Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73,565Accepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹79,784.10+₹6,218.99 (8.45%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | THAMBI T V L2 | CHRISTIN BAIJU C L L1 |
|---|---|---|---|---|---|
| 1.00App-1 | |||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 12 | sqm | 9.92 ₹119.04 | 9.15 ₹109.8 Lowest |
| 1.00 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 8.28 | cum | 702.42 ₹5,816.04 | 647.67 ₹5,362.71 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.52 | cum | 8,488.19 ₹4,413.86 | 7,826.59 ₹4,069.83 Lowest |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 3.12 | sqm | 413.19 ₹1,289.15 | 380.99 ₹1,188.69 Lowest |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 11.76 | sqm | 898.37 ₹10,564.83 | 828.35 ₹9,741.4 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.56 | cum | 11,222.98 ₹28,730.83 | 10,348.22 ₹26,491.44 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 217.6 | kilogram | 120.3 ₹26,177.28 | 110.92 ₹24,136.19 Lowest |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 7.2 | cum | 340.76 ₹2,453.47 | 314.2 ₹2,262.24 Lowest |
| 1.01 | OD25251/2025-2026:PVC WEEP HOLES- Providing weep holes using 40mm dia. PVC pipes working
pressure 6kg /sq.cm including cost of materials, conveyance, labour charges etc.
complete. | 1.8 | metre | 122 ₹219.6 | 112.67 ₹202.81 Lowest |
Tender Value
₹74,565
EMD Value
₹1,864
Closing Date
23 Sept 2025, 11:00 amClosed
Assistant Executive Engineer
PVIP Subdivision No IV, Aluva
Construction of Protection Wall at Ch. 4.200 km of Mudikkal sub branch canal at Vengola ward 11
2025_Irrig_794980_2
2/AEE4/2025-26
Open Tender
Civil Works - Canal
Item Rate
180 days
Aluva
7 documents required · 7 mandatory
₹555
Yes
₹1,864
Yes
5 Nov 2025
16 Sept 2025
24 Sept 2025
16 Sept 2025
23 Sept 2025
16 Sept 2025
16 Sept 2025 - 23 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1322146.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .