Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-Finance | ₹3.9 L | L1 | Accepted-Finance Accept |
| 2 | L2₹4.1 LRejected-Finance | ₹4.1 L | L2 | Rejected-Finance Reject |
| 3 | L3₹4.3 LRejected-Finance | ₹4.3 L | L3 | Rejected-Finance Reject |
| 4 | L4₹4.6 LRejected-Finance | ₹4.6 L | L4 | Rejected-Finance Reject |
Updated dates
Tender Value
₹4.2 L
EMD Value
₹8,500
Closing Date
17 Mar 2026, 5:00 pmClosed
Executive Engineer
Executive Engineer HPPWD Division Indora
Construction Of Boundary Wall Front side and Right side of School building) (Deposit work).
2026_PWD_130995_1
8448-68 dt. 05.03.2026
Open Tender
Civil Works
60 days
Indora
please refer as tender document
8 documents required · 8 mandatory
₹350
Yes
₹8,500
Yes
30 Jun 2026
10 Mar 2026
18 Mar 2026
10 Mar 2026
17 Mar 2026
10 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. complete as per the direction of Engineer-in-charge including carriage of materils within all leads and lifts and other incidential. The rate is including octori, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government but excluding GST. | 32.4 | Per Cubic metre | 339.15 | ₹10,988.46 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (One cement isto five coarse sand isto ten graded stone aggregate 40 mm ( forty millimeter) nominal size) complete as per the direction of Engineer-in-charge including carriage of materils within all leads and lifts and other incidential. The rate is including octori, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government but excluding GST. | - | Per Square metre | 3,420.39 | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) complete as per the direction of Engineer-in-charge including carriage of materils within all leads and lifts and other incidential. The rate is including octori, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government but excluding GST. | 21.6 | Per Cubic metre | 3,860.7 | ₹83,391.12 |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand) complete as per the direction of Engineer-in-charge including carriage of materils within all leads and lifts and other incidential. The rate is including octori, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government but excluding GST. | 41.4 | Per Cubic metre | 5,468.6 | ₹2,26,400.04 |
| 5 | 15 mm cement plaster on fair side of single or half brick wall of mix 1:4 ( 1 Cement : 4 coarse sand) both side complete as per the direction of Engineer-in-charge including carriage of materils within all leads and lifts and other incidential. The rate is including octori, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government but excluding GST. | 360 | Per Square metre | 173.45 | ₹62,442 |
| 6 | Finishing wall with water proofing cement paint of approved brand and maunfacture and required shade on undecorated wall surfaces ( two coats ) to give an even shade after throughly brushing the surface to remove all dirt and remains of loosse powdered materials complete as per the direction of Engineer-in-charge including carriage of materils within all leads and lifts and other incidential. The rate is including octori, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government but excluding GST. | 360 | Per Square metre | 50.2 | ₹18,072 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
SBDboundry.pdf
Tender Documents • 5.84 MB
BOQ_193680.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid