Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC AT UPPER KULI JHARIA P O JHARIA DIST DHANBAD | JHARIA | DHANBAD | ₹1.6 L | L1 | Accepted-AOC lowest rate is quoted |
| 2 | L2₹1.6 L+₹1,843 (1.16%)Rejected-Finance H NO 47 GANDHI NAGAR DHANSAR NEAR BHATIA BUILDING SHIV MANDIR DHANBAD DHANBAD 826001 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 826001 | ₹1.6 L+₹1,843 (1.16%) | L2 | Rejected-Finance Rejected as higher rate is quoted |
| 3 | L3₹1.6 L+₹4,543 (2.86%)Rejected-Finance DHANBAD JHARKHAND 828111 INDIA | DHANBAD | DHANBAD | JHARKHAND | 828111 | ₹1.6 L+₹4,543 (2.86%) | L3 | Rejected-Finance Rejected as higher rate is quoted |
| Sl No | Description | Qty | Unit | S K AUTOMOBILE L1 | SHRI DURGA AUTOMOBILES L2 | Q-TECH SALES AND SERVICE L3 |
|---|---|---|---|---|---|---|
| 1.00Repair of ACE Crane 1811305 brake system, unloader valve, stg cylinder overhaul etc at ANTST Lodna area BCCL | ||||||
| 1.01 | Repair of ACE Crane 1811305 brake system, unloader valve, stg cylinder overhaul etc at ANTST Lodna area BCCL
1- Front Both Side Wheel Hub Complete Dismantling and bearing greesing, Fitting. 2 Nos.
2- Front Both Side Wheel Brake Shoe Lining removing Cutting, Changing, Fitting. 8 Nos.
3- Pump Coupling Assly. Dismantling, Fitting. 1 No.
4- Pump Coupling, U.J. Cross Kit, Yoke, Flange Removing Changing, Fitting. 2 Sets.
5- Brake Oil Container Removing Changing, Fitting. 1 Set.
6- Hydraulic Circuit Extension Lift Cylinder Complete Dismantling, Fitting. 1 No.
7- Extension Cylinder Tub Assly. Dismantling, Fitting. 2 Sets.
8- Extension Lift Cylinder, H.P. Hose Assly Complete Dismantling, Changing, Fitting. 2 Sets.
9- Stop Cable Accelerator Cable Removing & Changing, Fitting. 2 Sets.
10- Maintenance Kit Removing & Changing, Fitting. 1 Set.
11- Brake Servo Complete Dismantling, Overhauling, Fitting. 1 No.
12- Brake Servo Body Complete Refacing. 1 No.
13- Brake PU. Tube Assly. Removing Fitting. 1 No.
14- Brake Adaptor Removing, Repairing & Fitting. 2 Nos.
15- Brake Master Cylinder Distributor T. Removing Repairing, Fitting. 1 No.
16- Brake Master Cylinder Bundy Tube Removing, Repairing & Fitting. 1 No.
17- Brake Master Cylinder Complete Removing and Changing, Fitting. 1 No.
18- Brake Tradle Valve Overhauling, Removing Fitting. 1 No.
19- Brake Unloader Valve Overhauling, Removing Fitting. 1 No.
20- Water Pump Assly. Removing & Changing, Fitting. 1 No.
21- Manifold Gasket Removing & Changing, Fitting. 1 No.
22- Steering Cylinder Complete Dismantling, Fitting. 2 Nos. | 1 | Nos | 1,58,857 ₹1,58,857 Lowest | 1,60,700 ₹1,60,700 | 1,63,400 ₹1,63,400 |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹1.6 L
EMD Value
₹1,986
Closing Date
18 Aug 2026, 10:00 amClosed
AREA MANAGER(EXCVN)
AREA MANAGER(EXCVN), LODNA AREA OFFICE,BCCL, P.O. Bhaga, DHANBAD-828301
Front Both Side Wheel Hub Complete Dismantling and bearing greesing, Fitting. 2 Nos.
2026_BCCL_363335_1
BCCL/LA/EXC/E-TENDER/26-27/27
Open Tender
Excavation Department Work
Item Wise
8 days
ANT ST
Please refer Tender documents.
12 documents required · 12 mandatory
₹1,986
31 Aug 2026
8 Aug 2026
19 Aug 2026
8 Aug 2026
18 Aug 2026
8 Aug 2026
8 Aug 2026 - 13 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repair of ACE Crane 1811305 brake system, unloader valve, stg cylinder overhaul etc at ANTST Lodna area BCCL | |||||
| 1.01 | Repair of ACE Crane 1811305 brake system, unloader valve, stg cylinder overhaul etc at ANTST Lodna area BCCL
1- Front Both Side Wheel Hub Complete Dismantling and bearing greesing, Fitting. 2 Nos.
2- Front Both Side Wheel Brake Shoe Lining removing Cutting, Changing, Fitting. 8 Nos.
3- Pump Coupling Assly. Dismantling, Fitting. 1 No.
4- Pump Coupling, U.J. Cross Kit, Yoke, Flange Removing Changing, Fitting. 2 Sets.
5- Brake Oil Container Removing Changing, Fitting. 1 Set.
6- Hydraulic Circuit Extension Lift Cylinder Complete Dismantling, Fitting. 1 No.
7- Extension Cylinder Tub Assly. Dismantling, Fitting. 2 Sets.
8- Extension Lift Cylinder, H.P. Hose Assly Complete Dismantling, Changing, Fitting. 2 Sets.
9- Stop Cable Accelerator Cable Removing & Changing, Fitting. 2 Sets.
10- Maintenance Kit Removing & Changing, Fitting. 1 Set.
11- Brake Servo Complete Dismantling, Overhauling, Fitting. 1 No.
12- Brake Servo Body Complete Refacing. 1 No.
13- Brake PU. Tube Assly. Removing Fitting. 1 No.
14- Brake Adaptor Removing, Repairing & Fitting. 2 Nos.
15- Brake Master Cylinder Distributor T. Removing Repairing, Fitting. 1 No.
16- Brake Master Cylinder Bundy Tube Removing, Repairing & Fitting. 1 No.
17- Brake Master Cylinder Complete Removing and Changing, Fitting. 1 No.
18- Brake Tradle Valve Overhauling, Removing Fitting. 1 No.
19- Brake Unloader Valve Overhauling, Removing Fitting. 1 No.
20- Water Pump Assly. Removing & Changing, Fitting. 1 No.
21- Manifold Gasket Removing & Changing, Fitting. 1 No.
22- Steering Cylinder Complete Dismantling, Fitting. 2 Nos. | - | Nos | 1,58,857 | - |
| 7Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_376253.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_376253.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .