount
FSTP ON BDOT BASIS
DPR Preparation Civil Constructions Procurement Supply Fabrication Instalation and Commissioning
Maintenance for 1st year post commissioning after warranty
Maintenance for 2nd year post commissioning after warranty
Maintenance for 3rd year post commissioning after warranty
Maintenance for 4th year post commissioning after warranty
Maintenance for 5th year post commissioning after warranty
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.10 MB
01SBD.pdf
Tender Documents • 2.33 MB
FSTP.pdf
Other Document • 2.09 MB
BOQ_1303872.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .