| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.3 L+₹27,784 (3.10%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹11.5 L+₹2.5 L (27.9%)Rejected-Finance NIL | L3 | Rejected-Finance L3 |
Tender Value
₹11.6 L
EMD Value
₹28,947
Closing Date
24 Jan 2024, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
W W Sub division, KWA, Thrissur
Deposit Work_Thrissur Corporation_Pipe line Extension at Nedupuzha Division 44_Pipeline Work_ Additional works
2024_KWA_644672_1
WRD/KWACE(CR)TR/8838/22_26_7_6
Open Tender
Civil Works - Water Works
Item Rate
90 days
Nedupuzha
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹28,947
9 Feb 2024
15 Jan 2024
25 Jan 2024
15 Jan 2024
24 Jan 2024
15 Jan 2024
15 Jan 2024 - 24 Jan 2024
Amount
Supply of Materials and Working charges
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock.
100.9.7:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 75 mm nominal outside diameter pipes.
100.98.212:Supply of PVC Pipe, 6kg/cm2, 75mm Dia.
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
OD66881/2023-2024:Shifting service connection from the existing Water connection line to newly laid 160/110/90/75/63/50 mm PVC line including earth work excavation in all kinds of soil for exposing the existing Water connection line including concrete / tar cutting, dismantling the damaged saddle piece and closure the old line with 20 mm GI Plug, cutting and removing damaged portion of pipe line, fixing new saddle piece, Supply & laying 20 mm ASTM Schedule 80 pipe in extend or reduce the existing length and connecting with existing pipe line ,testing the line to the required test pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20 cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other utilities, including the charges of hire and conveyance of tools, plants and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion, including cost of pipe and saddle piece and as per the direction of departmental officers etc. complete.
Road restoration MORD
4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material
CHANDRAN P
Bidder Name
CHANDRAN P
P SUNILKUMAR
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_986623.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .