| 1 | L1₹4.4 LAccepted-AOC 12B NS RD 1ST FLOOR CAL 1 700001 | KOLKATA | WEST BENGAL | 700001 | ₹4.4 L | L1 | Accepted-AOC LOWEST |
| 2 | L2₹4.5 LRejected-AOC | ₹4.5 L | L2 | Rejected-AOC MORE THAN L1 |
| 3 | L3₹4.6 LRejected-Finance 42 305 REDINDANGA 2ND LANE KOLKATA 700039 | KOLKATA | KOLKATA | WEST BENGAL | 700039 | ₹4.6 L | L3 | Rejected-Finance MORE THAN L1 |
| Sl No | Description | Qty | Unit | EXCELSIOR L3 | TECHNO SALES CORPORATION L2 | INTER CONTINENTAL AGENCY L1 |
|---|---|---|---|---|---|---|
| 1.01 | TOTAL | 1 | Nos | 4,64,162 ₹4.6 L | 4,47,286.12 ₹4.5 L | 4,40,787.23 ₹4.4 L |
Tender Value
Refer Docs
EMD Value
₹9,000
Closing Date
14 Jan 2026, 2:00 pmClosed
D.G.(S and D)
Office of the Director-in-General SEWARAGE and DRAINAGE department Kolkata Municipal Corporation 5, S.N. Banerjee Road Kolkata-700 013 West Bengal
Manufacturing, supply and fitting fixing of 250 mm Dia. M.S. Suction pipe line with repairing and replacement of necessary broken and worn out components of the pump unit no.5 and other allied works at Baishnabghata Patuli Drainage Pumping Station
2025_KMC_978654_1
KMC/S_D/PATULI/P5/25-26
Open Tender
MECHANICAL
15 days
DLPS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹9,000
2 Mar 2026
30 Dec 2025
16 Jan 2026
30 Dec 2025
14 Jan 2026
30 Dec 2025
TOTAL
Item Rate BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Disconnect electrical connection from the motor & keep the cable by covering with protective device and dismantling the motor from its base by removing various types of nuts,bolts & coupling as per instruction of EIC.
Dismantling the line shaft by removing ,the plummer blocks, universal joint, couplings, and open out the complete pump housing by removing nuts, bolts etc using various tools and tackles.
Broken the concrete structure surround suction pipe line as per required for sufficient working space due to dismantling dilapidated pipe.
Removing the damage suction pipe and bend pipe at suction end of the pump by using gas cutting and other necessary tools and tackles.
Sealing the main incoming & delivery line by making blank flange and other suitable way.
Supply of M.S. Plate for manufacturing suction pipe and suction bend pipe as per specification and sample with the instruction of EIC.
Pipe bending
Welding in M.S. structural work with gas or electric ( a ) tack weld.
Welding in M.S. structural work with gas or electric ( b ) continuous weld.
Making M.S flange of dia OD-395 mm, ID-275 mm .
Replacment of damaged bearing (22211EK/C4) with new one as per sample from reputed make.
Mfg.supply of U.J cross bearing of universal joint with fitting arrangements as per sample.
Replacement of line shaft broken plummer block with it fitting arrangements.
Mfg. supply of sleeve bush & sleeve sockets including matching with bearings.
Making, fitting fixing of MS special type of flange which used to mount intermidiate shaft with motor to make it perfect matching.
Repairing of pump cooling liquid detector with proper fitting and fixing with necessary degree of accuracy as per direction of EIC.
Straightening the impeller shaft, line shaft by using hydraulic jack and other suitable way to make it perfectly straight.
Remetalizing of worn out portion of impeller shaft followed by grinding and machining as per specification.
Dynamic balancing of the impeller with impeller shaft and static balancing of motor and intermediate shaft.
Mfg.supply with fitting fixing of shaft key as per sample ,direction of EIC.
Fitting, fixing of suction pipe line and newly supply accessories with bolts, nuts, washers, gaskets and other consumable materials as required at Proper positioning with necessary tools and tackles.
Cleaning ,washing with necessary greasing of universal joints as per recommendation.
Supply ,fitting ,fixing of special type nuts, bolts, washers, gasket,packing,o-ring etc after replacing the damage one as per recommandation.
Proper positioning, alignment of pump housing with the motor unit shall be maintaned to prevent vibration and operation failure.
Removing the sealing materials from the suction and delivery side of the pump unit.
Assembly of the whole pump unit consisting of coupling,universal joint, line shaft, bearings, Plummer block base plate, motor pedestal etc.
Lowering the pump units in its own position by engaging necessary tools & tackles.
Commissioning the motor on the pedastal & coupled the motor on pedastal & coupled the motor side coupling & pump side coupling & connect the electric line and trial run unload and load.
Repairing of damaged concrete structure surrounding the suction side of pump as per direction of EIC.
Corrosion free black anticorrosive epoxy primer and two coats synthetic enamel paint on pump body and suction and delivery pipe along with all pipe fittings.
Transportation charge the whole unit with loading and unloading from pumping station to work shop and vice varsa.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_2385028.xls
BOQ • 0.38 MB
FORM.pdf
Tender Documents • 0.75 MB
Download all tender documents and submit your bid