| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC INATHPUR HOUSE NO 263 CITY TOWN KARIMGANJ P O AMBARKHANA P S KARIMGANJ DISTRICT KARIMGANJ DISTRICT KARIMGANJ PIN 78812 | 78812 | ₹3.5 Cr | L1 | Accepted-AOC Being the lowest bidder |
| 2 | L2₹3.5 CrRejected-AOC MOHANPUR PT II HOUSE NO 00 CITY TOWN KATIGORAH P O KATIRAIL P S KATIGORAH DISTRICT CACHAR PIN 788804 | CACHAR | ASSAM | 788804 | ₹3.5 Cr | L2 | Rejected-AOC Not being the lowest bidder |
| Sl No | Description | Qty | Unit | Alok Kumar Paul L2 | Ratnadeep Das Purakayastha L1 |
|---|---|---|---|---|---|
| 1.00 | (1) Community Hall at Kalyanpur GP Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1 All kinds of soil. | 22.65 | Cum | 286.85 ₹6,497.15 | 286 ₹6,477.9 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :(a)1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 40 mm nominal size ) | 4.34 | Cum | 6,670.25 ₹28,955.56 | 7,000 ₹30,387 |
| 3.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,869.96 | Kg | 89.65 ₹1,67,641.91 | 110 ₹2,05,695.6 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 29.59 | Sqm | 307.95 ₹9,112.24 | 307 ₹9,084.13 |
| 5.00 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 69.9 | Sqm | 608.35 ₹42,523.67 | 608 ₹42,499.2 |
| 6.00 | Columns, Pillars, Piers, Abutments, Posts and Struts | 37.44 | Sqm | 804.25 ₹30,111.12 | 804 ₹30,101.76 |
| 7.00 | Suspended floors,roofs, landings, balconies and access platforms | 7.31 | Sqm | 766.55 ₹5,603.48 | 766 ₹5,599.46 |
| 8.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | 8.38 | Cum | 8,364.2 ₹70,050.18 | 9,000 ₹75,375 |
| 9.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 2.83 | Cum | 10,185.05 ₹28,803.32 | 10,800 ₹30,542.4 |
| 10.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15" landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level upto floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 3.74 | Cum | 10,719.3 ₹40,100.9 | 11,500 ₹43,021.5 |
Tender Value
₹3.5 Cr
EMD Value
₹7.0 L
Closing Date
14 Nov 2025, 3:00 pmClosed
SE, PWD(Roads) Cachar Circle, Silchar.
O/o The SE, PWD(Roads) Cachar Circle, Silchar.
Con of 1) Community Hall at Kalyanpur GP 2)at KhelmaGP3)at BikrampurGP 4)at RajyeshwarpurGP 5)at Kalain6) Multipurpose halls at Kalian in SR College 7) RCC Immersion Ghat near Old Rail Br at Badarpur Ghat under SOPD-G for 25-26, Katigorah LAC, Cachar
2025_PWD_48236_1
T/CC/ETN/SIL/2025-26/609(T)
Open Tender
Civil Works
365 days
Cachar District.
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,980
₹7.0 L
Yes
O/o The SE, PWD(Roads) Cachar Circle, Silchar.
30 Jun 2026
27 Oct 2025
14 Nov 2025
27 Oct 2025
14 Nov 2025
27 Oct 2025
27 Oct 2025 - 4 Nov 2025
4 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (1) Community Hall at Kalyanpur GP Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1 All kinds of soil. | 1 | Cum | 286.85 | ₹286.56 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :(a)1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 40 mm nominal size ) | - | Cum | 6,670.25 | - |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | Kg | 89.65 | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 1 | Sqm | 307.95 | ₹307.64 |
| 5 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | Sqm | 608.35 | - |
| 6 | Columns, Pillars, Piers, Abutments, Posts and Struts | 1 | Sqm | 804.25 | ₹803.45 |
| 7 | Suspended floors,roofs, landings, balconies and access platforms | 1 | Sqm | 766.55 | ₹765.78 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 8,364.2 | - |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 1 | Cum | 10,185.05 | ₹10,174.86 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15" landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level upto floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 10,719.3 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
FOB.pdf
Tender Documents • 0.37 MB
NIT.pdf
Tender Documents • 0.81 MB
DNIT.pdf
Tender Documents • 2.61 MB
SBD.pdf
Tender Documents • 10.78 MB
BOQ_76711.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid