Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance | L1 | Accepted-Finance AS PER REQMT | |
| 2 | L2₹2.5 L+₹1.0 L (70.1%)Accepted-Finance | L2 | Accepted-Finance AS PER REQMT | |
| 3 | L3₹3.3 L+₹1.8 L (121.1%)Accepted-Finance | L3 | Accepted-Finance AS PER REQMT |
Tender Value
Refer Docs
Closing Date
16 Mar 2021, 5:00 pmClosed
CE RND DELHI
HEAD QUARTERS CE RND DELHI 110054
JOB FOR CONSULTANCY OF AIR CONDITIONER FOR SPECIAL REPAIR/REPLACEMENT OF BER AC PLANT 2X60TR INSTALLED FOR THYROID AC PLANT BUILDING AT INMAS DELHI.(JOB NO-DIR/LS/INMAS/WKS(R)WC-12/2020-21/0148)
2021_MES_424843_1
31000/QTN/11/E3
Limited
Consultancy Services
Item Rate
90 days
CE RND DELHI
please ref tender documents
2 documents required · 2 mandatory
₹0
Exempted
1 Apr 2021
23 Feb 2021
18 Mar 2021
23 Feb 2021
16 Mar 2021
3 Mar 2021
23 Feb 2021 - 2 Mar 2021
Amount
(i) Consultancy services for design of central Air Conditioning (HVAC) system for Thyroid AC plant building at INMAS Delhi under GE(I) R&D Delhi. Areas to be air conditioned and scope of HVAC will be as per Administrative Approval. The approximate capacity of plant 2x60 TR shall be 60 TR running & 60 TR stand by. Inside conditions will be considered as given below.(Authority : User data sheet fwd by GE(I)R&D Delhi vide there letter NO- 2000/Thyroid/AC plant/INMAS/43/E2 dt 28 Nov 2020. (a) Dry Bulb Temperatur : 22±1°C (b) Relative Humidity : 50%±5% (c) IF recirculation is permitted yes of : 1 Air change/hrs per person air changes per hour to be specified (Fresh Air) (d) Occupation (state max and minimum figures): Min : 80 persons , Max : 250 persons (e) Total equipment load in KW inside the AC : (lighting Space. load:-1.5watts/sqftKW &equipment load 102.37KW ±10%) (f) Size of dust parlicles permissible inside : 10 Microns (g) Acceptable noise level. : 50 dB (h) No of hours of running the AC plant : 12 hr per Day (5 day required per week) (j) Whether winter heating and humidification : yes required (k) Heat output in Kcal per Hour or BTU per : Nil hour of stored material (if any). (l) Whether any explosive dust is floating in the air or obnoxious/toxic/explosive/ inflammable /hazardous : No gases/vapours are generated inside? Whether there is any special requirement of taking exhaust air (m) In order to estimate standby power requirement : Yes say whether the continuity of running of AC plants is mandatory. (n) Any other remarks : NA (ii) Preparation of architectural plan of building to be Air Conditioned and Plant Room based on actual site condition, on Auto CAD as required for design and development of HVAC system.
M/S EDIFICE INC
AAKAAR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .