Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹25 Cr
EMD Value
₹50 L
Closing Date
3 Nov 2026, 4:05 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer , Road Project Department, VADODARA MUNICIPAL CORPORATION
Rate Contract For DBM(Carpet) and Liquid sealcoat For South Zone.
358159
509/2026-27
Open
Civil Works - Roads
Works
Vadodara
1 document required · 1 mandatory
₹20,000
Municipal commissioner ,Vadodara municipal corporation
₹50 L
23 Oct 2026
23 Oct 2026
23 Oct 2026
3 Nov 2026
23 Oct 2026
120 days
NAME OF WORK :: Rate Contract For DBM(Carpet) and
Liquid sealcoat For South Zone.
Sr. No. Particulars Page No.
Instruction to Tender
General Condition of Contract
PREQUALIFICATION
BID Special Condtion of Contract
Technical Specification
Annexure A to M
Sr.No Contents Page No.
Volume II Abstract Of Estimate For Part A
Name of Work :- Rate Contract For DBM(Carpet) and
Liquid sealcoat For South Zone.
www.nprocure.com વેબસાઇટ પરથી ટ ડર ભરવા ુ રહશે. યારબાદ સો ટ કોપીના આધાર જ તે ુ ઇવો એ
Tender Department Details Issue of Tender Last Date
P.R.O. Start Date End Date for receipt of
Executive Rate Contract For
Engineer DBM(Carpet) and Liquid
(Road Project) sealcoat For East Zone. 19-10-2026 3-11-2026 5-11-2026
Executive Rate Contract For
Engineer DBM(Carpet) and Liquid
(Road Project) sealcoat For West Zone. 19-10-2026 3-11-2026 5-11-2026
Executive Rate Contract For
Engineer DBM(Carpet) and Liquid
(Road Project) sealcoat For North Zone. 19-10-2026 3-11-2026 5-11-2026
Executive Rate Contract For
Engineer DBM(Carpet) and Liquid
(Road Project) sealcoat For South Zone. 19-10-2026 3-11-2026 5-11-2026
Executive Rate Contract For
Engineer Construction of R.c.c road in
(Road Project) East Zone. 19-10-2026 3-11-2026 5-11-2026
Executive Rate Contract For
Engineer Construction of R.c.c road in
(Road Project) West Zone. 19-10-2026 3-11-2026 5-11-2026
Executive Rate Contract For
Engineer Construction of R.c.c road in
(Road Project) North Zone. 19-10-2026 3-11-2026 5-11-2026
Executive Rate Contract For
Engineer Construction of R.c.c road in
(Road Project) South Zone. 19-10-2026 3-11-2026 5-11-2026
શકશે. અથવા R & B ડપાટમે ટનું (Road, Bridge & Building) ની Special Category- I
૪.૦ છે લા કરલ કામની લેબર એકટ હઠળ મેળવેલ સટ ફ કટની માણીત ન લ (TRUE COPY) ર ુ
૫.૦ પી.એફ.ર .ની માણીત નકલ (TRUE COPY) સામેલ કરવાની રહશે.અથવા સદર કામે કામનો
સામેલ કરવાના રહશે.અ ભ તે કાયપાલક ઇજનેર ી “ Amount of work
done “ ગે ુ ં માણપ અથવા કં લીશન માણપ (Form- 3A) મા ય કરવામાં આવશે.
Details should be given As in below mention Table With Stemp and Signature of
સાથે ુ ં MOU ુ સમયમયાદા માટ ર ૂ કરવા ુ રહશે,
રુ ાવા પણ આપવાના અને ઉ લેખ કરવાનો રહશે અને આ એફ ડવીટ તથા મા લક સાથે ુ ં MOU યાં
MOU નો PERFORMA વડોદરા મહાનગરપા લકા ારા આપવામાં આવશે. લા ટ કાયરત હોવા ુ ં
િવગત . ૩૦૦/- ના ટ પ પેપર ઉપર ઇ રદાર એફ ડવીટ તથા કવોર મા લક સાથે ુ ં MOU
આપવા ુ રહશે અને આ વોર ને ખનીજ ખાતા ુ ં Valid માણ પ આ ું હોય તેવી ન લ.(TRUE
COPY) અને વોર ગે R&B મેકનીકલ શાખા ું H.S.I.સ ટ. ુ ં વેલીડ માણ પ ર ુ કર .ું (TRUE
૦૯. Bank solvency certificate of all nationalized banks including banks specified in Annexure shall
be minimum 20% of tender amount.
તથા મા લક સાથે ુ ં MOU આપવા ુ રહશે.
૧૨. ઇ રદાર પાસે પોતાની મા લક ુ ં ઓછામાં ઓ એક સે સર પેવર (Minimum 3.75 Mtr. width), પાંચ
ઇ રદાર એફ ડવીટ તથા મા લક સાથે ુ ં MOU આપવા ુ રહશે.
ઇ રદાર સે સર પેવર ુ ં Valid Fitness Certificate સ મ અિધકાર ું ર ુ કરવા ુ ં રહશે. તથા સદર
૧૩. ઇ રદાર પોતાની બી ુ મીનસ બેચમી લા ટમાં ફર યાત SCADA Automation Project System
SCADA Automation Project System ઇ ટોલ કરવાની રહશે. ઇ રદાર કાડા જનરટડ ડટાશીટ બીલ
૧૪. ઇ રદાર પાસે પોતાની મા લક ુ ં કો ડ મીલ ગ મશીન (COLD MILLING MACHINE) હો ુ જોઇએ
અથવા જો ઈ રદાર પાસે પોતાની પોતાની માલીક ુ કો ડ મીલ ગ મશીન (COLD MILLING
MACHINE) ન હોઇ તો ઈ રદાર કો ડ મીલ ગ મશીન (COLD MILLING MACHINE) વતં
મા લક સાથે ુ ં MOU રુ ર
કરવામાં આવશે. ટ ડર ુ યા બાદ ુ Qualification ના ડો
૧૯. ભારત સરકાર ારા સમ અથતં ને Cashless10અને digital Transaction આધાર ત બનાવવાના હ ું
હઠળના કમચાર ઓ/મ ુ રો વગેરને કુ વવા પા રકમ Cashless પ ધિતથી બક ખાતામાં કુ વવાની
ી-કવોલીફ કશન સાથે Compulsory સામેલ રાખવાપા દ તાવેજો-પ ોની યાદ નીચેના મ ુ બ આપવાના રહશે
કલાસ કટગર અથવા R & B ડપાટમે ટ ુ ં Special
Category- I (Road, Bridge & Building) કટગર ું
એ ીમે ટ/એફ ડવીટ/MOU ર ુ કરવાની યાદ
ચકાસણી માટ Reference ની જ ર યાત જણાય તો તે વા સંજોગોમાં (Reference) જ ર યાત માણે ના સંબિં ધત
થમ લા ટ પેઈ ટથી લેઇન માક ગ કરવા ુ કામ (Thermo plast માટપણ ગેરંટ િપ રયડ 5 years ુ ીનો
હોવાની પ ર થિતએ ઇ રદારના અ ય કોઇપણ VMC ના કામો પેટ બીલમાંથી કપાત કરવામાં
GPS co-ordinates દશાવ ુ ો ગ સો ટ કોપી તથા હાડ કોપીમાં ર ૂ કરવા ુ રહશે.
મી મટ ર યલની ગાડ ુ ભરલ તથા ખાલી વજનની Electronicની પાવતી ર ુ કરવાની રહશે.
સમયગાળામાં Temparture વ ુ હોઇ યાર િનયિમત ર તે ચારલી રતી પાથરવાની રહશે. જો આમ, કરવામાં
ડામરની લગતી કામગીર ના Scope Of W
or k માં ઇ રદાર બીલ સાથે HPCL
બી ુમીનની ગાડ ંુ ભરલા તથા ખાલી ગાડ ના વજનની El ect r oni c પાવતી ર ુ કરવાની રહશે. તેમજ
APPENDIX (Scope of work )
Indicative List of minimum Plant & Equipment to be Deployed on Contract Work
Sr. Type of Equipment Nos.
1 Tipper Trucks
4 Front end Loader
5 Smooth Wheeled Roller
6 Vibratory Roller
7A Batch mix Plant with Electrnoic
Controls(120 TPH)
8 Wet Mix Plant.
9 Paver Finisher with Electronic Sensor
10 Water Tanker
11 Bitumen Sprayer
12 Pnumatic Tyre Roller
Õ13 Concrete Mixers with integral batching
Weight facility.
14 Mechanical Broom Hydraulic
15 Motor Grader
16 Tractor Dozzer
17 Baby (Small ) Roller
18 SCADA Automation Project System
Plant/Site Laboratory: Contractor
shall have to provide site labouratory
at his won expenses to carry out field
test. For this purpose laboratory
building having 25 sq.mt.shall be
constructed by the contractor which
shall have necessary facility of
light,water etc.
In the absence of any equipment as
per test requirements of section 900 of
Most specification the same shall be
provided by the contractor at any time
as directed by the Engineer.No extra
payment shall be made to the
NOTE: Above indicative list of minimum machinery shall be modified in accordance
with requirement of work on case to case basis.
1. જયારે કોઇ પણ મંડળ તરફથી ભાવપ ક (Tender) ભરવામાં આવે યારે તે મંડળના દરે ક
આવવાનો હોય તો તે નકશા કામ કરવાની િવગતો (Specification) િવગેરેની મા હતી સારી રીતે
મહાનગરપાિલકામાં ટે ડરો ભરવા માટે િતબંિધત )Abeyance.કરવાના રહે શે ( (સામા ય
શરતે આ થઇ છે .(Payment on Account)એ માણે ગણવામાં આવશે અને છે વટની દવાયાદ આકારમાં તેનો સમાવેશ
રકમ ુ ં કોઇ પણ કામ (Extra Item) કામના ભાગ તર ક ઇ રદારને ુ ત કરવામાં આવે તે કામ તેમણે ુ કામ માટ
માણ ત (Schedule Rates)માં
માણ ત માં ટકા રકમõ(Item)દાખલ ન થયેલી હોય તેના ભાવ
15) જો વડોદરા મહાનગરપા લકાના બાંધકામ અિધકાર ને થયેલ કામ એકમ શરતપ (Specification) માણે થયે ુ નથી
લેવા વજન કરવા અગર કામના આલેખને(Linecut) કરવામાં સાધનની જ ર પડ તે કઇ પણ ખચ લીધા વગર આપવી
િન ુ તકરલ TPI ની સા ીમા કરાવી લેવાની જવાબદાર ઇ રદારની રહશે .ઇ રદાર સરકાર / વડોદરા
33)ઇ રદાર કો ાકટ ઓલ ર ક પોલીસી (CAR Policy)ઉતારવાની રહશે માં નીચેના ુ ાનો સમાવેશ કરવાનો રહશે.કામ ુ
ઇ રદાર પાસેથી કરી શકશે અને આ ઉપરાંત ઇ રદારને કાળી યાદીમાં મુકી શકશે/TERMINATE કરી
૪૨) કો ાકટર GST િસવાયના ભાવો ભરવાના રહશે. આ કામ અથ ઇ રદારને GST ની રકમ અલાયદા ુ વવામાં આવશે.
૪૩) ઇ રદારે કામના થળે Moving ટાફીક તેમજ રાહદારીઓની સલામતી માટે જ રી તમામ સંબિં ધત પગલા લેવાના
VADODARA MUNICIPAL CORPORATION
INSTRUCTION TO TENDERERS
1. The Tenderers are advised to inspect the site of works and be fully
acquainted with the site conditions which may be necessary for the purpose
of submitting the tender and for executing the work. If requested in advance
and in writing department will arrange to visit the site of work.
2. In the event of the tender being submitted by the firm, it must be signed by
all the partners or by any partner who has been specifically authorize under
the Partnership deed to sign and execute contracts on behalf of the firm or
by any person holding a Power of Attorney authorized him to sign and
execute the contract on behalf of the firm. [The Authority letter is required to
be enclosed along with the Tender].
3. Receipts for payments made on account of any work, when executed by a
firm, can be signed by any of the partners of the firm or any other person
authorized by the firm under a Power of Attorney of give effectual receipt for
and on behalf of the firm.
4. The tender shall be filled in strictly according to columns prescribed in the
tender stating the rates at which tenderers are willing to undertake each time
of work. Any modifications or additions in the item of works or in any other
part of the tender made by the Tenderer will not be accepted.
5. The VADODARA MUNICIPAL CORPORATION 29 shall have the right to reject
all or any of the tenders without assigning any reason for such rejection.
6. Measurements for all the works shall be taken by standard measures
available with the VADODARA MUNICIPAL CORPORATION and practice
and rules framed by the VADODARA MUNICIPAL CORPORATION from
7. The tenderers are required to quote only firm rates and any condition
attached to the rates quoted by them is likely to disqualify the tender for
evaluation and consideration for award of the work.
8. The tenderers are advised to send their tender by Registered / Speed post
so that tender reaches to VADODARA MUNICIPAL CORPORATION on or
before the due date. Any tender received after due date shall not be
9. Tender not accompanied by Earnest Money in the manner provided in the
tender notice shall not be considered. Amount of earnest money shall
not bear any interest and will be refundable to the Tenderer, if tender is not
10. Tender shall be filled in and signed only by the duly authorized person or
persons of the Tenderer. If at any item during security and finalisation of the
tenders, it is found that any tender or tenders are signed by the persons who
are not duly authorized then the earnest money received with such tender
shall stand forfeited.
11. Tenderer shall have to pay Security Deposit in the time and manner
prescribed under Clause 1 of the General Conditions of Contract.
12. Successful Tenderer shall keep all documents ready for signing “Agreement
with the VADODARA MUNICIPAL CORPORATION”. Tenderer will have to
make himself/itself available at fifteen days notice for executing such
Agreement. The tenderers are advised to carefully study the various
conditions of he contract, work specification, site conditions, VADODARA
MUNICIPAL CORPORATION’s rules and regulations with regards to safety
and security, etc.
13. The prices in tender shall be filled in English with neat handwriting and all
the figures and words shall be legible. No overwriting shall be done. In case
any cancellation or correction is required, the figure or word shall be wholly
crossed and re-written and authenticated under with initial/s of the Tenderer.
Rate shall be written for each item and the total amount for each item shall
Rate shall be written for each item and the total amount for each item shall
be properly calculated and clearly mentioned in the relevant columns. All
such amounts shall be signed by the Tenderer.
14. Tenderer shall submit along with the tender a list of equipment which he
proposes to use for this work.
15. Tendered rates shall include all the material, taxes, labour and requirements
of plants, machinery, equipment, supervision, handling, cleaning, testing etc.
(whether mentioned in the item or specifications etc. or not) which is required
and necessary to complete the item.
16. The tenderers are advised to read together with the specifications including
materials and drawings, as specifications are complimentary part of the item.
Items for which details are not given or are given inadequately reference will
be taken from ISI specifications or MORTH or PWD handbook. Such details
shall be deemed to have been included in the item and the rates quoted
shall be all inclusive. Whether mentioned in the item or not material test as
may be required by the City Engineer of Vadodara Municipal Corporation
shall be provided and no extra payment will be made for that purpose.
17. Specifications are given for certain numbers of items only. However, the
items for which the specifications are not prescribed but which are relevant
to these specifications shall also be executed in accordance with such
specifications.
18. Suitable number of photographs and negatives shall be supplied free of cost
to the Vadodara Municipal Corporation every month for the progress of
various stages of the works.
19. Tenders are required to quote separate prices of different items of work
change in format is acceptable. Quoting for all items is also mandatory.
20. Validity of tenderer’s proposal shall be 120 days from Last Date Of
Submission Of Online Tender.
21. ALL PAGES TO BE INITIALED
All signature in Tender documents shall be dated as well as pages of all
sections of Tender documents shall be initialed at the lower right hand
corner or signed wherever required in the Tender papers by the Tenderer or
by any person holding power of Attorney authorizing him to sign on behalf of
the Tenderer before submission of Tender.
22. RATES TO BE IN FIGURES AND WORDS
The Tenderer shall quote the rates in English both in figures as well as in
words and the rates and amounts tendered by him in the schedule of
quantities as per proforma in Appendix II. The item wise tendered amount
for the work shall be entered in the abstract of estimate and duly signed by
23. EVALUATION OF TENDER’S PRICE BID
Any error in quantity or amount in Price bid of tender form showing items of
works to be carried out shall be adjusted in accordance with the following
i) In the event of a discrepancy between description in words and
figures quoted by a Tenderer in the rates column, the description in
word shall prevail.
ii) In the event of an error occurring in the amount column of the
Schedule B of Tender Form showing items of work as a result of wrong
multiplication of the rate and quantity, the unit shall be regarded, as
firm and multiplication shall be amended on the rate.
iii) All errors in totally in the amount and carrying forward totals shall be
iv) Any rounding off of amounts against items or in totals shall be ignored.
v) For any item in price bid, the bidder has not quoted the rates (or left
blank), it is treated as ‘zero rate’ and all such item shall be considered
as executed free of cost.
The tendered sum so altered shall, for the purpose of the tenders be
submitted for the sum originally tendered and considered for acceptance.
24. CORRECTIONS AND ERASURES
All corrections and Alterations in the entries of tender papers will be signed
in full by the Tenderer with date. No erasures or over writings are
25. SIGNATURE OF TENDERER
The tenderer shall contain the name, residence and place of business of
person or persons making the Tender and shall be signed by the Tenderer
with his usual signature. Partnership firms shall furnish the full names of all
the partners in the Tender. It should be signed in the Partnership’s name by
all partners or, by duly authorized representative followed by the name and
designation of the person signing. Tender by a firm shall be signed by an
authorized representatives and a power of Attorney in that behalf shall
accompany, the Tender. A copy of the constitution of the firm with names of
all partners shall be furnished.
Witness and sureties shall be persons
32 of status and property and their
names, occupations and address shall be stated below their signature.
27. DETAILS OF EXPERIENCE
The Tenderer should enclose documents to show that he has previous
experience in having successfully completed in the recent past work of this
nature together with the name of Owner’s location of sites and value of
28. ENGINEER OF CONTRACTOR
The contractor, on or after award of the work, shall name and depute a
qualified Engineer having sufficient experience in carrying out works of
similar nature, to whom the equipments, materials, if any shall be issued and
instructions for construction/execution shall be given.
29. TRANSFER OF TENDER DOCUMENTS
Transfer of Tender documents purchased by one intending tenderer to
another is not permissible.
30. TIME LIMIT – PERIOD OF COMPLETION
The period of completion shall be calculated from the date of issue of any
notice to proceed with the work i.e. issue of work order. Any extension of
time limit demanded by contractor for their reason, shall not entitle for any
price escalation/delay compensation or liquidity damages.
Addenda to the Tender documents may be issued prior to the date of
opening of Tenders to clarify documents or to reflect modifications in the
design or contract terms.
Each addendum issued by the Engineer in charge will be distributed in
duplicate to each person or organization to whom a set of Tender documents
has been issued.
Each recipient will retain one copy of each addendum for submission along
with his tender and return one singed copy to the Engineer-in-charge shall
become part of Tender documents.
32. RIGHT OF OWNER TO ACCEPT OR REJECT TENDER
The acceptance of Tender will rest with the Owner. The Owner however,
does not bind itself to accept the losouth tender and reserves to itself the
authority to reject any or all the Tenders received without assigning any
reason whatsoever. The whole work may be split up between two or more
contractors or accepted in part and not entirely, if considered expedient.
Tender in which any of the particulars and prescribed informations are
missing or are incomplete in any33respect and/or the prescribed conditions
are not fulfilled are liable to be rejected.
Canvassing in connection with tender is strictly prohibited and tenders
submitted by the tenderers, who resort to canvassing will be liable to
33 In the event of progress of work by the contractor, without executing the
contract agreement, the responsibility with all risk and cost shall be of
34 The successful Tenderer will be required to sign the contract agreement on a
stamp paper of the value as per prevailing norms of Vadodara Municipal
Corporation. Alternatively, if the Tenderer wishes to sign the agreement, the
same be adjudicated by the State Level Authority competent to do so.
35 It is responsibility of tenderer to get authorized copy of tender documents,
map etc so that during the time of execution of work contractor can proceed
with work and all time the details of work is known to the contractor.
36 The bidder shall have to submit resource/activity chart of whole work divided
in minimum 10 activities justifying the timely completion of work. In case the
bidder do not submit the schedule of work progress, it is mandatory to follow
the progress of work as decided by Vadodara Municipal Corporation during
VADODARA MUNICIPAL CORPORATION
General Conditions
GENERAL CONDITIONS OF CONTRACT
DEFINITION OF TERMS :-
In the Contract documents as hereinafter defined the following words &
expression shall have the meanings hereby assigned to them except where the
context otherwise requires :-
1. “The Owner or Employer”, means the Municipal
Commissioner Vadodara Municipal Corporation, Vadodara which may
abbreviated as “VADODARA MUNICIPAL CORPORATION” and includes
the Owner’s or Municipal Commissioner, VADODARA MUNICIPAL
CORPORATION’s authorized representatives or successors.
2. The abbreviation VADODARA MUNICIPAL CORPORATION wherever used
in contract shall mean Vadodara Municipal Corporation and term shall be
used to in place of authorized person or persons who will be operating this
contract as VADODARA MUNICIPAL CORPORATION’s representative and
will include namely Municipal Commissioner, City Engineer and Executive
Engineer or their authorized representatives.
3. The “City Engineer”, shall means the City Engineer of Vadodara Municipal
Corporation and shall include those who are expressly authorized by him to
act on his behalf.
4. The “Executive Engineer”, shall means the Executive Engineer of
Vadodara Municipal Corporation, who is incharge of the project and shall
include those who are expressly authorized him to act for and on his behalf.
5. The “Engineer in charge”, shall means the Deputy Executive Engineer of
Vadodara Municipal Corporation, who is incharge of the project and shall
include those who are expressly authorized him to act for and on his behalf.
6. “The Contractor”, means the person or persons, firm or Company whose
tender has been accepted by the Owner and include the Contractor’s legal
representatives, his successor and permitted assignees.
7. The term “Work or Works” of the contract shall mean all of the various
classes of works to be executed in accordance with the contract, whether
temporary or permanent, and include all labour and material, machinery,
instruments, construction equipment, plant, plant operation and
maintenance, all tools and all other items required for the completion of the
construction. It shall also mean the place of working, where the context so
8. “Contract”, shall mean the Agreement between the Vadodara Municipal
Corporation and the contractor for the execution of works including therein
all contract documents like Condition of Contract, Specification, Drawings,
Prices Bill, Schedule of quantities, Schedule of rates and prices (if any), work
order and all tender .
9. The “Contract Price”, means the sum named in the Tender subject to such
additional there to or deduction there from as may be under the provisions
hereinafter the contained.
10. “Construction Plant”, means all machinery, tools, appliances or thing of
whatsoever nature required for the execution, completion or maintenance of
the works or temporary works (as hereinafter defined) but does not include
materials or other things form or forming part to the permanent work.
11. “Temporary Works”, means all temporary works of every kind required in
or about the execution, completion or maintenance of the works. The cost of
such work associated with tender is included .
12. “Drawings”, means the drawings referred to in the Specification and any
modification such drawings approved in writing by the City Engineer /
Executive Engineer, Consultant and such other drawings, diagrams, or
sketches as may from time to time be furnished or approved in writing by the
City Engineer / Executive Engineer.
13. “Site”, means the land and other places on under in or through which the
permanent works are to be executed or carried out & any other land or
places provided by the Owner for purpose of the contract.
14. Words importing the singular number only also include the plural and vice
versa where the context requires.
15. ”Contract Documents”, means collectively the Tender documents,
Designs, Drawings, Specifications agreed variations if any, contract such
other documents constituting the Tender and acceptances thereof.
16. “The Specification”, shall mean the various technical specifications
attached and referred to in the Tender documents. It shall also include the
latest edition of relevant Indian Standard Specification published before
entering into contract. Further in absence of any specific reference in I.S.S.
the standards and specifications of P.W.D.H.B. or GWSSB as the case may
be will be followed as per the consent of city engineer.
17. The “Tender”, means the tender submitted by the contractor for
acceptances by the Owner.
18. The “Alternation Order”, means the order given in writing by the Engineer-
in-charge to effect to or deleting from and alternations in the works.
19. The “Completion Certificates”, shall mean the certificate to be issued by
the City Engineer, when the works have been completed to his satisfaction.
CLAUSE 1 : COMPENSATION OF DELAY AND PENALTY DELAY
The time allowed for carrying out the work as entered in the tender shall be strictly
observed by the contractor and shall be reckoned from the date of which the order
to commence work is given to the contractor. The work shall throughout the
stipulated period of the contract be proceeded with, with all due diligence (time
being deemed to be of the essence of the contract on the part of the contract) and
the contractor shall pay as compensation and or penalty for delay. Further
contractor shall to ensure good progress during the execution of the work. The
work shall be completed stage wise as per the schedule given at the time of tender
submission (Refer qualification criteria) before award of the job to contractor, and
which will form the part of the contract, failing which intermediate compensation
shall be levied. In case contractor have not submitted it is confirmation the
schedule of work progress, on part of contractor follow the schedule of work
decided by VADODARA MUNICIPAL CORPORATION.
In the event of the contractor failing to comply with these conditions of Contract is
liable to be terminated at any stage and / or an amount equal to one half percent
of contract amount of whole work over stipulated time limit shall be levied as a
penalty for every day that the delay or penalty provided always that the total
amount of compensation to be paid under the provision of this clause shall not
exceed 10% of the contract value of the work.
The decision of City Engineer will be final for all such delay compensation.
CLAUSE 2: ACTION WHEN WHOLE OF SECURITYDEPOSIT IS
In any case in which under any clause of this contract, the contractor shall
have rendered himself liable to pay
38 compensation amounting to the whole of
his Security Deposit (Whether paid in one sum or deducted by installment) or
in the case of abandonment of the work owing to serious illness or death of
the contractor or any other cause, the city Engineer, on behalf of Vadodara
Municipal Corporation shall have power to adopt any of the following courses
as man, deemed best suited to the interest of Vadodara Municipal
a) To rescinded the contract (of which recession notice in writing to the
contractor under the hand of the executive Engineer shall be conclusive
evidence) and in that case, the Security deposit of the contractor shall stand
forfeited and be absolutely at the disposal of the Vadodara Municipal
b) To employ labour paid the Vadodara Municipal Corporation and to supply
materials to carry out the work, or any part of the works, debiting the
contractor with the cost of the labour and price of materials as to the
correctness of which cost and price the certificate of the City Engineer shall
be final and conclusive against Contractor and crediting him with the value of
the work done, in all respect in the manner and at the same rate as if it had
been carried out by the contractor under the terms of this contract and in that
case the certificates of the Executive Engineer as to the value of the work
done shall be final and conclusive against the contractor.
c) To order that the work of the contractor be measured up and to take such
part thereof as shall be unexecuted out of his hands, and to give it to another
contractor to complete, in which case, any expenses which may be incurred
in excess of the sum which would have been executed by him (as to the
amount of which expenses the certificate in writing of the City Engineer shall
be final and conclusive) shall be borne and paid by the original contractor
and shall be deducted from any money due to him by the Vadodara
Municipal Corporation under the contractor or otherwise or from his security
deposit or the proceeds of sale thereof, of a sufficient part thereof. In the
event of any of the above courses being adopted by the City Engineer the
contractor shall have no claim to compensation for any loss sustained by him
by reason of his having purchased, or prepared any materials, or entered
into any engagements, or made any advances on account of or with a view
to execution of the work or the performance of the contract. And in case of
the contract shall be rescinded under the provision aforesaid, the
contractor shall not be entitled to 39recover or be paid any sum, for any work
therefore actually performed by him under this contract unless and until the
Executive Engineer shall have certified in writing the performance of such
work and the amount payable to him in respect thereof and he shall only be
entitled to be paid the amount so certified.
CLAUSE 3 : ACTION WHEN THE PROGRESS OF ANY PARTICULAR
PORTION OF THE WORK IS UNSATISFACTORY
If the progress of any particular portion of the work is unsatisfactory the City
Engineer / Executive Engineer shall, not withstanding that the general
progress of the work is satisfactory in accordance with Clause 2, be entitled
to take action under clause 3(b) after giving the contractor 10 days notice in
writing and the contractor shall have no claim for compensation for any loss
sustained by him owing to such action.
CLAUSE 4: CONTRACTOR REMAINS LIABLE TO PAY COMPENSATION, IF
ACTION NOT TAKEN UNDER CLAUSE 3 POWER TO TAKE
POSSESSION OF OR REQUIRE OF OR SELL CONTRACTOR
PLANT AND MATERIAL
In any case in which any of powers conferred upon the City Engineer by
Clause 3 and 4 hereof shall have become exercisable and the same not
have been exercised, the non-exercise thereof and such powers shall not
constitute a waiver of any of the conditions thereof and such powers shall
not withstanding be exercisable in any future case of default by the
contractor for which by any clause or clauses thereof he is declared liable to
pay compensation amounting to the whole of his security deposit and the
liability of the contractor for past and future compensation shall remain
unaffected. In the event of the City Engineer taking action under sub clause
(a) or (c) of Clause 3, he may, if he so desires, take possessions of all or any
tools, plant, materials and stores in upon the works or the site thereof of
belonging to the contractor or procured by him and intended to be used for
the execution of the work or any part thereof paying or allowing for the same
in the account of the contract rates or in the case of contract rates not beings
applicable at current market rates, to be certified by the Executive Engineer
whose certificates thereof shall be final. In the alternative the City Engineer
may be notice in writing to the contractor of his works foreman or other
authorized agent require him to remove such tools plants, materials or stores
from his premises within a time to be specified in such notice and in the
event of the contractor failing to comply with any such requisition, the City
Engineer may remove them at the contractor’s expense or sell them by
auction or private sale at the risk and cost of the contractor in all respect,
and the certificate of the Executive Engineer as to the expense of any such
removal, and the amount of the proceeds and expenses of any such sale
shall be final and conclusive against the contractor.
CLAUSE 5: FINAL CERTIFICATE
On completion of the work the contractor shall be furnished with a certificate
by the City Engineer of such completion but no such certificate shall be given
or considered to be complete until the contractor shall have removed from
the premises on which the work shall have been executed all scaffolding,
surplus materials and rubbish and shall have cleaned off the dirt from site or
any rubies or such other parts, etc.
CLAUSE 6 : PAYMENT OF REDUCED RATES ON ACCOUNT OF ITEMS
OF WORKS NOT ACCEPTED AS COMPLETED TO BE AT
THE DISCRETION OF THE EXECUTIVE ENGINEER.
The rates for several items of works estimated to cost more that Rs. 1,000/-
agreed to within, shall be valid only when the item concerned is accepted as
having been completed fully in accordance with the sanctioned
specifications. In cases where the items of work are not accepted as so
completed the Executive Engineer may make payments on account of such
items at such reduced rates as he may consider reasonable in the
preparation of final or on account bills.
CLAUSE 7 : BILLS TO BE ON PRESCRIBED FORM
The contractor shall submit all bills on the prescribed forms to engineer in
charge. The charges to be made in the bills shall always be entered at the
rates specified in the tender or in the case of any extra work ordered in
pursuance of these conditions, and not mentioned or provided for in the
tender, at the rates herein after proved for such work.
CLAUSE 8: WORKS TO BE EXECUTED IN ACCORDANCE WITH
SPECIFICATIONS, DRAWINGS, ORDERS, ETC.
The contract shall execute the whole and every part of the work in the most
substantial and workman like manner, and both as regards materials and in
every other respect in strict accordance with the specifications. The
contractor shall also confirm exactly full and faithfully to the designs, and
instructions in writing relating to work signed by the Executive Engineer
And lodge in his office and to which the contractor shall be entitled to have
access for the purpose of inspection of such office or on the site of the work
during the office hours and the contractors shall if he so requires, be entitled
at his own expenses to make or cause to be made copies of the
specifications and of all such designs, drawings or instruction aforesaid.
CLAUSE 09 : ALTERATIONS IN SPECIFICATIONS AND DESIGNS NOT TO
BE INVALIDATE CONTRACTS. RATES FOR WOKS NOT
ENTERED OR SCHEDULE RATE.
The City Engineer shall have power to make any alteration in or addition to
the original specifications, drawings and instructions that may appear to him
to be necessary or advisable during the progress of the work and the
contractor shall be bound to carry out the work in accordance with any
instruction in this connection which may be given to him in writing signed by
the City Engineer / Executive Engineer and such alteration shall not
invalidate contract. Any additional work which the contractor may be
directed to do in the manner above specified as part of the work shall be
carried out by the contractor on the same conditions in all respect on which
he agreed to do the main work, and at the same rates as are specified in the
tender for the main work. And if the additional and altered in the tender for
the work, and if the additional and altered work includes any class of works
for which no rate is specified in this contract, then such class of works shall
be carried out at the rates entered in the Scheduled Rates or at the
calculated rates whichever are lower. If the additional or altered work for
which no rate is entered in the Schedule of Rates in ordered to be carried
out before the rates are agreed upon then contractors shall within seven
days of the date of receipt by him of the order to carry out the work, inform
the Executive Engineer of the rate which he is intention to charge for such
class of work, and to arrange to carry out in such manner as he may
consider advisable provided always that if the contractor shall commence
work or incurred any expenditure in regard there to before the rates shall
have been determined as lastly here in before mentioned then in such
cases, he shall only be entitled to be paid in respect of the work carried out
or expenditure incurred by him prior to such date of the determination of the
rate as aforesaid according to such rates as shall be fixed by the Executive
Engineer, in the event of a dispute, the decision of the City Engineer will be
final. Where however, the work is to be executed according the designs,
drawings and specifications recommended by the contractor and accepted
by VADODARA MUNICIPAL CORPORATION, the alteration above referred
shall be within the scope of such design, drawings and specifications
appended to the tender. The time limit for completion of works shall be
extended in the proportion that the increase in cost occasioned by alterations
or additions bears to the cost of the original contract work, and the certificate
of the Executive Engineer as such proportion shall be conclusive.
CLAUSE 10 : NO COMPENSATION FOR ALTERATION OR RESTRICTION
If at any time after execution of the contract documents, the City Engineer
shall, for any reason what so ever, require the whole or any part of the work,
as specified in the tender, to be stopped for any period or shall not require
the whole or part of the work to be carried out at all or to be carried out by
the contractor, he shall give notice in writing of the fact to the contractor, who
shall there upon suspend or stop the work totally or partially, as the case
may be. In any such case, except as provided here under, the contractor
shall have no claim to any payment or compensation what so ever on
account of any profit or advantage which he might have derived from the
execution of the work in full but which he did not so derive in consequence of
the full amount of the work not having been carried out, or on account of any
loss that he may be put on account of materials purchased or agreed to be
purchased, or for unemployment of labour recruited by him. He shall not
have also any claim for compensation by reason of any alteration having
been made in the original specifications, drawings, designs and instructions
which may involve any curtailment of the work as originally contemplated.
Where however, materials have already been purchased or agreed to be
purchased by the contractor before receipt by him of the said notice, the
contractor shall be paid for such materials at the rates determined by the
Executive Engineer provided they are not in excess of requirements and are
of approved quality and / or shall be compensated for the loss if any, that he
may be put to, in respect of materials agreed to be purchased by him, the
compensation to be determined by the Executive Engineer whose decision
shall be final. If the contractor suffers any loss on account of his having to
pay labour charges during the period during which the stoppage of work has
been ordered under this clause,43 the contractor shall, on application be
entitled to any compensation on account of labour charge as the Executive
Engineer, whose decision shall be final may consider reasonable. Provided
that the contractor shall not be entitled to any compensation on account of
labour charges if, in the opinion of Executive Engineer, the labour could have
been employed by the contractor elsewhere for the whole or part of the
period during which the stoppage of the work has been ordered as aforesaid.
CLAUSE 11 : NO CLAIM TO COMPENSATION ON ACCOUNT OF LOSS
DUE TO DELAY IN SUPPLY OF MATERIALS BY THE
VADODARA MUNICIPAL CORPORATION OR
PROCUREMENT OF MATERIAL FROM MARKET.
The contractor shall not be entitled to claim any compensation from the
VADODARA MUNICIPAL CORPORATION for the loss suffered by him on
account of delay by the VADODARA MUNICIPAL CORPORATION in the
supply of materials or entered in the Schedule A, or procurement of material
from market by contractor where such delay is caused by
1. Force Majeure
3. Act of enemies of the State or any other reasonable cause beyond the
control of Vadodara Municipal Corporation.
CLAUSE 12 : ACTION AND COMPENSATION PAYABLE IN CASE OF BAD
If at any time before the performance Gerrantee is refunded to the
contractor, it shall appear to the City Engineer or his subordinate in charge of
the work that any work has been executed with unsound, imperfect or
unskilled workmanship or with materials of inferior quality, or that any
materials or articles provided by him for the execution of the work are
unsound or of a quality inferior to that contracted for, or are otherwise not in
accordance with the contract, it shall be lawful for the City Engineer to
intimate this fact in writing to the contractor and then not with standing the
fact that the work materials or articles complained of may have been
inadvertently passed, certified and paid for the contractor shall be bound
forthwith to rectify or remove and reconstruct the work so specified in whole
of or in part as the case may require, or if he is required, shall remove the
material or articles so specified and provided other proper and suitable
materials or articles at his own charge and cost; and in the event of his
failing to do so within a period to be specified by the City Engineer in the
written intimation aforesaid the contractor shall be liable to pay
compensation at the rate of one per cent on the amount of the contract sum
for every day not exceeding ten days, during which the failure so continues,
and in the event of any such failure as aforesaid the City Engineer may
rectify or remove and re-execute the work or remove and replace the
materials or articles as complained of as the case may be at the risk and
expense in all respect of the contractor. If the City Engineer consider that
any such inferior work or materials as described above may be accepted or
made use of, it shall be within his discretion to accept the same at such
reduced rates as he may fix here fore.
CLAUSE – 13: WORKS TO BE OPEN TO INSPECTION. CONTRACTOR OR
REASONABLE AGENT TO BE PRESENT
All works under or in course of execution in pursuance of the contract shall
at all times be open to the inspection and supervision of the City Engineer
and his subordinates or agents appointed by Vadodara Municipal
Corporation and the contractor shall at all times during the usual working
hours and at all other times at which reasonable notice of the intention of the
City Engineer or his subordinate or agents appointed by Vadodara
Municipal Corporation to visit the works shall have been given to included.
In the specification or other documents forming part of the contract referred
to in these conditions or not and which may be necessary for the purpose of
satisfying or complying with the requirements of the City Engineer as to any
matter on which under these conditions he is entitled to be satisfied or which
he is entitles require together with carriage, therefore, to and for the work.
The contractor shall also supply without charge the requisite number of
persons with the means and materials necessary for the purpose of setting
out works, and counting, weighing and assisting in the measurement or
examination at any time of the work or materials, failing this the same may
be provided by the Executive Engineer at the expense of the contractor and
the expense may be deducted from any money due to the contractor under
the contract or from his Security Deposit. The contractor shall provide all
necessary fencing and lights required to protect the public from accident and
shall also be bound to bear the expense of defence of every suit, action or
other legal proceedings, at law, that may be brought by any person for injury
sustained owing to neglect of the above precautions, and to pay any
damages and costs which may be awarded in any such suit, action or
proceedings to any such persons or which may be with the consent of the
contractor be paid in compromising any claim by any such person.
Clause-14 Deleted.
CLAUSE 15 : HOISTING APPLIANCES ETC.
The contractor shall comply with the following regulations as regards the
Hoisting Appliances to be used by him :
a. Hoisting machines and tackle : including their attachments,
anchorages and supports, shall
(I) e of good mechanical construction, sound material and
adequate strength and free patent defect; and
(II) be kept in good repair and in good working order.
b. Every rope used in hoisting or lowering materials or as a means or
suspension shall be of suitable quality and adequate strength and free
from patent defect.
c. Hoisting machines and tackle shall be examined and adequately
tested after erection on the site and be reexamined in position at
intervals to be prescribed by VADODARA MUNICIPAL
d. Every chain, ring, hook, shackle, swing and pulley block used in
hoisting or lowering materials or as means of suspension shall be
periodically examined.
e. Every crane driver or hoisting appliance operator shall be properly
f. No person who is below the age of 20 years shall be in control of any
hoisting machine including any winch or give signals to the operator.
g. In the case of every hoisting machine and of every chain, ring, hook,
shackle, swivel and pulley used in hoisting or lowering or as a means
of suspension the safe working load shall be ascertained by adequate
h. Every hoisting machine and all gear referred to in the preceding
regulation be plainly marked with the safe working load.
i. In the case of hoisting machine having a variable safe working load
each safe working load and the conditions under which it is applicable
shall be clearly indicated.
j. No part of any hoisting machine or any gear referred to in regulation
above shall be loaded beyond the safe working load except of the
purpose of testing.
k. Motors, gearings, transmissions, electric wiring and other dangerous
parts of hoisting appliances shall
46 be provided with efficient safeguards.
l. Hoisting appliances shall be provided with such means as will reduce
to a minimum the risk of the accident descent of the load.
m. Adequate precautions shall be taken to reduce to a minimum risk of
any part of a suspended load becoming accidentally displaced.
CLAUSE 16 : MEASURES FOR PREVENTION OF FIRE
The Contractors shall not set fire to any standing jungle, trees brushwood or
grass without a written permit from the City Engineer. When such permit is
given and also in all cases when destroying out of a dug up trees,
brushwood, grass etc. by fire, the contractor shall take necessary measures
to prevent such fire spreading to or other wise damaging surrounding
CLAUSE 17 : LIABILITY OF CONTRACTOR FOR ANY DAMAGE DONE IN
OR OUTSIDE WORK AREA
Compensation for all damage done intentionally or unintentionally by
contractor’s laborer whether in or beyond the limits of the work site including
any damages caused by the spreading of Fire mentioned in clause 18 shall
be estimated by the Executive Engineer or such other officer as the
Vadodara Municipal Corporation may appoint and the estimates of the
Vadodara Municipal Corporation shall be final and the contractor shall have
to pay the amount of the assessed compensation on demand failing which
the same will be recovered from the contractor as damages in the manner
prescribed in clause 1 or deducted
By the City engineer from any sums that may be due to or become due from
the Vadodara Municipal Corporation to the contractor under this contract or
otherwise. The contractor shall bear the expenses of defending any action
or other legal proceedings that may be brought by any person for injury
sustained by him owing to neglect of precautions to prevent the spread of
Fire and shall be also pay any damage and cost that may be the court in
consequence. However in any case Vadodara Municipal Corporation can
not be suit under any circumstances.
CLAUSE 18 : WORKS NOT TO BE SUBLET
The contractor shall not be assigned or subleted without approval of the City
Engineer and if the contractor shall assign or sublet his contract or attempt to
do so or become insolvent or commence any proceedings to the adjudicated
an insolvent or make any compensation with his creditors or attempt to do
so, the City Engineer may by notice in writing, rescind the contract. Also if
any bribe, gratuity, gift, loan, prerequisite reward or advantage pecuniary or
otherwise shall either directly or indirectly
47 be given, promised or offered by
the contractor or any of his servants or agents to any public officer or person
in the employment of or authorized by the VADODARA MUNICIPAL
CORPORATION in any way relating to his office or employment, if any such
officer or person shall become in any directly or indirectly interested in the
contract, the Vadodara Municipal Corporation may, by notice in writing
rescind the contract.
In the event of a contract being rescinded, the Security Deposit of the
contractor shall thereupon stand forfeited and be absolutely at, the disposal
of the VADODARA MUNICIPAL CORPORATION and the same
consequence shall ensure as if the contract had been rescinded under
clause 3 hereof and in addition the contractor shall not be entitled to recover
or be paid for any work therefore actually performed under the contract.
CLAUSE 19: SUM PAYABLE BY WAY OF COMPENSATION TO BE
CONSIDERED AS REASONABLE COMPENSATION
WITHOUT REFERENCE TO ACTUAL LOSS.
All sums payable by contractor by way of compensation under any of these
conditions shall be considered as reasonable compensation on be applied to
the use of the VADODARA MUNICIPAL CORPORATION without any
reference to be actual loss or damage sustained and whether any damages
had not been sustained.
CLAUSE 20 : EXECUTION OF WORKS
All works to be executed under the direction and subject to the approval in all
respect of the Executive Engineer for the time being, who shall be entitled to
direct at what point or points and in what manner they are to be commenced
and from time to time carried on.
CLAUSE 21 : DECISION OF THE VADODARA MUNICIPAL CORPORATION
Except where otherwise specified in the contract and subject to the powers
delegated to the Engineer-in-charge by the VADODARA MUNICIPAL
CORPORATION, the decision of the City Engineer for the time being shall
be final conclusive and binding on all parties to the contract upon all question
relating to the meaning of the specifications, designs, drawings and
instruction herein before mentioned and as to the quality of workmanship or
material used on the work or as to any other question, claim, right, matter or
thing whatsoever, in anyway arising out of or relating to the contract designs,
drawings, specifications estimates, instructions, orders or these conditions or
otherwise concerning the works or the execution of failure to execute the
same, whether arising during the progress of the work or after completion of
abandonment thereof.
CLAUSE 22 : WORK ON SUNDAY
No work shall be done on Sunday or Holiday without written permission of
Executive Engineer.
CLAUSE 23 : LUMP SUMS IN TENDER
When the estimate on which a tender is made includes lump sums in respect
of parts of the work, the contractor shall be entitled to payment in respect of
the items of work involved or the part of the work in question is not in the
opinion of the Executive Engineer capable of measurement, the Executive
Engineer may at his discretion pay the lump sum amount entered in the
contract and the certificate in writing of the Executive Engineer shall be final
and conclusive against the contract with regard to any sum or sums payable
to him under the provisions of this clause.
CLAUSE 24 : ACTION WHERE NO SPECIFICATIONS ARE AVAILABLE
In the case of work for which there is no such specification, work shall be
carried out in accordance with the P.W.D. or I.S.I. specifications and in the
event of there being no P.W.D. or I.S.I. specifications the work shall be
carried out in all respects in accordance with the instructions and
requirements of the Executive Engineer.
CLAUSE 25 : DEFINITION OF WORK
The expressions “Work” or “Works” whenever used in these conditions shall
unless, there be something in the subject or context repugnant to such
construction be constructed to mean the work or the works contracted to the
executed under or by virtue of the contract, where temporary or permanent
and whether original altered substituted or additions.
CLAUE 26 : QUERRY FEES AND ROYALTIES, ETC.
All query fee, royalties, octroi dues and ground rent for stacking materials, if
any should be paid by the contractor.
CLAUSE 27 {A}: ACCIDENT OR INJURY TO WORKMAN
1. The contractor to Indemnify the VADODARA MUNICIPAL
The VADODARA MUNICIPAL CORPORATION shall not be liable for
or in respect of any damages or compensation payable by law in
respect or in consequence of any accident of injury to any workman or
other person in the employment of the contractor or his any sub-
contractor and contractor shall indemnify the VADODARA MUNICIPAL
CORPORATION against such damages and compensation and
against all claims, demands, proceedings, costs, charges, expenses
whatsoever in respect thereof or in relation thereto.
2. Payments of Claims and Damages :
Vadodara Municipal Corporation have to pay any money in respect of
such claims or demands as aforesaid the amount so paid and the
costs incurred by the Vadodara Municipal Corporation shall be
charged to and paid by the contractor and the contractor shall not be at
liberty to dispute or question the right of the Vadodara Municipal
Corporation to make such payments not with standing the same may
have been made without his consent or authority or in law or otherwise
to the contrary.
CLAUSE 27 {B} COMPENSATION UNDER WORKMAN’S
COMPENSATION ACT.
The contractor shall be responsible for and shall pay any
compensation to his workers payable under the Workman’s
compensation Act 1923, VII of 1923. hereinafter called the said Act for
injuries caused to the workers. If such compensation is paid by the
VADODARA MUNICIPAL CORPORATION as principle under sub –
section (I) of section 12 of the said Act on behalf of the contractor, it
shall be recoverable by the VADODARA MUNICIPAL CORPORATION
from the contractor under sub – section (2) of the section. Such
compensation shall be recovered in the manner laid down in the
Clause I above.
CLAUSE 28 : MEDICAL AID TO LABOUR
The contractor shall be responsible for and shall pay the expenses of
providing medical aid to any workman who may suffer a bodily injury as a result
of an accident. If such expenses are incurred by the VADODARA MUNICIPAL
CORPORATION the same shall be recoverable from the contractor forthwith and
be deducted without prejudiced to any other remedy of the Vadodara Municipal
Corporation from any amount due or that may become due to the contractor.
CLAUSE 29 : SAFETY MEASURES
The contractor shall provide all necessary personal safety equipment and
first aid apparatus available for the use of the persons employed on the site,
shall maintain the following regulations in connection therewith.
a. The workers shall be required to use the equipment so provided by the
contractor and the contractor shall take adequate steps to ensure proper
use of the equipment by those concerned.
b. When work is carried on in proximity to any palce where there is a risk of
drawing all necessary equipment shall be provided and kept ready for use
and all necessary steps shall be taken for the prompt rescue of any
person in danger.
c. Adequate provision shall be made for prompt first aid treatment of all
injuries likely to be sustained during the course of the work.
CLAUSE 30 : CLAIM FOR QUANTITIES OF WORK ENTERED IN THE
Quantity shown in the tender are approximate and no claim shall be
entertained for quantity of work executed being either more or less than
those entered in the tender or estimate.
CLAUSE 31 : NO CLAIM FOR COMPENSATION FOR DELAY IN STARTING
No compensation shall be allowed for any delay caused in the starting of the
work on account of any problem related to acquisition of land delay in
administrative clearance of work. And for any delay in according sanction to
CLAUSE 32 : CLAIM FOR COMPENSATION FOR DELAYING THE
EXECUTION OF WORK
No compensation shall be allowed for any delay in execution of the work on
account of water standing in borrow pits or compartments. The rates ate
inclusive for hard or cracked soil excavation in mud sub-soil water, or water
standing in borrow pits and no claim for an extra rate shall be entertained
unless otherwise specified.
CLAUSE 33 : ENTERING UPON OR COMMENCING ANY PORTION OF
The contractor shall not enter upon or commence any portion of work except
with the written authority and instruction of the Executive Engineer or of his
sub ordinate in charge of the work. Failing such authority the contractor
shall have no claim to ask measurements oR payment for work.
CLAUSE 34 : LABOUR LAWS AND SAFETY REGULATIONS
i. No contractors shall employ any person who is under the age of 12 years.
ii. No contractor shall employ donkeys or other animals with breaching of string
or thin rope. The breaching must be at lSouth three inches wide and should
be of tape (Nawar).
iii. No animal suffering from soves, lameness or emaciation or which immature
shall be employed on the work.
iv. The Executive Engineer or his agent is authorized to remove any person or
animal found working which does not satisfy those conditions and no
responsibility shall be accepted by the Vadodara Municipal Corporation for
any delay caused in the completion51 of the work by such removal.
v. The contractor shall pay fair and reasonable wages to the workmen
employed by him in the contract undertaken by him. In the event of any
dispute arising between the contractor and his workmen on the grounds that
the wages paid are not fair and reasonable the dispute shall be referred
without delay to the Executive Engineer, who shall decide the same. The
decision of the Executive Engineer shall be conclusive and binding on the
contractor, but such decision shall not in any way affect the condition in the
contract regarding the payment to be made by the Vadodara Municipal
Corporation at the sanctioned tender rates.
CLAUSE 35 : ACCEPTANCE OF CONDITIONS BEFORE TENDERING THE
Any contractor who does not accept these conditions shall not be allowed to
tender for works.
CLAUSE 36 : Taxes, Duties, etc.
The rates to be quoted by the contractor must be inclusive of excise, sales
tax,Insurance and all other taxes Excluding GST etc. present & future taxes be
included. No extra payments onthis account will be made to the contractor. GST
WILL BE PAID SEPARATELY AS PER GOVT.NORMS.
CLAUSE 37 : Defect Liability Period
The defect liability period shall be Five 5 year as per work from the date of
final completion and acceptance of work by Vadodara Municipal
Corporation. Contractor shall submit performance guarantee bond of 5%
amount of total work for period as prescribed format by Vadodara Municipal
Corporation. The bank guarantee of Nationalized bank shall be given for full
defect liability period at a time. During defect liability period, contractor shall
make good any defect whatsoever nature observed in different works,
equipment, or in part of work,plant or equipment by
modifying/replacing/repairing of such defective units or parts there at his own
cost within a period of three days on hearing from owner about such defect
during liability period. In case Vadodara Municipal Corporation may feel fit to
repair/rectify/modify such work without intimation incase of emergency/
importance of circumstances, the contractor is liable to pay all expences
incurred by Vadodara Municipal Corporation. In case if contractor’s failure
to do so, it will be got done by owner and entire cost shall be recovered from
contractor’s performance guarantee bond in the form of bank guarantee or
other dues with the company.
CLAUSE 38 : ERRORS AND OMMISSIONS
The contractor should take no advantage of any apparent error or omission
in drawings or specifications and the City Engineer should be permitted to
make such corrections and interpretations as necessary to fulfill the intent of
the plans and specifications. Alterations, omissions or correction in the
drawings, diagrams or sketches or specifications shall not constitute a case
for a claim of extra payment or extension of time by the contractor.
CLAUSE 39: INSURANCE AGAINST ACCIDENT ETC. TO WORKMEN
The contractor shall at his own expense carry and maintain insurance with
reputable Insurance Companies to his satisfaction but in no case Vadodara
Municipal Corporation will be responsible for any claim arise due to
inadequate amount and or improper provisions of insurance by the
contractor under the employees State Insurance Act, 1949. Workmen’s
compensation and Employer’s liability insurance, Contractor’s protective
liability insurance and any other insurance required under law or regulations
from time to time for this contract.
CLAUSE 40 : ADDITIONAL SAFETY CODE
The contractor shall provide all necessary safety provisions as indicated in
safety code given along with this tender.
CLAUSE 41 : FOSSILS ETC.
All fossils, coins, articles or value of antiquity and structure and other
remains or things of geological or archeological interest discovered on the
site shall as between the Vadodara Municipal Corporation and the
contractor be deemed to be absolute property of the Vadodara Municipal
CLAUSE 42 : PROGRAMME
The time allowed for execution of works shall be the essence of the contract.
The contract period shall commence from date of notice of intimation to
proceed. The tenderer at the time of submitting his tender shall indicate to
the construction schedule his program of execution of work commensurate
with the total time specified. The contractor shall provide the Engineer-in-
charge a detailed program of the time schedule for execution of the works in
accordance with the specifications and the completion date, the entire
program to be finalized by the contractor, has to confirm the execution period
mentioned along with the bill of quantities in the tender documents. The
Engineer-in-charge upon scrutiny of such submitted program by contractor,
shall examine suitability of it to the requirement of contract and suggest
modifications, if found necessary.
CLAUSE 43 : ALTERATION IN SPECIFICATION AND DESIGN AND EXTRA
A) The Engineer-in-charge shall have power to make any alteration in,
omission from, addition to, substitution for, the schedule of rates, the original
specifications, drawings, designs and instructions that may appear to him to
be necessary or advisable during the progress of work and the contractor
shall be bound to carry out such altered/extra/new items of work in
accordance with any instructions which may be given to him in writing signed
by Engineer-in-charge and such alteration omission, additions or
substitution shall not invalidate contract and any altered, addition or
substituted work shall be carried out by the contractor on the same
conditions of contract. The time for completion may be extended by
Engineer-in-charge as may be considered just and reasonable by him. The
rates for such addition, altered or substituted work shall be worked out as
a) If the rates for addition, altered or substituted work are specified in the
contract for work, the contractor is bound to carry out such work at the same
rates as specified in the contract.
b) If the rates for additional, altered or substituted work are not specifically
provided in the contract for the work, the rates will be derived from the rates
of similar items or works in the contract of work. The opinion of Engineer-in-
charge as to whether the rates can be reasonably so derived from the item
of contract will be final and binding to the contractor.
c) If the rates of altered, addition or substituted work can not be determined as
specified in (a) or (b) above, the rates shall be paid as per S.O.R. of
VADODARA MUNICIPAL CORPORATION/PWD in the same of order
preference. In absence of S.O.R., rate analysis approved by the City
Engineer shall be final.
d) If the rates of altered, addition or substituted work can not be determined as
specified in (a) or (b) or (c) above, the contractor shall within seven days of
the receipt of order to carry out the work inform the Engineer-in-charge of the
rate which he intends to charge for
such work supported by rate analysis and the Engineer-in-charge will
determine the rate on the basis of prevailing market rates of materials,
labour cost at schedule of labour plus 10% thereon as contractor’s
supervision overhead and profits. The opinion of Engineer-in-charge as to
market rate of materials and the quantity of labour involved per unit of
measurement will be final and binding on contractor.
But under no circumstances, the contractor suspends work on the plea of
non settlement of items falling under this clause.
CLAUSE 44 : TESTS FOR QUALITY OF WORK
1. The contractor shall be required to give satisfactory tests wherever required
and shall rectify the defects, if any free of cost. The necessary water, power,
labour etc. required for the h tests shall also be arranged by the contractor at
2. All workmanship shall be of the best kind described in the contract
documents and in accordance with the instructions of Engineer-in-charge
and shall be subjected from time to time to such tests at contractor cost as
the Engineer-in-charge may direct at the place of manufacture or fabrication
or on the site or at any such place. Contractor shall provide assistance,
instruments, labour and materials as are normally required for examining,
measuring and testing of any work or workmanship as may be selected and
required by Engineer-in-charge.
3. All tests necessary in connection with the execution of work as decided by
Engineer-in-charge shall be carried out at an approval laboratory at
contractor’s cost.
4. Contractor shall furnish the Engineer-in-charge for approval when requested
or if required by the specification, adequate samples of all materials and
furnished goods to be used in work sufficiently in advance to permit tests
and examination thereof. All materials furnished and finished goods applied
in work shall be exactly as per approved samples.
CLAUSE 45 : PROCEDURE FOR MEASUREMENT OF WORK IN
1. All measurements shall be in metric system. All the work in progress will be
jointly measured by the representative of Engineer-in-charge and
contractor’s authorized agent. Such arrangements will be got recorder in the
measurements book by the Engineer-in-charge or his authorized
representative and signed by the contractor or his authorized representative
and signed by the contractor or his authorized agent in token of acceptance.
If the contractor or his authorized agent fails to be present whenever
required by the Engineer-in-charge for taking measurements for any reasons
whatsoever, the measurement will be taken by the Engineer-in-charge or his
authorized representative not withstanding the absence of contractor and
these measurements will be deemed to be correct and binding on the
2. Contractor will submit a bill in approved proforma in duplicate to the
Engineer-in-charge of the work giving abstract and detail measurements of
various items executed during a months
55 as mutually agreed. The Engineer-
in-charge shall verify the bill and the claim, as far as admissible.
CLAUSE 46 : TAXES, DUTIES ETC.
1. Contractor agrees to and does hereby accept full and exclusive liability for
the payment of any and all taxes including sales-tax, duties, octroi or entry
tax etc. not or herein after imposed, increased or modified from time to time
in respect of work and materials and all contributions and taxes for
unemployment, compensation, insurance and old age pension or annuities
now or hereinafter imposed by the central or State Government authorities
with respect to or covered by the wages, salaries or other compensation paid
to the persons employed by contractor.
2. Contractor shall be responsible for compliance with all obligations and
restrictions imposed by the labour law or any other law affecting employed-
employee relationship.
3. Contractor further agree to comply and to secure the compliance of all sub-
contractor with applicable central, state, municipal and local laws and
regulations and requirement. Contractor also agrees to depend indemnify
and hold harmless the owner from any liability or penalty which may be
imposed by central, state or local authority by reasons any violation by
contractor or subcontractor of such laws, regulations or requirements and
also from all claims, suits or proceedings that may be brought against
owner arising under growing out of or by reasons of work provided for
by this contract by third parties or by central or State Government authority
or any administrative sub-division thereof.
4. At present there is no sales tax on work contract. Even if at later stage same
is imposed by Govt. the sales tax on work contract shall be borne by
5. The contractor shall pay royalty tax as per the rate decided by Government.
6. The contractor shall pay all taxes like sales, income tax, VAT, Service tax or
any other tax which are in force time to time. Vadodara Municipal
Corporation may not be any way hold responsible for any such taxes.
However Vadodara Municipal Corporation can ask to produce the tax
payment on the request from detail concern departments of Govt. or
Vadodara Municipal Corporation.
(A) In respect of all labour, directly or indirectly employed in the work for the
performance of contractor’s part of this agreement, the contractor shall at his
own expense arrange for all the safety provision as per safety code of
P.W.D. and hand book on construction safety practice SP-70-2001 and
building & other construction workers.
(Regulation of Employment & Condition of Services) Act 1996. The
contractor shall serve and abide by all fire and safety security rules and
regulations of the VADODARA MUNICIPAL
56 CORPORATION.
(B) First Aid and Injuries
1. Contractor shall maintain first aid facilities to his employees and those of his
sub-contractors.
2. Contractor shall make outside arrangement for ambulance service and for
the treatment of injuries. Names of those providing these services shall be
furnished to VADODARA MUNICIPAL CORPORATION prior to start of
construction and their telephone numbers shall be prominently displayed in
contractor’s field office.
3. All critical injuries shall be reported promptly to VADODARA MUNICIPAL
CORPORATION and copy of contractors report covering each personal
injury requiring the attention of a physician shall be furnished to VADODARA
MUNICIPAL CORPORATION.
( C ) Contractor’s Barricades
1. Contractor shall erect and maintain barricades required in connection with
his operation to guard or protect.
b) Hoisting Areas
c) Areas adjudged hazardous by contractor’s or VADODARA MUNICIPAL
CORPORATION’s inspectors.
1. VADODARA MUNICIPAL CORPORATION’s existing property
subjected to damage by ontractor’s operations.
2. Rail road unloading spot.
3. Contractor’s employees and those of his sub-contractors
shall become acquainted with VADODARA MUNICIPAL
CORPORATION’s barricading practice and shall respect the
provisions thereof.
3. Barricades and hazardous areas adjacent to but not located in normal
routes of travel shall be marked by red lanterns.
5. Contractor shall have to make all the arrangement to cover and
protect the equipments and panels stored at work site or installed
and which are likely to be damaged due to this work.
The contractor shall provide suitable scaffolds and working platforms,
gangways and stairways as per required.
All necessary personal safety equipments as considered adequate by the
Executive Engineer should be kept available for the use of persons
employed on the site and maintained in a condition suitable for immediate
use and the contractor should take adequate steps to ensure proper use of
equipment by those concerned as per the clause (30) of General Conditions
of the Contract. To ensure effectively enforcement of the rules and
regulations relating to safety precautions, the arrangements made by the
contractor shall be opened to inspection by the welfare officer, Safety
Engineer or Executive Engineer of the VADODARA MUNICIPAL
CORPORATION or their representatives.
VADODARA MUNICIPAL CORPORATION
Special Conditions
SPECIAL CONDITIONS OF CONTRACT
(A) Special conditions of contract shall be read in conjunction with General
Conditions of Contract Material and job Specifications, Drawings and other
documents forming part of this contract.
1. No remedy for action taken under this clause :
No action taken by the VADODARA MUNICIPAL CORPORATION
under the clause shall receive the contractor or any of his liabilities
under the contractor or give rise to any right to compensation,
extension of time or otherwise, failing which the owner shall have the
right to remove such sub-contactors from the site.
2. Inconvenience to the Public :
The contractor shall not deposit materials on any site which will cause
seriously inconvenience to the public. The Executive Engineer may
require the contractor to remove any material which are considered by
him to be a danger or inconvenience to the public or cause them to be
removed at the Contractor’s cost.
3. Approach Roads :
Contractors will be permitted to use the existing roads in the areas for
the purpose of transporting labourers and materials etc. The
VADODARA MUNICIPAL CORPORATION, however, will not
undertake to provide any approach road to the site of works. It shall
be entirely the
responsibility of the contractor to provide and maintain such temporary
roads at his own cost for the purpose of movement of men, materials,
and equipment. Layout of such approach roads shall be submitted to
the Executive Engineer for his approval before undertaking the
construction of the same.
4. Supply of Materials :
The contractor is required to keep himself in touch with the Deputy
Executive Engineer for the day-to-day position of supply of materials to
be supplied by owner, so as60to adjust the program of work accordingly
in advance to avoid his labour remaining idle on account of non-receipt
of materials. No claim of extra payment due to or arising form delay in
supplying the materials by the Owner shall be entertained, but a
reasonable extension of period of contractor may be considered if
found justified. This is specified in clause no. (14) of General
5. Water Supply to Contractors:
The contractors shall make his own arrangement of water required for
construction, site office and labour camp. Contractor shall make
arrangement for receiving, storage and distribution of water as per
established norms and practice. VADODARA MUNICIPAL
CORPORATION shall not entertain any claim of contractor for delays
resulting on account of inadequate or irregular water supply.
Certified plumbers should be employed by the contractor on the work
for all the temporary sanitary and plumbing works.
6. Contractors Stores and Site Office :
Suitable area near the site of work shall be allocated free of rent to the
contractor for storing his equipment plant, materials, etc. and for his
site office. If suitable site near site of work is not available, the
contractor should prepare its site office away from the site of the work
as per the direction of the Executive Engineer.
7. Supply of Plant and Equipment Materials and Labour
The contractor shall make his own arrangements to produce all
construction plant and equipment for his work. He shall also forward
along with tender a list of type and number of the equipment with their
capacities in good working condition which he will use at site to ensure
completion of the work in specified time.
All materials, construction plants and equipments, etc. once brought by
the contractor on the site are not to be removed from there without the
written authority from the Executive Engineer. Also, the contractor
shall have adequate stock of spare parts for the equipment on the site
and work shall not be delayed on this account. Similarly all enabling
work built by the contractor for the main construction undertaken by
him are not be dismantled and removed without the written authority
from the Executive Engineer. Thus contractor shall at his own
expenses supply and provide all the construction plant, temporary
works materials both for temporary and for permanent works, labour
(including the supervision thereof), transport to or from the site and in
and about the works and other 61 things of every kind required for the
construction, completion and maintenance of the works.
08. Rubbish and Clearance of Site :
The contractor shall clean away all rubbish, vegetation, roots, sods etc.
and dump them in the area indicated by the Executive Engineer and to
his satisfaction. No separate rate shall be allowed for the above. After
the work is completed and a group of structures handed over, the
contractor shall clear the area surrounding the work of all hutments,
temporary structure and excess stores and remnants of building
materials such as brickbats, sand, kapachi, timber, steel etc. at no
extra cost the VADODARA MUNICIPAL CORPORATION and land
brought to its original conditions.
09. Bench Marks
The contractor shall protect surveyor’s bench marks line marks and
base line marks from damage of movement during the work.
The contractors shall inspect the site of work and ascertain site
conditions and the nature of soil to be excavated.
11.Execution of Works :
The contractor is responsible for the correct execution of his work in
accordance with the drawings provided to him and for all mistakes due
to working to wrong levels or center lines. When levels, center lines
and bench marks of reference have been once given to him by the
Deputy Executive Engineer in writing, it is his responsibility to record,
protect and maintain the said marks, and to work to the same, and no
complains can afterwards be attended to for excess work done
inconsequence of such levels not having been kept up and maintained
by the Contractor.
12. The contractor shall obtain the permission of the Executive Engineer before
installation of fixed construction machineries, connections from pipelines,
locations of temporary buildings including labour camps and storage
materials, points of tapping electricity supply of connection. Also the
contractor shall not energize any approval of the Executive Engineer.
13. The work shall be carried out in such a manner as not to interfere with or
affect, retard or disturb the progress of other works being executes by other
14. The contractor shall submit to the Executive Engineer periodically as
required, information regarding the progress of work being carried out by
15. The contractor shall provide at his
62 own cost adequate closets and sanitary
accommodation for all his workman employed on the site. These shall be in
accordance with the rules and regulations of the owner. The lavatories and
sanitary accommodation shall be maintained in good sanitary, working and
disinfected conditions.
16. The contractor shall not allow any visitors on the works except with the
approval of the owner.
17. If the headquarters of the tenderer are elsewhere than in Baroda, he shall
have a duly authorized agent at site from the commencement of work until
completion of the building work as specified. Such agent shall be authorized
to act on behalf of the contractor, to accept services of notices under the
contract and agree to extra, omissions and varied items of work and rates
for the same. Such agent shall maintain on his staff a qualified engineer
and such other personnel as may be required for the efficient execution of
the work. Any notice under the contract shall be deemed to have been
serviced on the contractor is served upon such agent. The contractor to
carry out any rectification under the terms of the contractor after the work is
completed. The contractor shall have the same or another duly authorized
are using carried out. This is specified in clause no. (11) of General
18. The successful tenderer shall send a duly authorized competent
representative at his expenses to meet the City Engineer at his office
whenever called upon in writing to do so by the City Engineer and any
instructions, directions or explanations given by the City Engineer to such
representatives shall be held to have been given to the successful tenderer.
19. The contractor shall afford facilities to the Executive Engineer for a physical
check of such materials in stock in his godowns or at the site of work, as and
when desired by doing so the Executive Engineer.
20. During the progress of the construction work, if in the drawings, diagrams
and the sketches issued if any to the contractor for the purpose of execution
of work any omissions or inaccuracies are found by the contractor, he shall
bring the same forthwith to the notice of the Executive Engineer and get
them clarified immediately.
21. Metal,Brick bats,Sand,Yellow earth,stone dust, cement, steel, water,
machine/equipment man-power and any other material required for
construction shall be produced by contractor from open market. Contractor
shall identify potential sources of material and shall make arrangements for
adequate and time bound supply of these items. Contractor shall have to
get the supply sources and material approved by Deputy Executive
Engineer before bringing material to site. No extension of time shall be
granted for completion of work on account of delays resulting due to non-
availability of material, work, electricity
63 etc. at site.
22. Use of animals is prohibited.
23. Construction must keep on competent and experienced and qualified Civil
Engineer with experience or as directed by the City Engineer to get best
workmanship and day-to-day progress.
24. All the materials and the workmanship shall be the respective kind described
in the contract and in accordance with the Executive Engineer instructions
and shall be subjected from time to time, such tests as the Executive
Engineer may direct. The costs of such tests shall be borne by the
contractor. No extra claim will be entertained for the materials, transport,
labour, curing, preservation and supply of test samples of interests and size
and shape as directed by the Executive Engineer.
25. The contractor shall maintain an uptodate record register of the materials
issued to him, if any. One other register may also be kept showing the
quantum of work executed day-to-day together with materials particularly
cement used against each item.
26. A work order register which will also be called site instruction book will be
kept and maintained at site by contractor wherein the day-to-day instruction
may be noted down by the Dy.Executive Engineer or his subordinate in
charge of work. The violation of the instructions written by the Dy. Executive
Engineer or his subordinate in charge of the work will be severely viewed.
The obedience and strictly followed up of the instructions will be obligatory
on the part of the contractor.
27. The VADODARA MUNICIPAL CORPORATION shall also deduct from
running bills submitted by the contractor an amount equivalent as
applicable from time to time of the total amount of each of such running bills
applicable from time to time of the total amount of each of such running bills
towards income tax at source under the relevant provisions of Income Tax
28. The contractor shall indemnify the The contractor shall provide at his own
cost adequate closets and sanitary accommodation for all his workman
employed on the site. These shall be in accordance with the rules and
regulations of the owner. The lavatories and sanitary accommodation shall
be maintained in good sanitary, working and disinfected conditions.
29. and every member and officer and employees of the VADODARA
MUNICIPAL CORPORATION against 64 all the actions, claims, demands,
costs and expenses whatsoever arising out of or in connection with the
matter referred to in the above clause. The contractor shall be liable to
reimburse the VADODARA MUNICIPAL CORPORATION and keep
indemnify the employer in respect of all actions, claims, procedures,
demands, cost expenses which the VADODARA MUNICIPAL
CORPORATION may have to incure on account of default of the contractor
under the above clause.
30. The VADODARA MUNICIPAL CORPORATION will be entitled to deduct
from the bills to be paid to the contractor any sum or sums payable by the
contractors and which sum the VADODARA MUNICIPAL CORPORATION
in required to pay as a principle employer on account of default of the
contractor in respect of all liabilities referred to in above clause.
31. Force Majure
If the performance of the agreement arising out of the acceptance of
the tenderer, quotation of the tenderer by the VADODARA
MUNICIPAL CORPORATION, is prevented or delayed or interfered
with by any act of nature, wars, act of enemy, blockades, embargo,
insurrections, riots, political or commotions, strikes, lockouts, acts of
Government or other industrial disturbance, explosions or any
other cause whether enumerated or otherwise not within the
reasonable control of the tenderer or VADODARA MUNICIPAL
CORPORATION, all of which by the exercise of due diligence is
unable to foresee or overcome the Tenderer or the VADODARA
MUNICIPAL CORPORATION shall not be held responsible for the
non-performance of such agreement or prevention, delay interference
or suspension in the performance of such agreement any thereof
should bone or both the parties to such agreement be prevented from
fulfilling the contractual obligation by a state of force Majeure lasting
continuously for a period of three months, both the parties shall consult
with other regarding the future implementation of such agreement.
For the force Majeure that lasts for less than three months, the
agreement shall remain as it is and suitable period equipment to time
of force Majeure shall be added in to total time limit for performance of
33. Sole Arbitrator
Municipal Commissioner, VADODARA MUNICIPAL CORPORATION
shall be the sole Arbitrator. For any disputes & differences of any kind
arising out of or in connection with the contractor or the carrying out of
the works during the progress of the works or after their completion
shall be referred to & settled by Municipal Commissioner, VADODARA
MUNICIPAL CORPORATION. The decision of the Municipal
Commissioner shall be final & binding to both parties.
The contractor shall take full responsibility for loss damages and the
care plant and works until it is delivered to site, erected, commissioned
and taken over by the owner. Without limiting such responsibility, the
contractor shall, in the joint names of the contractor and the owner, to
protect himself and the interest of the owner, insure the plant and each
part thereof for their full value until they have been taken over.
The contractor alone
has to bear the premium / other expenditure for such insurance. Such
insurance shall cover the equipment against loss, damages or
destruction by fire, lighting, earthquake, thefts, perils of the sea of by
any cause whatsoever, throughout the duration of the contract. The
contractor shall deposit the policy or policies and receipts for the
premium paid with the owner. All money received under any policy
shall be applied in or towards the replacement and repair of the loss or
damage. The insurance must include provision for payment of foreign
currency as may be necessary in respect of any claim.
The work specified in the Tender for works expires taking into consideration the
extension of time, if any, for completion of the work, granted under
the relevant clause of the conditions of the contract in cases other
than those where such extension as necessitated on account of
default of the contractor. The decision of the City Engineer as
regards the Operative period of the contract, shall be final and
binding on the contractor.
List of Key Personnel to be deployed on Contract
Work (Reference Cl. 4.5.4)
# Employment of a qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during the
execution of this work as under: -
1. Two graduate Civil Engineers and three diploma Civil Engineers when
cost of the work to be executed is more than Rs.50 lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the
work to be executed is more than Rs.15 lakhs but less than Rs.50
3. Minimum one Diploma Civil Engineer when the cost of work is less
than Rs.15 lakhs but more than Rs.5 lakhs.
4. Minimum two Diploma Civil Engineers for the work when the cost of
work to be executed is less than Rs. 5 lakhs. The Engineer so
employed for the Government work must have sufficient experience to
handle the work independently. Such an Engineer shall have to stay at
the site of work and he shall not be entrusted with other duty except
In case the contractor or partner of the contractor firm is a Civil
Graduate Engineer, Employment of a separate Engineer will not be
necessary provided that the Engineer partner himself attends the
execution of the work on the site.
Within 15 days of issue of work-order the Contractor will have to
furnish to the Deputy Executive Engineer-in-charge of the work the
Name, Qualifications, copy of marksheet, Colour Photograph and the
appointment order issued such engineers engaged for this contract
work. If 15 days after issue of work order such designated Site
Engineers do not resume or do not remain present on site of work, the
recovery at the rate of Rs.15,000-00 per month per Engineer will be
made from the bills/deposit/dues of the contractor. Such recovery shall
be non-refundable.
એફ ડવીટ તથા મા લક સાથે ુ ં MOU ર ુ સમયમયાદા માટ ર ૂ કરવા ુ રહશે,
ર ુ ં MOU યાં ુ ી રટ
મા યતા રહશે નો પણ ઉ લેખ કરવાનો રહશે. એફ ડવીટ તથા મા લક સાથે ુ ં MOU નો PERFORMA વડોદરા
વપરાશ અ વયે જો MOU
૮. સદર કામે ઇ રદાર પેશી ફકશનમાં જણા યા ુ બનો બી ુ મીન સરકાર મા ય સં થા IOCL (આઇ.ઓ.સી.એલ) HPCL
(એચ.પી.સી.એલ), BPCL(બી.પી.સી.એલ). માંથી લાવવાનો રહશે . તથા IOCL (આઇ.ઓ.સી.એલ) HPCL
(એચ.પી.સી.એલ), BPCL(બી.પી.સી.એલ), માંથી મેળવેલ બી ુ મન ગેના ુ બલ તથા ટ ટ ગની ખાતામાં ખાતર
Bitumen Rate- ૦૧-૧૦-૨૦૨૬ થી ૧૫-૧૦-૨૦૨૬ Rs. ૮૪,૬૫૨.૦૦ Per Mt ને બેઝ રટ ગણીને ટાર રટ
૩૬. ઇ રદાર તે કામ શ કરતા પહલા DBM તથા B.C. ની આઇટમ માટ સરકાર ક સરકાર મા ય લેબોરટર પાસે મી
૩૭. ઇ રદાર કરલ કામોમા સરકાર/વી.એમ.સી .મા ય સં થા અથવા R.I.T.E.S/ C.E.I.L./ WAPCOS / G.E.R.I.
૪૧. ઇ રદાર પોતાના બેચમી લા ટ માં દખરખ હ ુ સંદભ ફર યાત SCADA AUTOMATION PROJECT SYSTEM
વ.મ.પા.ના અિધકાર /કમચાર , થડ પાટ ઇ સપેકશન ના િતિનધી SCADA AUTOMATION PROJECT SYSTEM
૪૩. ઇ રદાર પાસે પોતાની મા લક ુ ં કો ડ મીલ ગ મશીન (COLD MILLING MACHINE) હો ુ જોઇએ
અથવા જો ઈ રદાર પાસે પોતાની પોતાની માલીક ુ કો ડ મીલ ગ મશીન (COLD MILLING
MACHINE) ન હોઇ તો ઈ રદાર કો ડ મીલ ગ મશીન (COLD MILLING MACHINE) વતં
મા લક સાથે ુ ં MOU રુ ર
VADODARA MUNICIPAL CORPORATION
TECHNICAL SPECIFICATION
SPECIFICATION OF BITUMINOUS AND OTHER WORK
501 GENERAL REQUIREMENTS FOR BITUMINOUS PAVEMENT LAYERS
Bituminous pavement courses shall be made using the materials described in the
Specifications.
The use of machinery and equipment mentioned in various Clauses of these Specifications is
mandatory. Details of the machinery and equipment are available in the Manual for Construction
and Supervision of Bituminous Works. The equipment mandatory for any particular project
shall be in accordance with the Contract Specifications for that project.
501.2 Materials
The binder shall be an appropriate type of bituminous material complying with the relevant
Indian Standard, as defined in the appropriate Clauses of these Specifications, or as
otherwise specified herein. The choice of binder shall be stipulated in the Contract or by
the Engineer. Where viscosity grades of bitumen are specified, they are referred to by a
designation in accordance with IS:73. Where modified bitumen is specified, it shall conform to
the requirements of IRC:SP:53 and IS:15462; and the following provision of this Specification
i) Modified bitumen from refinery sources or blended at approved central
plant or at site using appropriate industrial process and plant with high
shear mill, and testing facilities to achieve stable and homogenous mix
shall be used. The use of high shear mixer or any other device capable
of producing a homogeneous blend is essential when the modifier is in
ii) Transportation tanks and storage tanks shall be insulated and equipped
with effective heating system and circulation/ agitating device to maintain
the specified temperature, homogeneity and viscosity of the bitumen
during transit and storage.
iii) Separation, difference in softening point (R&B), shall not be more than
3ºC for any type of specified modified bitumen when tested as per
Annex B of IS:15462.
Selection criteria for viscosity grade bitumen, based on highest and lowest daily mean
temperatures at a particular site, are given in Table 500-1.
Selection criteria for modified bitumen shall be in accordance with IRC:SP:53.
Table Table500-1:SelectionCriteriaforViscosity-
Graded(VG)PavingBitumensBased
LowestDailyMeanAirT HighestDailyMeanAirTemperature,ºC
emperature,°C Lessthan 20°C 20to 30°C Morethan 30°C
Morethan –10ºC VG-10 VG-20 VG-30
-10ºCor lower VG-10 VG-10 VG-20
Both the highest daily mean air temperature and the lowest daily mean air temperatures
mentioned in Tables 500-5 and 500-6 can be obtained for the weather station nearest to
the project site from the Indian Meteorological Organization (IMO). This daily mean high
temperature on a specific day is the same as daily “normal” high temperature for that
day as usually reported in some newspapers. The highest of the 365 daily mean high air
temperatures (which usually occurs on some day in May or June) is used in Tables 500-5 and
500-6. Likewise, the lowest daily mean air temperature (which usually occurs on some day in
January) can also be obtained from the IMO. Since these are mean temperatures based on
the average of 30-40 years data, these temperatures are significantly lower than the absolute
maximum temperatures, which may have occurred in a specific year.
501.2.2 Coarse Aggregates
The coarse aggregates shall consist of crushed rock, crushed gravel or other hard material
retained on the 2.36 mm sieve. They shall be clean, hard, durable, of cubical shape, free from
dust and soft or friable matter, organic or other deleterious matter. Where the Contractor’s
selected source of aggregates has poor affinity for bitumen, the Contractor shall demonstrate
through test results that with the use of anti-stripping agents, the stripping value is improved
to satisfy the specification requirements. The Engineer may approve such a source and, as
a condition for the approval of that source, the bitumen shall be treated with approved
antistrippingagents, as per the manufacturer’s recommendations, at the cost of the Contractor.
Where crushed gravel is proposed for use as aggregate not less than 90 percent by weight
of the crushed material retained on the 4.75 mm sieve shall have at least two fractured
faces, except that in the case of bituminous concrete the requirement in this regard shall be
The aggregates shall satisfy the physical requirements set forth in the individual relevant
clause for the material.
501.2.3 Fine Aggregates
Fine aggregates shall consist of crushed or naturally occurring material, or a combination of
the two, passing 2.36 mm sieve and retained on the 75 micron sieve. They shall be cleanhard,
durable, dry and free from dust, and soft or friable matter, organic or other deleterious
matter. Natural sand shall not be allowed in binder and wearing courses. However, natural
sand upto 50 percent of the fine aggregates may be allowed in base courses. Fine aggregates
shall have a sand equivalent value of not less than 50 when tested in accordance with the
requirement of IS:2720 (Part 37). The plasticity index of the fraction passing 0.425 mm shall
not exceed 4 when tested in accordance with IS:2720 (Part 5). The fine aggregates shall
satisfy the physical requirements set forth in the individual relevant-clause for the material in
501.2.4 Sources of Material
The sources of materials proposed to be used by the Contractor shall be tested to the
satisfaction of the Engineer who shall give the necessary approval. The Engineer may from
time to time withdraw approval of a specific source, or attach conditions to the existing
approval. Any change in aggregate source for bituminous mixes shall require a new mix
design, and laying trials, where the mix is based on a job mix design. Stockpiles from different
sources, approved or otherwise, shall be kept separate, such that there is no contamination
between one material and another. Each source submitted for approval shall contain material
sufficient for at least 5 days’ work.
Pre-mixed bituminous materials shall be prepared in a hot mix plant of adequate capacity and
capable of yielding a mix of proper and uniform quality with thoroughly coated aggregates.
Appropriate mixing temperatures are given in Table 500-2 of these Specifications. the
difference in temperature between the binder and aggregate shall at no time exceed 14ºC. In
order to ensure uniform quality of the mix and better coating of aggregates, the hot mix plant
shall be calibrated from time to time. The essential features of the hot mix plants are given in
Annex A of IRC:27.
2:Mixing,LayingandRollingTemperaturesforBit
uminousMixes (DegreeCelcius)
BitumenVis BitumenT Aggregate MixedMateri LayingTe *RollingTe
cosityGrade emperature Temperature alTemperatu mperature mperature
Rollingmust be completed before the mat cools to these minimum temperatures
If a continuous type mixing plant is used, the Contractor must demonstrate by laboratory
analysis that the cold feed combined grading is within the grading limits specified for that
bituminous bound material. In the case of a designed job mix, the bitumen and filler content
shall be derived using this combined grading.
501.4 Transporting
Bituminous materials shall be transported in clean insulated and covered vehicles. An asphalt
release agent, such as soap or lime water, may be applied to the interior of the vehicle to
prevent sticking and to facilitate discharge of the material.
501.5.1 Weather and Seasonal Limitations
Laying shall be suspended:
i) In presence of standing water on the surface;
ii) When rain is imminent, and during rains, fog or dust storm;
iii) When the base/binder course is damp;
iv) When the air temperature on the surface on which it is to be laid is less
than 10ºC for mixes with conventional bitumen and is less than 15ºC for
mixes with modified bitumen;
v) When the wind speed at any temperature exceeds the 40 km per hour
501.5.2 Cleaning of Surface
The surface on which the bituminous work is to be laid shall be cleaned of all loose and
extraneous matter by means of a mechanical broom and air jet. The equipment for applying
a high pressure air jet from a compressor to remove dust or loose matter shall be available
full time at the site.
501.5.3 Spreading
Prior to spreading the mix, the base shall be prepared by carrying out the required operations
as per Clause 501.8 depending upon the site conditions. Except in areas where paver cannot
get access, bituminous materials shall be spread, levelled and tamped by an approved
selfpropelledpaving machine equipped with an electronic sensing device. The essential
featuresof the paver finisher shall conform to Annex A of IRC:27. As soon as possible after
arrivalat site, the materials shall be supplied continuously to the paver and laid without delay.
The rate of delivery of material to the paver shall be regulated to enable the paver to operate
continuously. The travel rate of the paver, and its method of operations, shall be adjusted
to ensure an even and uniform flow of bituminous material across the screed, free from
dragging, tearing and segregation of the material. In areas with restricted space (such as
confined space, foot ways, of irregular shape and varying thickness, approaches to expansion
joints, etc.) where paver cannot be used, the material shall be spread, raked and levelled with
suitable hand tools by trained staff.
The minimum thickness of material laid in each paver pass shall be in accordance with
the minimum values given in the relevant parts of these Specifications. When laying binder
course or wearing course approaching an expansion joint of a structure, machine laying
shall stop 300 mm short of the joint. The remainder of the pavement up to the joint, and the
corresponding area beyond it, shall be laid by hand, and the joint or joint cavity shall be kept
clear of surfacing material.
Bituminous material, with a temperature greater than 145°C, shall not be laid or deposited
on bridge deck water-proofing systems, unless77precautions against heat damage have been
approved by the Engineer.
501.5.4 Cleanliness and Overlaying
Bituminous material shall be kept clean and uncontaminated. The only traffic permitted to run
on bituminous material to be overlaid shall be that engaged in laying and compacting the next
course or, where a binder course is to be sealed or surface dressed, that engaged on such
surface treatment. Should any bituminous material become contaminated, the Contractor
shall make it good to the satisfaction of the Engineer, in compliance with Clause 501.8.
Binder course material shall be covered by either the wearing course or surface treatment,
whichever is specified in the Contract.
501.6 Compaction
Bituminous materials shall be laid and compacted in layers, which enable the specified
thickness, surface level, regularity requirements and compaction to be achieved.
Compaction of bituminous materials shall commence as soon as possible after laying.
Compaction shall be substantially completed before the temperature falls below the minimum
rolling temperatures stated in the relevant part of these Specifications. Rolling of the
longitudinal joints shall be done immediately behind the paving operation. After this, rolling
shall commence at the edges and progress towards the center longitudinally except that on
super-elevated and unidirectionally cambered portions, it shall progress from the lower to the
upper edge parallel to the center line of the pavement. Rolling shall continue until all roller
marks have been removed from the surface. All deficiencies in the surface after laying shall be
made good by the attendants behind the paver, before initial rolling is commenced. The
initial or breakdown rolling shall be done with 8–10 tonne static weight smooth-wheel rollers.
The intermediate rolling shall be done with 8–10 tonne static weight or vibratory roller or with
a pneumatic tyre roller of 12 to 15 tonne weight, with a tyre pressure of at least 0.56 MPa.
The Contractor shall demonstrate the efficiency of the equipment proposed to be used by
carrying compaction trials. The procedure for site trials shall be submitted to the Engineer
for approval. The finish rolling shall be done with 6 to 8 tonne smooth wheel tandem rollers.
Rolling shall continue until the specified compaction is achieved.
Where compaction is to be determined by density of cores, the requirements to prove the
performance of rollers shall apply in order to demonstrate that the specified density can be
achieved. In such cases the Contractor shall specify the plant, and the method by which he
intends to achieve the specified level of compaction and finish at temperatures above the
minimum specified rolling temperature. Laying trials shall then demonstrate the acceptability
of the plant and method used.
Bituminous materials shall be rolled in a longitudinal direction, with the driven rolls nearest
the paver. The roller shall first compact material adjacent to joints and then work from the
lower to the upper side of the layer, overlapping on successive passes by at least one-third of
the width of the rear roll or, in the case of a pneumatic-tyred roller, at least the nominal width
In portions with super-elevated and unidirectional camber, after the edge has been rolled, the
roller shall progress from the lower to the upper edge.
Rollers should move at a speed of not more than 5 km per hour. The roller shall not be permitted
to stand on pavement which has not been fully compacted, and necessary precautions shall
be taken to prevent dropping of oil, grease, petrol/ diesel or other foreign matter on the
pavement either when the rollers are operating or standing. The wheels of roller machine
shall be in good working order, to prevent the mix from adhering to the wheels. Only sufficient
moisture to prevent adhesion between the wheels of rollers and the mix should be used.
Surplus water shall not be allowed to stand on the partially compacted pavement.
501.7.1 Where joints are made, the material shall be fully compacted and the joint
made flush in one of the following ways:
a) All joints shall be cut vertical to the full thickness of the previously laid
mix. All loosened material shall be discarded and the vertical face
coated with a suitable viscosity grade hot bitumen, or cold applied
emulsified bitumen. While spreading the material along the joint the
material spread shall overlap 25 mm to 50 mm on the previously laid
mix beyond the vertical face of the joint. The thickness of the loose
overlap material should be approximately a quarter more than the final
compacted thickness. The overlapped mix shall be dragged back to the
hot lane so that the roller can press the small excess into the hot side
of the joint to obtain a high joint density.
b) By using two or more pavers operating in echelon, where this is
practicable and in sufficient proximity for adjacent widths to be fully
compacted by continuous rolling.
501.7.2 All longitudinal joints shall be offset at least 300 mm from parallel joints in the
layer beneath or as directed, and in a layout approved by the Engineer. Joints in the wearing
course shall coincide with either the lane edge or the lane marking, whichever is appropriate.
Longitudinal joints shall not be situated in wheel track zones.
501.7.3 For transverse joints method a) above shall apply. Transverse joints in the
successive and adjoining layers shall have a minimum offset of 2 m.
DETAIL SPECIFICATIONS OF BITUMINOUS ITEMS
Providing and laying of average 65mm compacted /as suggested compacted thickness
dense bitumen macadam carpet using coarse aggreagete/fine aggregate/filler as per
required gradiation, applying tack coat at the rate of 3 Kg/10 Sq.mt. And using asphalt
VG-40 Vsicocity grade 4% by wt. of mix and mixing by BATCHMIX process spreading by
paver finisher and flushing Quarry dust on B.T. surface at the rate of 0.75 CM/100 Sq.Mt.
including consolidtion etc. complete by using Sevaliya , Timba area Quarry Material. (As
per M.O.R.T.H.)
505 DENSE BITUMINOUS MACADAM
The specification describes the design and construction procedure for Dense
BituminousMacadam, (DBM), for use mainly, but not exclusively, in base/binder and profile
correctivecourses. The work shall consist of construction in a single or multiple layers of
DBM on apreviously prepared base or sub-base. The thickness of a single layer shall be
505.2 Materials
505.2.1 Bitumen
The bitumen shall be viscosity grade paving bitumen complying with the Indian
StandardSpecificationIS:73,modifiedbitumencomplyingwithClause501.2.1orasotherwisespe
cifiedinthe Contract.
ThetypeandgradeofbitumentobeusedshallbespecifiedintheContract.
Requirments for Paving Bitumen (As per IS:73:2006)
SI. Characteristics Paving Grades Methods of Test Ref.to IS
i) Absolute viscosity at 600 C, Poises,Min. 3200-4800 IS 1206 (Part 2)
ii) Kinematic viscosity at 1350C cst,Min. 400 IS 1206 (Part 3)
iii) Flash Point. 220 IS 1448 p.69
(Cleveland Open up), 0C Min.
iv) Solubility in 99.0 IS
Trichloroethylene,percent,Min.
v) Penetration at 250C, 100g, 5s,0.1mm 35 IS
vi) Softening point (R&B), 0C Min. 50 IS
vii) Test on residue from thin firlm oven
a) Viscosity ratio at 600C, Max. 4.0 IS 1206 (Part 2)
b) Ductility at 250C,cm,Min, after thin- 25 IS
film oven test.
505.2.2 Coarse Aggregates
The coarse aggregates shall consist of crushed rock, crushed gravel or other hard
materialretainedon2.36mmsieve.Theyshallbeclean,hard,durable,ofcubicalshape,freefromdustand
soft or friable matter, organic or other deleterious substances. Where the
Contractor’sselectedsourceofaggregateshaspooraffinityforbitumen,theContractorshallproducetes
tresultsthatwiththeuseofanti-
strippingagents,thestrippingvalueisimprovedtosatisfythespecificationrequirements.TheEngineerm
ayapprovesuchasourceandasaconditionforthe approval of that source, the bitumen shall be treated
with an approved anti-stripping agent,as per the manufacturer’s recommendations, at the cost of
the Contractor. The aggregatesshallsatisfythe requirementsspecified inTable500-8.
Wherecrushedgravelisproposedforuseasaggregate,notlessthan90percentbyweightof
thecrushed material retained on the 4.75 mm sieve shall have at least two fracturedfaces.
505.2.3 Fine Aggregates
Fineaggregatesshallconsistofcrushedornaturallyoccurringmineralmaterial,oracombination of
the two, passing the 2.36 mm sieve and retained on the 75 micron
sieve.Theseshallbeclean,hard,durable,dryandfreefromdust,andsoftorfriablematter,organicor
other deleterious matter. Natural sand shall not be allowed in binder courses.
However,naturalsandupto50percentofthefineaggregatemaybeallowedinbasecourses.Thefin
eaggregateshallhaveasandequivalentvalueofnotlessthan50whentestedinaccordancewithther
equirementofIS:2720(Part37).Theplasticityindexofthefractionpassingthe
0.425mm sieve shall not exceed 4, when tested in accordance with IS:2720 (Part 5).
Filter shall consist of finely divided mineral matter such as rock dust, hydrated lime
orcement approved by the Engineer. The filler shall be graded within the limits indicated
ThefillershallbefreefromorganicimpuritiesandhaveaplasticityIndexnotgreaterthan 4. The
Plasticity Index requirement shall not apply if filler is cement or lime. Where
theaggregatesfailtomeettherequirementsofthewatersensitivitytestinTable500-
8,then2percentbytotalweightofaggregate,ofhydratedlimeshallbeusedandpercentageoffineag
gregatereduced accordingly.
505.2.5 A ggregate Grading and Binder Content
505.2.5.1 When tested in accordance with IS:2386 Part 1 (wet sieving method),
thecombinedgradingofthecoarseandfineaggregatesandfillerfortheparticularmixtureshallfall within
the limits given in Table 500-10 for grading 1 or 2 as specified in the Contract. Toavoid gap
grading, the combined aggregate gradation shall not vary from the lower limit ononesieve to
higher limit on the adjacent sieve.
Table500-8:PhysicalRequirementsforCoarseAggregateforDenseBituminousMacadam
Property Test Specification MethodofTest
Cleanliness(dust) Grainsize analysis Max5% passing IS:2386Part I
Particleshape CombinedFlakinessand Max35% IS:2386Part I
ElongationIndices*
Strength LosAngelesAbrasionValue Max35% IS:2386Part IV
AggregateImpactValue Max27%
Durability Soundness either Max12% IS:2386Part V
:SodiumSulphate or
MagnesiumSulphate Max18%
WaterAbsorption WaterAbsorption Max2% IS:2386 Part III
Stripping Coatingand Stripping of Minimum IS:6241
BitumenAggregate Mix retainedcoatin
WaterSensitivity Retained Tensile Min.80% AASHTO283
* To determine this combined proportion, the flaky stone from a representative
sampleshould first be separated out. Flakiness index is weight of flaky stone metal
byweightofstonesample.Onlytheelongatedparticlesbeseparatedoutfromtheremaining(non
-flaky) stone metal. Elongation index is weight of elongated particles divided by totalnon-
flakyparticles.Thevaluesofflakinessindexandelongationindexsofoundareaddedup.
** If the minimum retained tensile test strength falls below 80 percent, use of anti
strippingagent isrecommended to meet the requirement.
Table500-9:Grading Requirements for Mineral Filler
ISsieve (mm) CumulativePercentPassingbyWeightofTotalAggregate
Table500-10:CompositionofDenseGradedBituminousMacadam
Nominal aggregatesize* 37.5mm 26.5mm
Layerthickness 75– 100 mm 50– 75 mm
ISSieve1(mm) Cumulative % by weight of total aggregate passing
Bitumencontent %bymass Min4.0** Min4.5**
* Thenominal maximum particle size is the largest specified sieve size upon which
any oftheaggregate is retained.
Correspondstospecificgravityofaggregatesbeing2.7.Incaseaggregatehavespecifi
cgravity more than 2.7, the minimum bitumen content can be reduced
proportionately.Further the region where highest daily mean air temperature is
30ºC or lower and lowestdailyairtemperatureis–
10ºCorlower,thebitumencontentmaybeincreasedby
505.2.5.2 BitumencontentindicatedinTable500-10istheminimumquantity.The
quantityshall be determined in accordance with Clause 505.3.
505.3 Mix Design
ThebitumencontentrequiredshallbedeterminedfollowingtheMarshallmixdesignprocedurecont
ained inAsphalt Institute Manual MS–2.
TheFinestoBitumen(F/B) ratiobyweightoftotalmixshallrange from0.6to1.2.
505.3.1 Requirements for the Mix
Apartfromconformitywiththegradingandqualityrequirementsforindividualingredients,themixtur
eshallmeettherequirements setoutinTable 500-11.
Table500-11:RequirementsforDenseGradedBituminousMacadam
Properties ViscosityGra Modified bitumen TestMethod
Hot climate Cold climate
Compactionlevel 75blows on each face of the specimen
Minimum stability (kN 9.0 12.0 10.0 AASHTOT245
Marshall flow (mm) 2– 4 2.5– 4 3.5– 5 AASHTOT245
MarshallQuotient 2– 5 2.5– 5 MS-2
%VoidsFilledwith 65–
Coating of 95%minimum IS:6241
TensileStrengthratio 80%Minimum AASHTOT283
%VoidsinMineralA Minimum percent voids in mineral aggregate
ggregate(VMA) (VMA)aresetoutinTable500-13
505.3.2 Binder Content
The binder content shall be optimized to achieve the requirements of the mix set out
inTable 500-11. The binder content shall be selected to obtain 4 percent air voids in the
mixdesign. The Marshall method for determining the optimum binder content shall be
adoptedas describedin theAsphalt Institute Manual MS-2.
Wheremaximumsizeoftheaggregateismorethan26.5mm,themodifiedMarshallmethodusing
150 mm diametre specimen described in MS-2 and ASTM D 5581 shall be used.
Thismethod requires modified equipment and procedures. When the modified Marshall test
isused,thespecifiedminimumstabilityvaluesinTable500-
12shallbemultipliedby2.25,andtheminimum flow shall be3mm.
Table500-12:MinimumPercentVoidsInMineralAggregate(VMA)
Nominal MinimumVMAPercentRelatedtoD
MaximumParticleS esignPercentageAir voids
Note: Interpolateminimumvoidsinthemineralaggregate(VMA)fordesignedpercentageairvoids
valuesbetween those listed.
505.3.3 Job Mix Formula
TheContractorshallsubmittotheEngineerforapprovalatleast21daysbeforethestartthe
work,thejobmixformulaproposedforuseintheworks,togetherwiththefollowingdetails:
i) Sourceandlocationofallmaterials;
ii) Proportionsof all materials expressed as follows:
a) Bindertype,andpercentagebyweightoftotalmix;
b) Coarse aggregate/Fine aggregate/Mineral filler as percentage
byweightoftotal aggregateincludingmineral filler;
iii) Asingledefinitepercentagepassingeachsieveforthemixedaggregate;
iv) Theindividualgradingsoftheindividualaggregatefraction,andthe
proportionofeachinthecombinedgrading;
v) The results of mix design such as maximum specific gravity of
loosemix (Gmm), compacted specimen densities, Marshall
stability,flow,
airvoids,VMA,VFBandrelatedgraphsandtestresultsofAASHTOT283Moi
sture susceptibility test;
vi) Wherethemixerisabatchmixer,theindividualweightsofeachtypeofaggreg
ate,andbinderperbatch;
vii) Testresultsofphysicalcharacteristicsofaggregatestobeused;
viii) Mixingtemperature and compacting temperature.
While establishing the job mix formula, the Contractor shall ensure that it is based on
acorrectandtrulyrepresentativesampleofthematerialsthatwillactuallybeusedintheworkand
that the mix and its different ingredients satisfy the physical and strength
requirementsoftheseSpecifications.
Approval of the job mix formula shall be based on independent testing by the Engineer
forwhich samples of all ingredients of the mix shall be furnished by the Contractor as
requiredbythe Engineer.
The approved job mix formula shall remain effective unless and until a revised Job
MixFormulaisapproved.Shouldachangeinthesourceofmaterialsbeproposed,anewjobmixform
ulashallbeforwardedbytheContractortotheEngineerforapprovalbeforetheplacingof the
505.3.4 Plant Trials – Permissible Variation in Job Mix Formula
Oncethelaboratoryjobmixformulaisapproved,theContractorshallcarryoutplanttrialstoestablish
thattheplantcanproduceauniformmixconformingtotheapprovedjob mix formula. The
permissible variations of the individual percentages of the variousingredients in the actual
mix from the job mix formula to be used shall be within the limits asspecified in Table 500-
13 and shall remain within the gradation band. These variations areintended to apply to
individual specimens taken for quality control tests in accordance withSection
Table500-13:PermissibleVariationsintheActualMixfromtheJobMixFormula
Description Base/binderCourse
Aggregatepassing 19 mm sieve or larger ±8%
Aggregatepassing 13.2 mm, 9.5 mm ±7%
Aggregatepassing 4.75 mm ±6%
Aggregatepassing 2.36 mm, 1.18 mm, 0.6 mm ±5%
Aggregatepassing 0.3 mm, 0.15 mm ±4%
Aggregatepassing 0.075 mm ±2%
Binder content ±0.3%
Mixingtemperature ±10°C
505.3.5 Laying Trials
Once the plant trials have been successfully completed and approved, the Contractor
shallcarry out laying trials, to demonstrate that the proposed mix can be successfully laid
andcompactedallinaccordancewithClause501.Thelayingtrialshallbecarriedoutona
suitableareawhichisnottoformpartoftheworks.Theareaofthelayingtrialsshallbea minimum of
100 sq.m of construction similar to that of the project road, and it shall be inall respects,
particularly compaction, the same as the project construction, on which thebituminous
materialis to be laid.
The Contractor shall previously inform the Engineer of the proposed method for laying
andcompacting the material. The plant trials shall then establish if the proposed laying
plant,compactionplant,andmethodologyiscapableofproducingsatisfactoryresults.Thedensityo
fthefinishedpavinglayershallbedeterminedbytakingcores,nosoonerthan24hoursafterlaying, or
by other approved method. The compacted layers of Dense Graded
BituminousMacadam(DBM)shallhaveaminimumfielddensityequaltoormorethan92%oftheden
based on theoretical maximum specific gravity
86 (Gmm) obtained on the day of compaction
inaccordance withASTMD
Oncethelayingtrialshavebeenapproved,thesameplantandmethodologyshallbeappliedto the
laying of the material on the project, and no variation of either shall be acceptable,unless
approved in writing by the Engineer, who may at his discretion require further layingtrials.
505.4 Construction Operations
505.4.1 Weather and Seasonal Limitations
TheprovisionsofClause501.5.1shallapply.
505.4.2 Preparation of Base
ThebaseonwhichDenseGradedBituminousMaterialistobelaidshallbepreparedinaccordancewith
Clauses501and902asappropriate,orasdirectedbytheEngineer.
505.4.3 Geosynthetics
WhereGeosyntheticsarespecifiedintheContract,thisshallbeinaccordancewiththerequirementsst
505.4.4 Stress Absorbing Layer
Where a stress absorbing layer is specified in the Contract, this shall be applied in
accordancewith the requirements of Clause
505.4.5 Prime Coat
Where the material on which the dense bituminous macadam is to be laid is other than abitumen
bound layer, a prime coat shall be applied, as specified, in accordance with theprovisions of
Clause 502, or as directed by the Engineer.
505.4.6 Tack Coat
Where the material on which the dense bituminous macadam is to be laid is either
bitumenbound layer or primed granular layer, tack coat shall be applied, as specified, in
accordancewith the provisions of Clause 503, or as directed by the Engineer.
The work shall consist of the application of a single coat of low viscosity liquid
bituminousmaterial to existing bituminous, cement concrete or primed granular surface
preparatory tothe superimposition of a bituminous mix, when specified in the Contract or as
instructed bythe Engineer. The work shall be carried out on a previously repared surface in
accordancewith Clause 501.8.
503.2 Materials
The binder used for tack coat shall be either Cationic bitumen emulsion (RS 1) complyingwith
IS:8887 or suitable low viscosity paving bitumen of VG 10 grade conforming to IS:73.The use of
cutback bitumen RC:70 as per IS:217 shall be restricted only for sites at sub-zerotemperatures
or for emergency applications as directed by the Engineer. The type and gradeof binder for tack
coat shall be as specified in the Contract or as directed by the Engineer.
503.3 Weather and Seasonal Limitations
Bituminous material shall not be applied during a dust storm or when the weather is foggy,rainy
or windy or when the temperature in the shade is less than 10°C. Where the tack coat consists
of emulsion, the surface shall be slightly damp, but not wet. Where the tack coat isof cutback
bitumen, the surface shall be dry.
503.4 Construction
503.4.1 Equipment
The tack coat shall be applied by a self-propelled or towed bitumen pressure sprayer,
equippedfor spraying the material uniformly at a specified rate. Hand spraying shall not be
permittedexcept in small areas, inaccessible to the distributor, or narrow strips, shall be sprayed
witha pressure hand sprayer, or as directed by the Engineer.
503.4.2 Preparation of Base
The surface on which the tack coat is to be applied shall be clean and free from dust, dirt,
andany extraneous material, and be otherwise prepared in accordance with the requirementsof
Clauses 501.8. The granular or stabilized surfaces shall be primed as per Clause
502.Immediately before the application of the tack coat, the surface shall be swept clean witha
mechanical broom, and high pressure air jet, or by other means as directed by theEngineer.
503.4.3 Application of Tack Coat
The application of tack coat shall be at the rate specified in Table 500-5, and it shall be
applieduniformly. If rate of application of Tack Coat is not specified in the contract, then it shall
be therate specified in Table 500-5. No dilution or heating at site of RS1 bitumen emulsion shall
bepermitted. Paving bitumen if used for tack coat shall be heated to appropriate temperaturein
bitumen boilers to achieve viscosity less than 2 poise. The normal range of sprayingtemperature
for a bituminous emulsion shall be 20ºC to 70ºC and for cutback, 50ºC to 80ºC.The method of
application of tack coat will depend on the type of equipment to be used, sizeof nozzles,
pressure at the spray bar, and speed or forward movement. The Contractor shalldemonstrate at
a spraying trial, that the equipment and method to be used is capable ofproducing a uniform
spray, within the tolerances specified.
Table500-5:RateofApplicationofTackCoat
TypeofSurface Rate of Spray of Binder
Bituminous surfaces 0.20–
Granularsurfaces treated with primer 0.25–
Cementconcrete pavement 0.30–
503.4.4 Curing of Tack Coat
The tack coat shall be left to cure until all the volatiles have evaporated before any
subsequentconstruction is started. No plant or vehicles shall be allowed on the tack coat other
than thoseessential for the construction.
503.5 Quality Control of Work
For control of the quality of materials and the works carried out, the relevant provisions ofSection
900 shall apply.
503.6 Arrangements for Traffic
During the period of construction, arrangements for traffic shall be made in accordance withthe
provisions of Clause
503.7 Measurement for Payment
Tack coat shall be measured in terms of surface area of application in square metres.
505.4.7 Mixing and Transportation of the Mix
The provisions as specified in Clauses 501.3 and 501.4 shall apply. Table 500-2 gives
themixing, laying and rolling temperature for dense mixes using viscosity grade bitumen. In
caseof modified bitumen, the temperature of mixing and compaction shall be higher than the
mixwith viscosity grade bitumen. The exact temperature depends upon the type and amountof
modifier used and shall be adopted as per the recommendations of the manufacturer. Inorder to
have uniform quality, the plant shall be calibrated from time to time.
505.4.8 Spreading
The provisions of Clauses 501.5.3 and 501.5.4 shall apply.
505.4.9 Rolling
The general provisions of Clauses 501.6 and 501.7 shall apply, as modified by the
approvedlaying trials. The compaction process shall be carried out by the same plant, and using
thesame method, as approved in the laying trials, which may be varied only with the
expressapproval of the Engineer in writing.
505.5 Opening to Traffic
It shall be ensured that the traffic is not allowed without the approval of the Engineer in
writing,on the surface until the dense bituminous layer has cooled to the ambient temperature.
505.6 Surface Finish and Quality Control of Work
The surface finish of the completed construction shall conform to the requirements of
Clause 902. All materials and workmanship shall comply with the provisions set out in
Section 900 of these Specifications.
505.7 Arrangements for Traffic
During the period of construction, arrangements for traffic shall be made in accordance withthe
provisions of Clause
505.8 Measurement for Payment
Dense Graded Bituminous Materials shall be measured as finished work either in
cubicmetres, tonnes or by the square metre at a specified thickness as indicated in the
Contractdrawings,or documents, oras otherwise directed bythe Engineer.
The contract unit rate for Dense Graded Bituminous Macadam shall be payment in full
forcarrying out all the required operations as specified and shall include, to all
componentslistedinClause501.8.8.2.
Directions for work
1. The samples of aggregates of required grading for the work shall be got approved from
the Engineers-in-charge prior to transportation and collection on Plant site. Only
approved material shall be transported and stacked as per requirement. Inferior
materials shall have to be removed from the plant site by the contractor at his own cost.
If contractor fails to remove the inferior type of materials from the plant site, the
department at the cost of contractor will remove the same. Collection of aggregates shall
be in different stacks according to various sizes of aggregates.
2. For the purpose of collection of materials, plant site shall be established at suitable
places, where batch mix plant shall be installed. Department will extend all necessary
cooperation in helping contractor to get near by corporationLand for establishing Plant
site. However; department is not responsible, if no such land is made available to the
contractor and in that case, the contractor will have to make his own arrangement for the
same. Incoming materials shall be recorded in a register for the purpose of record. The
binder shall be straight run Bitumen of a suitable grade as directed by the Engineer-in-
charge complying with I.S.73:2006.
3. Bituminous macadam should not be laid during rainy weather or when the base courseis
4. The base on which the bituminous macadam is to be laid shall be throughly swept and
scraped clean and free of dust and foreign matter.
5. Binder shall be heated to the temperature appropriate to the grade of bitumen used and
approved by the Engineer-in-charge and sprayed on the base at the rate specified. The
rate of spread of straight run bitumen for tackcoat shall be 3 kg. per 10 Sqm. area.
1. The binder content for premixing shall
be 4% (Le. 40 KG/MT) of weight of the total mix
unless otherwise specified. The quantities of aggregates shall be sufficient to yield
specified thickness and achieve sp. density of DBM 2.20 gm/c.c. after compaction.
. The contractor shall get the job mix formula for the mix approved by the Engineer-in-
charge before starting the work. In order to obtain the required type of mix, the
department may change the proportion of bitumen and gradings of aggregates and
contractor shall have to collect the materials accordingly. Incase of increased or
decreased quantity will be adjusted at the rate provided in Annexure. The contractor shall
be responsible for ensuring proper proportioning of materials. In accordance with the
approved job mix formula and producing a uniform mix.
If Engineer in Charge of work feels fit for quality of mix, the job mix formula shall be
obtained from GERI or any Govt approved lab as suggested by VADODARA MUNICIPAL
CORPORATION The contractor shall provide the Aggregates in required quantity and
grading as directed by the Engineer-in-charge without any extra cost of Department.
07. Batch mix plant of adequate capacity and capable of producing proper and uniform
quality shall be used for preparing the mix. The plant may be either a batch type or a
continuous one, having a co-ordinated set of essential unit such as dryer for heating the
aggregates device, for batching feeding by weight or volume, the required quantities of
aggregates, a binder heating and control unit for measuring the correct quantity of heated
binder together with a paddle mixture for intimate mixing of the binder and aggregate.
Each hot mix plant shall be confirmed to component arrangements as per Appendix-A
attached herewith.
08. The temperature, of binder at the time of mixing shall be in the range 1500 C – 1650 C,
and that of aggregate in the range 1500 C – 1700 C. providing that, the difference in
temperature between the binder and aggregate at no time exceeds 140 C.
09. Mixing shall be thorough to ensure that; a homogeneous mixture is obtained in which all
particles of the aggregates are coated uniformly.
10. The mixture shall be transported from the mixing plant to the point of use in suitable
vehicles. The vehicles employed for transport shall be clean and the covered over transit
if so directed by the Engineer-in-charge.
11. The mix transported from the batch mix plant to the site shall be spread by means of a
self propelled mechanical paver with suitable screeds capable of spreading, temping and
finishing the mixture to specified grade, lines and cross sections.
The temperature of mix at the time of laying shall be Min 1400 C.
Rolling must be completed before the material cools to 900 min temperature.
12. In multy layer construction, longitudinal joints and edges shall be constructed true to the
adjoining lines, parallel to the centre line
92 of the road; longitudinal joints shall be offset by
at least 1500 mm. from those in the binder course. All joints shall be cut vertical to the full
thickness of the previously laid mix and the surface to be painted with hot bitumen before
placing fresh materials. Longitudinal joints shall not be situated in the wheel track zones.
13. Immediately after spreading the mix, it shall be thoroughly compacted by the vibratory
roller, 8-10 tons 3 wheels roller, upto 5 tone capacity roller, moving at a speed not
exceeding 5 K.M. per hour.
14. The roller wheels shall be kept damp to prevent the mix from adhering to them. In no
case shall fuel, lubricating oil be used for this purpose. Rolling shall commence
longitudinally from the edge and progress towards the centre except on super elevated
portions, it shall progress from the lower to upper edge, parallel to the centre lines of the
pavement. The roller should proceed on the fresh' material with real or fixed wheel
loading so as to minimise. The pushing of the mix and each pass of the roller shall
uniformly overlap notiless than one third of the track made in the preceding pass. Rolling
shall continue untill the entire surface pass. Rolling shall continue untill the entire surface
has been rolled to compaction and all the roller marks eleminated. The Quarry dust
flushing at the rate of 0.75 Cum / 100 Sq.mt shall be spreaded on asphalt surface as per
the direction of Engineer-in-charge of work for which no seperate payment shall be made.
15. Traffic may be allowed immediately after completion of the final rolling when the mix has
cooled down to the surrounding temperature.
16. Surface finish & Quality control of Work:
Control on the quality of materials and works shall be exercised by the Engineer-in-
charge by carrying out the required tests at the frequencies shown against each as
shown in the following tables and as shown in seperate table for quality control of road
No. Construction
01. Tackcoat i) Quality of binder Test frequency as
1) Absolute visocisity. described below in table
2) Kinematic visocisity. and tests as per IS:
3) Flash Point. : 8887 as applicable
4) Solubility in No. of No. of
Trichloroethylene Tanker Test
6) Softening point 5-10 tanker
7) Test on residue 11-20 tanker
i) Viscosity ratio at 60o C.Max. 21-50 tanker
ii) Ductility at 25oC. 51-
(As per IS:73:2006) 500tanker
At regular close
ii) Binder temperature for
Intervals as per
instructions of engr in
iii) Rate of spread of binder
three tests per day
Macadam i) Quality of binder
Absolute visocisity.
2) Kinematic visocisity.
Test frequency as
3) Flash Point.
described below in table
4) Solubility in and tests as per IS
Trichloroethylene :73:2006,IS : 217 and IS
5) Penetration : 8887 as applicable.
6) Softening point No. of No. of
7) Test on residue
i) Viscosity ratio at 60o C.Max. 1 tankar
ii) Ductility at 25oC. 5-10 tanker
(As per IS:73:2006) 11-20 tanker
94 21-50 tanker
ii) Aggregate Impact Value/ One test per 350 cu.m
Los Angeles Abrasion Value of aggregate for each
source and whenever
there is change in the
quality of aggregate.
iii) Flakiness and Elongation One test per 350 cu.m
Indices of aggregate for each
source and whenever
there is change in the
quality of aggregate.
One test for each source
iv) Soundness test (Sodium or and whenever there is
Magnesium Sulphate test) change in the quality of
One test for each source
v) Water absorption of and whenever there is
aggregates change in the quality of
One test for each source
vi) Sand equivalent test and whenever there is
change in the quality of
One test for each source
vii) Plasticity Index and whenever there is
change in the quality of
One test for each source
viii) Polished stone value and whenever there is
change in the quality of
One test per 350 cu.m
ix) Percentage95of fractured of aggregate when
face crushed gravel is used
One set for individual
constituent and mixed
aggregate from dryer for
each 400 tonnes of mix
subject to minimum of
twotests per day per
xi) Stability and voids analysis Three tests for stability,
of mix including flow value, density and
theoreticalmaximum specific void contents for each
of loose 400 tonnes of mix
mix subject to minimum of
two tests per day per
One test for each mix
xii) Moisture Susceptibility of type whenever there
mix (AASHTO T283) is change in the quality
or source of coarse
or fine aggregate
At regular intervals
xiii) Temperature of binder in
boiler, aggregate in dryer
and mix at the time of laying
One set for each
tonnes of mix subject to
xiv) Binder content minimum of two tests
per day per plant
After every 5th truck
xv) Rate of spread of mix
One test per 700 sq.m
xvi) Density of Compacted area
17. The contractor shall at all times carryout work on the main roads in a manner creating
least interference to the flow of traffic, while consistent which the satisfactory execution of
the same. For all works involving improvements to the existing main roads, the contractor
shall in accordance with the directives of the Engineer-in-charge provide and maintain
during the execution of the work, a passage for traffic either along a part of the existing
carriage way under improvement.
18. Incase of improvement works, namely widening, strengthening of the existing pavement
or reconstruction, repairs to cross drainage works, where such works could be carried out
on part widths at the time and the traffic could simultaneously be passed without delay
and difficulty on the other part. The road shoulder shall be dressed and brought in line
with the pavement and maintained throughout the duration of the work to the satisfaction
of the Engineer-in-charge. Where work is in progress in continuous long stretches
passing place, at least 20 meter long and 6 meter wide inclusive of the width of the
existing carriageway shall be provided at half to one kilometer intervals as directed by the
Engineer-in-charge. Extra treatment to shoulders where necessary shall be given as
ordered by the Engineer-in-charge.
19. The contractor shall take all necessary measures for the safety of traffic, during
construction and provide, erect and maintain such barricades including signs, marking
lights and flagmen as may be required by the Engineer-in-charge for the information and
protection of traffic approaching or passing through the section of the main road under
improvement. Before taking up any construction, an agreed phased programme for the
control of traffic on the main road shall be drawn up in consultation with the Engineer-in-
20. The barricades erected on either side of the carriageway / portion of the carriageway
closed to traffic shall be strong to resist violation and painted with alternative black and
white strips. Bed lanterns or warning light of similar type shall be mounted on the
barricades at night and kept it throughout from sunset to sunrise. At the points where
traffic is to be clearly marked with the aid of pavement, markings, painted drums or a
similar device to the direction of the Engineer-in-charge of other suitable light source.
21. One way traffic operation shall be established wherever the traffic is to be passed over
part of the carriageway in adequate for two lane traffic. This shall site sides during all
hours. For regulation of traffic, the flagmen shall be equipped with red and green flags
and lights. On both sides, suitable reflectory shall be installed for the guidance of road
users. On each approach, at least two signs shall be put up one closed to the point,
where transition of the carriageway begins and the other 120 meters away. The signs
shall be of approved make and of reflectory type if so directed.
22. The payment shall be made on the tonnage basis of the weight of mix of aggregates and
bitumen. For this purpose, the contractor shall have to install a weigh-bridge of suitable
capacity for the purpose of weightment of dumpers at suitable places at his cost as
directed. Weight of empty dumper and weight of loaded dumper will be recorded in bound
and numbered register on plant site. Department will be free to get the same. Some
loaded dumpers shall be test checked at other weight-bridges. Contractor’s weigh bridge
shall be periodically get cailberated and varified from weight and measure authorities.
23. Weight of mix materials will be done in presence of responsible person, not less than the
rank of Supervisor of department and the 97 measurements shall be recorded by the Deputy
Executive Engineer or Junior Engineer or Add. Ass. Engineer, if so, authorized. Record of
such dumper will be maintained separately in bound and number register which will be
maintained by the departmental representatives and signed by the contractor. Proper
gate pass system shall be established for the vehicles coming to the plant site and out
going from the plant site.
24. The Dense bituminous macadam shall be paid on M.T. BASIS. The contract rate for
Dense bituminous macadam shall be paid in full for carry ingout the required operation
including following procedures.
i) Making arrangements of control and safety of traffic.
ii) Preparation of base.
iii) Providing all materials to be incorporated in the works with all leads and lifts.
iv) All labour, tools, equipments and incidential to complete the work to the specifications.
25.Testing of materials shall be as per book of quality control I.R.C. Special Publication No.11
The materials shall be tested in GERI, Vadodara/ As per directd by the V.M.C.Officers.
Providing and Laying average 50mm thick compacted Bituminous concrete using
Coarse aggregate/fine aggregate / filler as per required gradation and asphalt (VG-40
grade) 5.5 % by wt.of mix and mixing by BATCHMIX process including applying tack
coat at the rate of 3kg./10 Sq.Mt. and spreading by paver finisher and flushing quarry
dust on B.T. surface at the rate of 0.75 CM/100 Sq.Mt. including consolidation etc.
complete by using Sevaliya,Timba area Quarry Material.(As per M.O.R.T.H.)
507 BITUMINOUS CONCRETE
This work shall consist of construction of Bituminous Concrete, for use in wearing and
profilecorrective courses. This work shall consist of construction in a single layer of
bituminousconcrete on a previously prepared bituminous bound surface. A single layer shall
507.2 Materials
507.2.1 Bitumen
The bitumen shall conform to Clause 504.2.1.
Supply of asphalt shall be viscosity Grade VG-30 and satisfying requirements of I.S. 73-
2006 or other approved type of bitumen as may be approved by the department.
However, proper arrangements for storing the bulk asphalt as and when received on plant
site shall be made by the contractor at his cost and risk.
The asphalt shall confirm to grade with VG-30 .
Requirments for Paving Bitumen (As per IS:73:2006)
SI. Characteristics Paving Grades Methods of Test Ref.to IS
i) Absolute viscosity at 600 C, Poises,Min. 3200-4800 IS 1206 (Part 2)
ii) Kinematic viscosity at 1350C cst,Min. 400 IS 1206 (Part 3)
iii) Flash Point. 220 IS 1448 p.69
(Cleveland Open up), 0C Min.
iv) Solubility in 99.0 IS
Trichloroethylene,percent,Min.
v) Penetration at 250C, 100g, 5s,0.1mm 35 IS
vi) Softening point (R&B), 0C Min. 50 IS
vii) Test on residue from thin firlm oven
a) Viscosity ratio at 600C, Max. 4.0 IS 1206 (Part 2)
b) Ductility at 250C,cm,Min, after thin- 25 IS
film oven test.
507.2.2 Coarse Aggregates
The coarse aggregates shall be generally as specified in Clause 504.2.2, except that
theaggregates shall satisfy the physical requirements of Table 500-16 and where crushed
gravelis proposed for use as aggregate, not less than 95 percent by weight of the crushed
materialretained on the 4.75 mm sieve shall have at least two fractured faces.
Table500-16:PhysicalRequirementsforCoarseAggregateforBituminousConcrete
Property Test Specification MethodofTest
Cleanliness(dust) Grainsize analysis Max5% passing IS:2386Part I
Particleshape CombinedFlakinessand Max35% IS:2386Part I
ElongationIndices
Strength LosAngelesAbrasionValueorAg Max30% IS:2386Part IV
gregateImpactValue Max24%
Durability Soundness Max12% IS:2386Part V
either:SodiumSulphate or
MagnesiumSulphate Max18%
Polishing PolishedStoneValue Min55 BS:812-114
WaterAbsorption WaterAbsorption Max2% IS:2386 Part III
Stripping Coatingand Stripping of Minimum IS:6241
BitumenAggregate Mix retainedcoatin
WaterSensitivity RetainedTensileStrength* Min80% AASHTO283
* Iftheminimumretainedtensileteststrengthfallsbelow80percent,useofantistrippingagent
isrecommended to meet the requirement.
507.2.3 Fine Aggregates
ThefineaggregatesshallbeallasspecifiedinClause505.2.3.
FillershallbeasspecifiedinClause505.2.4.
507.2.5 Aggregate Grading and Binder Content
WhentestedinaccordancewithIS:2386Part1(Wetgradingmethod),thecombinedgradingofthecoarseand
fineaggregatesandfillershallfallwithinthelimitsshowninTable500-17.Thegradingshall beasspecified
inthe Contract.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Doc South Zone ARC_compressed.pdf
1.0 SBD South Zone.pdf
Amenement South Zone DBM 25CR.pdf
CORRIGENDUM
City Engineer Paripatra.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .