Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-Finance AT UPPER KULI JHARIA P O JHARIA DIST DHANBAD | JHARIA | DHANBAD | ₹1.2 L | L1 | Accepted-Finance BEING L1 |
| 2 | L2₹1.2 LRejected-Finance H NO 47 GANDHI NAGAR DHANSAR NEAR BHATIA BUILDING SHIV MANDIR DHANBAD DHANBAD 826001 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 826001 | ₹1.2 L | L2 | Rejected-Finance NOT BEING L1 |
| 3 | L3₹1.2 LRejected-Finance DHANBAD JHARKHAND 828111 INDIA | DHANBAD | DHANBAD | JHARKHAND | 828111 | ₹1.2 L | L3 | Rejected-Finance NOT BEING L1 |
| Sl No | Description | Qty | Unit | S K AUTOMOBILE L1 | SHRI DURGA AUTOMOBILES L2 | Q-TECH SALES AND SERVICE L3 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 1.01 | Jobs to be done:
DESCRIPTION OF WORK:
(A) JOBS TO BE DONE :-
SL.
NO. DESCRIPTION QNTY.
1- Front Both Side Wheel Hub Complete Dismantling & Bearing Gressing, Fitting. 2 Sets.
2- Front Both Side Wheel Brake Drum Complete Refacing. 2 Nos.
3- Front Both Side Wheel Brake Shoe Lining Removing and Changing, Fitting. 8 Nos.
4- Front Both Side Wheel Hub Welding, Repairing, Making Bearing Size, Oil Seal Size by Suitable Electrodes. 2 Nos.
5- Brake Servo Complete Dismantling, Overhauling, Fitting. 1 No.
6- Brake Servo Body Complete Refacing. 1 No.
7- Brake PU. Tube Assly. Removing, Fitting. 1 No.
8- Brake Adapter Removing, Repairing and Fitting. 2 Nos.
9- Brake Master Cylinder Distributer T. Removing, Repairing, Fitting. 1 No.
10- Brake Master Cylinder Bundy Tube Removing Repairing, Fitting. 1 No.
11- Brake Master Cylinder Complete Removing and Changing, Fitting. 1 No.
12- Brake Tradle Valve Overhauling Removing Fitting. 1 No.
13- Brake Unloader Valve Overhauling, Removing Fitting. 1 No.
14- Complete Air Compressor Dismantling, Fitting. 1 No.
15- Air Compressor Cylinder Block, Cylinder Head, Piston with Ring & Kit Removing & Changing, Fitting. 1 Set.
16- Accelerator Cable Complete Removing and Changing, Fitting. 1 Set.
17- Diesel Mobile, Hydraulic Filter Removing Changing & Fitting. 1 Set.
18- Diesel Tank Nalki, Stop Cable Brake Oil Container Removing & Changing, Fitting. 1 Set.
19- Silancer Box & Pipe Complete Removing & Welding, Repairing, Fitting. 1 Set.
20- Hours Meter Repairing Removing Fitting. 1 No.
21- Stop Cable Removing & Changing, Fitting. 1 No.
22- Manifold Gasket Removing & Changing, Fitting. 1 No.
23- Accelerator Cable Complete Removing & Changing, Fitting. 1 No.
24- Engine Water Pump Assly. Removing & Changing, Fitting. 1 No.
(B) MATERIALS required :-
SL.
NO. DESCRIPTION QNTY.
1- Front Wheel Brake Lining with Revit. 8 Sets.
2- Front Wheel Cylinder Assly. 2 Nos.
3- Front Wheel Oil Seal. 2 Nos.
4- Front Wheel Bearing Big. 1 No.
5- Front Wheel Bearing Small. 1 No.
6- Front Wheel Brake Adjuster. 4 Nos.
7- Front Wheel Hub Stud. 6 Nos.
8- Front Wheel Brake Hose. 2 Nos.
9- Brake Servo Repair Kit. 1 Set.
10- Brake Master Cylinder Assly. 1 No.
11- Brake Unloader Valve Repair Kit. 1 Set.
12- Brake Tradle Valve Repair Kit. 1 Set.
13- Brake Pipe. 2 Nos.
14- Diesel Tank Nalki. 1 No.
15- Brake Oil Container. 1 No.
16- Stop Cable. 1 Set.
17- Air Compressure Cylinder Block. 1 No.
18- Air Compressure Repair Kit. 1 Set.
19- Air Compressure Connecting Rod with Cap. 1 Set.
20- Air Compressure Bearing. 1 Set.
21- Air Compressure Bolt Nut. 4 Nos.
22- Air Compressure Piston with Ring. 1 Set.
23- Diesel & Mobile with Hydraulic Filter Kit. 1 Set.
24- Accelerator Cable. 1 Set.
25- Manifold Gasket. 1 No.
26- Stop Cable. 1 No.
27- Engine Water Pump Assly. 1 No.
28- Radiator Hose Kit. 1 Set.
29- Cotton Pieces. 2 Nos.
Repairing work should be completed with all required materials and manpower. | 1 | Nos | 1,19,767 ₹1.2 L | 1,21,700 ₹1.2 L | 1,23,950 ₹1.2 L |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹1.2 L
EMD Value
₹1,497
Closing Date
11 May 2026, 11:00 amClosed
GENERAL MANAGER EXCAVATION KUSUNDA AREA
OFFICE OF THE GM KUSUNDA AREA VI
Repairing of ACE Crane Jh10BB 5692 like complete brake system overhauling, repairing brake unloader valve, Tradle valve, Servo master cylinder, repairing, fitting, front wheel brake linging, wheel cylinder, seal requires replacement fitting and engin
2026_BCCL_358892_1
BCCL/KA-VI/EXC/E-TEN/26-27/10
Open Tender
Excavation Department Work
8 days
DOCP KUSAUNDA AREA VI
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,497
Yes
19 May 2026
29 Apr 2026
12 May 2026
29 Apr 2026
11 May 2026
29 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Item Description/ Heading | ||||||
| 1.01 | Jobs to be done:
DESCRIPTION OF WORK:
(A) JOBS TO BE DONE :-
SL.
NO. DESCRIPTION QNTY.
1- Front Both Side Wheel Hub Complete Dismantling & Bearing Gressing, Fitting. 2 Sets.
2- Front Both Side Wheel Brake Drum Complete Refacing. 2 Nos.
3- Front Both Side Wheel Brake Shoe Lining Removing and Changing, Fitting. 8 Nos.
4- Front Both Side Wheel Hub Welding, Repairing, Making Bearing Size, Oil Seal Size by Suitable Electrodes. 2 Nos.
5- Brake Servo Complete Dismantling, Overhauling, Fitting. 1 No.
6- Brake Servo Body Complete Refacing. 1 No.
7- Brake PU. Tube Assly. Removing, Fitting. 1 No.
8- Brake Adapter Removing, Repairing and Fitting. 2 Nos.
9- Brake Master Cylinder Distributer T. Removing, Repairing, Fitting. 1 No.
10- Brake Master Cylinder Bundy Tube Removing Repairing, Fitting. 1 No.
11- Brake Master Cylinder Complete Removing and Changing, Fitting. 1 No.
12- Brake Tradle Valve Overhauling Removing Fitting. 1 No.
13- Brake Unloader Valve Overhauling, Removing Fitting. 1 No.
14- Complete Air Compressor Dismantling, Fitting. 1 No.
15- Air Compressor Cylinder Block, Cylinder Head, Piston with Ring & Kit Removing & Changing, Fitting. 1 Set.
16- Accelerator Cable Complete Removing and Changing, Fitting. 1 Set.
17- Diesel Mobile, Hydraulic Filter Removing Changing & Fitting. 1 Set.
18- Diesel Tank Nalki, Stop Cable Brake Oil Container Removing & Changing, Fitting. 1 Set.
19- Silancer Box & Pipe Complete Removing & Welding, Repairing, Fitting. 1 Set.
20- Hours Meter Repairing Removing Fitting. 1 No.
21- Stop Cable Removing & Changing, Fitting. 1 No.
22- Manifold Gasket Removing & Changing, Fitting. 1 No.
23- Accelerator Cable Complete Removing & Changing, Fitting. 1 No.
24- Engine Water Pump Assly. Removing & Changing, Fitting. 1 No.
(B) MATERIALS required :-
SL.
NO. DESCRIPTION QNTY.
1- Front Wheel Brake Lining with Revit. 8 Sets.
2- Front Wheel Cylinder Assly. 2 Nos.
3- Front Wheel Oil Seal. 2 Nos.
4- Front Wheel Bearing Big. 1 No.
5- Front Wheel Bearing Small. 1 No.
6- Front Wheel Brake Adjuster. 4 Nos.
7- Front Wheel Hub Stud. 6 Nos.
8- Front Wheel Brake Hose. 2 Nos.
9- Brake Servo Repair Kit. 1 Set.
10- Brake Master Cylinder Assly. 1 No.
11- Brake Unloader Valve Repair Kit. 1 Set.
12- Brake Tradle Valve Repair Kit. 1 Set.
13- Brake Pipe. 2 Nos.
14- Diesel Tank Nalki. 1 No.
15- Brake Oil Container. 1 No.
16- Stop Cable. 1 Set.
17- Air Compressure Cylinder Block. 1 No.
18- Air Compressure Repair Kit. 1 Set.
19- Air Compressure Connecting Rod with Cap. 1 Set.
20- Air Compressure Bearing. 1 Set.
21- Air Compressure Bolt Nut. 4 Nos.
22- Air Compressure Piston with Ring. 1 Set.
23- Diesel & Mobile with Hydraulic Filter Kit. 1 Set.
24- Accelerator Cable. 1 Set.
25- Manifold Gasket. 1 No.
26- Stop Cable. 1 No.
27- Engine Water Pump Assly. 1 No.
28- Radiator Hose Kit. 1 Set.
29- Cotton Pieces. 2 Nos.
Repairing work should be completed with all required materials and manpower. | - | Nos | 1,19,767 | - | BI01010001010000000000000515BI0100001113 |
| 7Total impact of GST for the purpose of CTC | ||||||
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_371760.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_371760.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid