| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.8 LAccepted-AOC | L1 | Accepted-AOC As being L1 and qualifies eligibility criteria | |
| 2 | L2₹46.8 L+₹1.1 L (2.34%)Rejected-Finance WARD NO 17 T V TOWER ROAD MANENEDRAGARH DISTT M C B C G 497 442 | MANENDRAGARH | MANENDRAGARH CHIRMIRI BHARATPUR | CHHATTISGARH | 497442 | L2 | Rejected-Finance As being L2 |
Tender Value
₹68.4 L
EMD Value
₹85,500
Closing Date
27 Nov 2024, 5:00 pmClosed
Staff Officer (EnM), Chirimiri Area
Office of the General Manager, SECL Chirimiri Area , P.O. West Chirimiri Distt. MCB (C.G.) 497773
Dismantling, Transportation and Extension of 10 nos. belt conveyors, 1000 mm size double drive drum with loop take up at different locations of Kurasia UG Mine, Kurasia Sub Area.
2024_SECL_320657_1
SECL/GM/CHRM/EM/e-Tender/ 24-25/29 dtd. 07.11.2024
Open Tender
Miscellaneous Works
Item Rate
730 days
Kurasia UG Mine, Chirimiri Area
As per NIT
5 documents required · 5 mandatory
₹85,500
1 Mar 2025
7 Nov 2024
29 Nov 2024
7 Nov 2024
27 Nov 2024
8 Nov 2024
8 Nov 2024 - 15 Nov 2024
Amount
Belt installation of double drive with loop take up at 15S/63E and further extension up to 39S/63E (600 mtrs.) with tail end shifting for 11 times at a span of every 50 mtrs. at Kurasia UG mine.
Dismantling & transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.
Installation of 1000 mm size double drive drum with loop take up.
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 45 Te for 600 mtrs.) For 01 time installation and 11 times extension (For 600 mtrs. Structure length at lead from 100 mtrs to 650 mtrs)
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
Placing/changing 1000 mm PVC belting on conveyor structure.
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
Belt installation of double drive with loop take up at 63E/39N and further extension up to 59E/39N (100 mtrs.) with tail end shifting for 1 time at a span of 50 mtrs. at Kurasia UG mine.
Dismantling & transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.
Installation of 1000 mm size double drive drum with loop take up.
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 7.5 Te for 100 mtrs.) For 01 time installation and 1 times extension (For 100 mtrs. Structure length at lead from 200 mtrs to 250 mtrs)
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
Placing/changing 1000 mm PVC belting on conveyor structure.
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
Belt installation of double drive with loop take up at 63E/34N and further extension up to 53E1/29N1 (400 mtrs.) with tail end shifting for 7 times at a span of every 50 mtrs. at Kurasia UG mine.
Dismantling & transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.
Installation of 1000 mm size double drive drum with loop take up.
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 30 Te for 400 mtrs.) For 01 time installation and 7 times extension (For 400 mtrs. Structure length at lead from 100 mtrs to 450 mtrs)
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
Placing/changing 1000 mm PVC belting on conveyor structure.
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
Belt installation of double drive with loop take up at 29N1/53E1 and further extension up to 39N1/53E1 (200 mtrs.) with tail end shifting for 3 times at a span of every 50 mtrs. at Kurasia UG mine.
Dismantling & transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.
Installation of 1000 mm size double drive drum with loop take up.
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 15 Te for 200 mtrs.) For 01 time installation and 3 times extension (For 200 mtrs. Structure length at lead from 150 mtrs to 300 mtrs)
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
Placing/changing 1000 mm PVC belting on conveyor structure.
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
Belt installation of double drive with loop take up at 29N1/58E1 and further extension up to 40N1/58E1 (250 mtrs.) with tail end shifting for 4 times at a span of every 50 mtrs. at Kurasia UG mine.
Dismantling & transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.
Installation of 1000 mm size double drive drum with loop take up.
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 18.75 Te for 250 mtrs.) For 01 time installation and 4 times extension (For 250 mtrs. Structure length at lead from 100 mtr to 300 mtrs)
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
Placing/changing 1000 mm PVC belting on conveyor structure.
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
Belt installation of double drive with loop take up at 63E1/29N1 and further extension up to 63E1/39N1 (200 mtrs.) with tail end shifting for 3 times at a span of every 50 mtrs. at Kurasia UG mine.
Dismantling & transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.
Installation of 1000 mm size double drive drum with loop take up.
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 15 Te for 200 mtrs.) For 01 time installation and 3 times extension (For 200 mtrs. Structure length at lead from 100 mtrs to 250 mtrs)
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
Placing/changing 1000 mm PVC belting on conveyor structure.
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
Belt extension of 15 South conveyor belt from 63W/15S to 75W/15S of Kurasia UG mine. The total structure length is 300 mtr and tail end set will be extended for 6 times after a span of every 50mtrs.
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75 Te for 50 mtrs.. So, 22.50 Te for 300 mtrs.) For 6 times extension (For 300 mtrs. Structure length at lead from 150 mtr to 400 mtrs)
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
Placing/changing 1000 mm PVC belting on conveyor structure.
Belt installation of double drive with loop take up at 15S/75W and further extension up to -2S/75W (400 mtrs.) with tail end shifting for 7 times at a span of every 50 mtrs. at Kurasia UG mine.
Dismantling & transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.
Installation of 1000 mm size double drive drum with loop take up.
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 30 Te for 400 mtrs.) For 01 time installation and 7 times extension (For 400 mtrs. Structure length at lead from 100 mtrs to 450 mtrs)
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
Placing/changing 1000 mm PVC belting on conveyor structure.
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
Belt installation of double drive with loop take up at 75W/9S and further extension up to 81W/9S (150 mtrs.) with tail end shifting for 2 times at a span of every 50 mtrs. at Kurasia UG mine.
Dismantling & transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.
Installation of 1000 mm size double drive drum with loop take up.
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 11.25 Te for 150 mtrs.) For 01 time installation and 2 times extension (For 150 mtrs. Structure length at lead from 100 mtrs to 200 mtrs)
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
Placing/changing 1000 mm PVC belting on conveyor structure.
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
Belt installation of double drive with loop take up at 9S/81W and further extension up to -2S/81W (300 mtrs.) with tail end shifting for 5 times at a span of every 50 mtrs. at Kurasia UG mine.
Dismantling & transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m.
Installation of 1000 mm size double drive drum with loop take up.
Transportation/carriage of steel structure by manual labour including loading, unloading and stacking the same for a lead of 50 mtr. In underground (3.75Te for 50 mtrs.. So, 22.50 Te for 300 mtrs.) For 01 time installation and 5 times extension (For 300 mtrs. Structure length at lead from 200 mtrs to 450 mtrs)
Installation/erection of steel structure for belt conveyor or installation of belt structure of 1000 mm size in UG gallery of 100 mtr. Length.
Transporting of PVC belting from surface to UG up to end track line for lead of 1 km for 1000 mm PVC belting.
Placing/changing 1000 mm PVC belting on conveyor structure.
Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr.
Total impact of GST for the purpose of CTC
SHIV SHAKTI CONSTRUCTION (BID ID -1102387)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .