Tender Value
₹3.4 Cr
EMD Value
₹3.2 L
Closing Date
15 Apr 2025, 3:00 pmClosed
Improvements to ballast siding including earth work in forming ballast depot, track work for extension of ballast siding, construction of bridges and retaining wall at Tiruturaipundi and Villupuram stations.
TPJ-04-2025-03
TPJ-04-2025-03
Open
Works - General
8 Months
Villupuram, Tamil Nadu
₹0
₹3.2 L
24 Mar 2025
24 Mar 2025
percentage above or below the advertised value of schedule 'A1' (The advertised value is inclusive
of Railways escalation over CPWD-DSR 2021 basic value)
Item- 1 Earth Filling of Low-Lying Areas at TTP Ballast Depot
S No. Item Description of Item Unit Qty Rate Amount
2.0 EARTH WORK
Earth work in excavation by mechanical
means (Hydraulic excavator) / manual means
in foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm on plan),
2.8 including dressing of sides and ramming of
bottoms, lift upto 1.5 m, including getting out
the excavated soil and disposal of surplus
excavated soil as directed, within a lead of 50
2.25 Filling available excavated earth (excluding cum 162 253.95 41139.9
rock) in trenches, plinth, sides of foundations
etc. in layers not exceeding 20cm in depth,
consolidating each deposited layer by
ramming and watering, lead up to 50 m and
lift upto 1.5 m.
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position cement
concrete of specified grade excluding the cost
of centering and shuttering - All work up to
derived from natural sources : 8 graded stone
aggregate 40 mm nominal size derived from
natural sources)
5.0 REINFORCED CEMENT CONCRETE
5.9S FORM WORK
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Centering and shuttering including strutting,
propping etc. and removal of form for
5.9.2 Walls (any thickness) including attached Sqm 1064 669.55 712401.2
4 pilasters, butteresses, plinth and string
5.22S STEEL REINFORCEMENT
Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in
position and binding all complete upto plinth
5.22.6 Thermo-Mechanically Treated bars of grade Kg 11498 89.65 1030795.7
Fe-500D or more.
5.33S DESIGN MIX CONCRETE
Providing and laying in position ready mixed
or site batched design mix cement concrete
for reinforced cement concrete work; using
coarse aggregate and fine aggregate derived
from natural sources, Portland Pozzolana /
Ordinary Portland /Portland Slag cement,
admixtures in recommended proportions as
per IS: 9103 to accelerate / retard setting of
concrete, to improve durability and
w o r k a b i l i t y without impairing strength;
including pumping of concrete to site of
laying, curing, carriage for all leads; but
excluding the cost of centering, shuttering,
finishing and reinforcement as per direction of
the engineer-in-charge; for the following
grades of concrete. Note: Extra cement up to
10% of the minimum specified cement
content in design mix shall be payable
separately. In case the cement content in
design mix is more than 1.10 times of the
specified minimum cement content, the
contractor shall have discretion to either re-
design the mix or bear the cost of extra
5.33.1 All works upto plinth level
5.33.1.3 Concrete of M35 grade with minimum cement cum 186 8966.95 1667852.7
content of 370 kg /cum
5.35 Add for using extra cement in the items of Quintal 69 688.45 47503.05
7 design mix over and above the specified
cement content therein.
10.0 STEEL WORK
10.2 Structural steel work riveted, bolted or welded Kg 8875 111.95 993556.25
in built up sections, trusses and framed work,
8 including cutting, hoisting, fixing in position
and applying a priming coat of approved steel
primer all complete.
12.0 ROOFING
Providing and fixing on wall face unplasticised
- PVC moulded fittings/ accessories for
unplasticised Rigid PVC rain water pipes
conforming to IS : 13592 Type A, including
jointing with seal ring conforming to IS : 5382,
leaving 10 mm gap for thermal expansion.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
12.50 Providing and fixing precoated galvanised iron Sqm 750 671.55 503662.5
profile sheets (size, shape and pitch of
corrugation as approved by Engineer-in-
charge) 0.50 mm (+ 0.05 %) total coated
thickness with zinc coating 120 grams per
sqm as per IS: 277, in 240 mpa steel grade, 5-
7 microns epoxy primer on both side of the
sheet and polyester top coat 15-18 microns.
Sheet should have protective guard film of 25
9 microns minimum to avoid scratches during
transportation and should be supplied in
single length upto 12 metre or as desired by
Engineer-in-charge. The sheet shall be fixed
using self drilling /self tapping screws of size
(5.5x 55 mm) with EPDM seal, complete upto
any pitch in horizontal/ vertical or curved
surfaces, excluding the cost of purlins, rafters
and trusses and including cutting to size and
shape wherever required.
16.0 ROAD WORK
16.3 Supplying and stacking at site.
Item- 2 Extension of Ballast Siding at TTP Ballast Depot - Plain Track works
S No. Item Description of Item Unit Qty Rate Amount
10.0 STEEL WORK
10.2 Structural steel work riveted, bolted or welded Kg 234 111.95 26196.3
in built up sections, trusses and framed work,
1 including cutting, hoisting, fixing in position
and applying a priming coat of approved steel
primer all complete.
Item- 3 Extension of Bridge No M-300 at TTP Ballast Depot
S No. Item Description of Item Unit Qty Rate Amount
6.0 MASONRY WORK
Brick work with common burnt clay F.P.S. (non
6.1 modular) bricks of class designation 7.5 in
foundation and plinth in:
13.0 FINISHING
13.1S CEMENT PLASTER (IN FINE SAND)
13.1 12 mm cement plaster of mix :
15.0 DISMANTLING AND DEMOLISHING
Demolishing cement concrete manually/ by
mechanical means including disposal of
material within 50 metres lead as per
direction of Engineer - in - charge.
15.2.1 Nominal concrete 1:3:6 or richer mix (i/c cum 20 2007.1 40142
equivalent design mix)
Item- 4 Earth Filling of Low-Lying Areas at VM Ballast Depot
S No. Item Description of Item Unit Qty Rate Amount
2.0 EARTH WORK
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Earth work in excavation by mechanical
means (Hydraulic excavator) / manual means
in foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm on plan),
2.8 including dressing of sides and ramming of
bottoms, lift upto 1.5 m, including getting out
the excavated soil and disposal of surplus
excavated soil as directed, within a lead of 50
2.25 Filling available excavated earth (excluding cum 19 253.95 4825.05
rock) in trenches, plinth, sides of foundations
etc. in layers not exceeding 20cm in depth,
consolidating each deposited layer by
ramming and watering, lead up to 50 m and
lift upto 1.5 m.
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Centering and shuttering including strutting,
propping etc. and removal of form work for :
3 4.3.1 Foundations, footings, bases for columns Sqm 113 307.95 34798.35
4.14S MISCELLANEOUS
Providing and laying in position ready mixed
or site batched design mix cement concrete
for plain cement concrete work; using coarse
aggregate and fine aggregate derived from
natural sources, Portland Pozzolana/Ordinary
Portland /Portland Slag cement, admixtures in
recommended proportions as per IS: 9103 to
accelerate / retard setting of concrete, to
improve durability and workability without
impairing strength; including pumping of
concrete to site of laying, curing, carriage for
all leads; but excluding the cost of centering,
shuttering and finishing as per direction of the
engineer-in-charge; for the following grades of
concrete. Note: Extra cement up to 10% of the
minimum specified cement content in design
mix shall be payable separately. In case the
cement content in design mix is more than
110% of the minimum specified cement
content, the contractor shall have discretion
to either re-design the mix or bear the cost of
4.20.1 All works upto plinth level :
4.20.1.3 Concrete of M20 grade with minimum cement cum 8 8387.15 67097.2
content of 270 kg /cum
Item- 5 Extension of Ballast Siding at VM Ballast Depot
S No. Item Description of Item Unit Qty Rate Amount
10.0 STEEL WORK
10.2 Structural steel work riveted, bolted or welded Kg 117 111.95 13098.15
in built up sections, trusses and framed work,
1 including cutting, hoisting, fixing in position
and applying a priming coat of approved steel
primer all complete.
Schedule A2-All items which are covered by Unified Standard Schedule of rates 2021 for
Tiruchchirappalli Division - Except supply of cement and reinforcement steel. (The
Schedule tenderer/contractor shall quote a rate 'at par' or a collective percentage above or below the
advertised value of schedule 'A2' (The advertised value is inclusive of Railways escalation over
USSOR 2021 basic value)
Item- 1 Earth Filling of Low-Lying Areas at TTP Ballast Depot
S No. Item Description of Item Unit Qty Rate Amount
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Earthwork in cutting in formation, trolley
refuges, side drains, level crossing
approaches, platforms, catch water drains,
diversion of nallah & finishing to required
dimension and slopes to obtain a neat
appearance to standard profile inclusive of all
labour, materials, plant & machinery, leading
all cut spoils either to make spoil dumps or for
filling in embankment with leads within 2 km
on either side of edge of the cutting(s)
including all lifts, ascent, descent, loading,
unloading, bailing & pumping out water, if
required, clearance of site and all other works
incidental thereto for completing the work as
per RDSO Specification No. RDSO/2020/GE:
IRS-0004 with latest updated correction slips
and to the satisfaction of the Engineer-in-
Charge. Note: (i) All usable earth arising from
cut spoils shall be led into bank formation and
Unusable spoils shall be dumped / stacked
away from toe of embankment. (ii) All hard
rock /and boulders not fit for filling will be
stacked by the contractor and will be property
of the Railways. (iii)Cut trees shall be property
of Railways and to be deposited in the railway
godown unless specified otherwise in the
Conditions of Contract.
1 012011 In all conditions and classifications of soil cum 9000.00 106.09 954810.00
Abutments, Wing walls and Return walls etc.,
of new bridges with 110mm dia UPVC pipe
Type A ISI marked with all contractor's men,
material, transportation, all taxes as per
specifications and as directed by Engineer-in-
Hiring of machinery for minor miscellaneous
works for short duration including
operator/driver, fuel, lubricants and
consumable. The contractor shall arrange all
statutory permits as required by rules and
regulations prevailing in the area of work.
Payment shall be made for actual working
3 211201 JCB Backhoe Loaders 3DX Plus or similar with Hour 150.00 867.49 130123.50
minimum 1.10 cum bucket capacity
Item- 2 Extension of Ballast Siding at TTP Ballast Depot - Plain Track works
S No. Item Description of Item Unit Qty Rate Amount
Gas cutting of rail of various sections with
contractor's tools & plants, as directed by
engineer in-charge :
procedure prescribed in latest edition of
IRPWM including cess dressing on both sides
of track. The work will include removing
excess ballast from track and putting the
same in crib and shoulder by leading to a
maximum of 50m including crossing of track,
deweeding on ballast section etc and as
directed by Engineer-In charge.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
3 123030 Spreading of ballast, from existing stacks cum 700.00 49.15 34405.00
available along formation on top or at cess, in
required uniform thickness, compaction of
ballast layer laid on new formation at all the
locations with smooth wheeled power roller of
8-10 tonne capacity to sufficient number of
passes to form consolidated ballast bed of
approximately 250mm thickness to a width of
4m symmetrical to centre line of proposed
track in correct line & level with all ascents &
descents, as directed by Engineer in-charge.
Note: Item is inclusive of (a) providing ramp
for taking roller to formation and removing the
same & making good formation after
completion of work; (b) redistribution &
leveling of excess ballast while rolling to
obtain uniform plane cambered surface.
Linking of BG track (except at LC, Bridges and
SEJs) with any type of rail section and sleeper
of specified density, on ballast bed spread and
compacted with suitable roller, over prepared
formation including leading free rails/welded
panels available along the alignment on to
formation, leading and spreading all fittings
and fastenings, spreading of sleepers at
specified spacing, squaring, placing of rails
over sleepers and fixing rails to sleepers with
all types of fittings and fastenings to correct
gauge & alignment, lubrication of fittings and
fastenings with contractor's grease as per
IRPWM standards with contractors labour,
tools, consumables, with all lead, lifts etc.
complete and raising, levelling and initial
packing of track to make it fit for 30 kmph and
meet other prerequisites prescribed in Indian
Railway Track Machine Manual for deployment
of Tamping Machine. Note: 1.Rail cutting and
Hole drilling shall be paid separately.
2.Spreading of ballast and compaction shall
be paid separately under relevant item.
4 123041 For sleeper density of 1660 sleepers per km TRM 350.00 351.76 123116.00
5 123080 Carrying out cut & connection to the existing Each 2.00 72097.07 144194.14
PSC sleeper track under line block of any rail
section and sleeper density to connect the
same to newly linked track which is laid by
the side, duly carrying out cutting of rails,
insertion of additional PSC sleepers, if
required, providing fish plated joints including
drilling of holes, slewing required length of
both tracks to prescribed alignment, adjusting
sleeper spacing, providing continuity to track,
spreading of ballast to provide cushion,
shoulder ballast to the track stretch, giving
one round of initial packing to make track fit
for 20 kmph speed and boxing of ballast to
profile as directed by Engineer in charge.
Shifting / Slewing the existing or newly
assembled track of any rail section with any
type of sleepers and any density under line
block to correct locations & alignment and
attending to one round kutcha packing to run
safely at 20KMPH speed with all contractors
tools and consumables complete and as
directed by Engineer in-charge.
6 123091 Maximum Shifting / Slewing up to 1 metre TRM 100.00 229.57 22957.00
7 123092 Maximum Shifting / Slewing for more than 1 TRM 75.00 275.93 20694.75
metre & up to 2 metres
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Anti-corrosive painting of rail outside track on
rail bottom, web, foot and fishing plane with
two coats of thickness of 100 microns each by
bituminous black paint confirms to IS-9862 of
reputed make including surface preparation,
as a complete job as per procedure prescribed
in latest edition of IRPWM.
Carrying out pre-tamping, during tamping and
post-tamping work for tamping track with all
types of rails, sleepers & sleeper density by
various Track Tamping machines, like
CSM,DUO/3X Machines which include : (1) Re-
adjustment of ballast, heaping-up of ballast,
filling-up of cavities in tamping zone by
picking ballast from stacks / shoulders / crib of
adjoining track up to lead of 50 m to ensure
effective packing; (2) Clearing of ballast on
sleepers to make them visible to operator, (3)
Clearing of ballast over rail foot to facilitate
holding of rail by rollers of TTRM; (4) Digging,
screening and replenishment of ballast at
mud pumping / rounded ballast in sleeper crib
location; (5) Tightening of loose fittings
immediately before & after tamping; (6)
Replacement of broken / missing fittings
supplied by Railway; (7) Correcting displaced
sleepers to position along with squaring; (8)
Re-setting of worked-out / fallen fittings. (9)
Removing and re-fixing joggled fish plates &
wooden blocks, wherever necessary; (10)
Manual consolidation of ballast in crib /
shoulders; (11) Removing and refixing of
traction bonds during the block in electrified
sections (12) Dressing of ballast Note: 1.
Tamping blocks are not identical & it may be
given at any time either during day or night.
2. Stages of payment a) 30% of the rate will
be paid on completion of pre tamping
attention, b) Balance 70% of the rate will be
paid on completion of post tamping. 3.
Recovery at the rate of twice the above
applicable rate will be effected in case
contractor fails to carry out pre/during/post
operation. 4.Payment shall be made only once
in irrespective of numbers of TTRM packing
round and after restoration of normal speed
and restoration of complete ballast profile.
Quick cutting with abrasive rail cutter of all
types of rail sections including wear resistant,
head hardened rails up to 110 UTS, with
contractors tools & plants, equipment,
consumable with all lead & lift etc. complete
as directed by Engineer in-charge. Abrasive
Rail Cutter will be as per RDSO Specification
No. TM/SM/1 (Rev. 01 of 2012) with latest
status of RDSO; Rail Cutting Wheel Abrasive
Disc will be as per RDSO Specification
No.TM/SM/2 (Rev. 01 of 2020)
Drilling holes of 16 mm to 32 mm dia. with
Rail Drilling machine including chamfering
with appropriate chamfering tools in all types
of rail section with contractor's tools & plants,
equipment, consumable with all lead & lift etc.
complete, as directed by Engineer in-charge.
Rail Drilling Machine will be as per RDSO
Specification No. TM/SM/3, dated 24.04.1991.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
14 161050 Drilling holes of specified size for bond holes Each 467.00 53.93 25185.31
with 7.2mm dia drill twist to correct spacing
and location on 60kg/52kg rails on cess or
under traffic block with contractor's tools and
plant, equipment, consumable, labour etc
complete as directed by the Engineer in
charge at site.
Loading of rails of any section and length up
t o 1 3 metres in Wagons / Truck / trailer
including lead up to 50 metres and lift up to 5
15 171014 I n Wagon where mechanical handling is MT 38.00 165.78 6299.64
possible and traffic block is not required or in
Loading, leading and unloading of 52Kg / 60Kg
rail up to 13 metre length by Railway's Rail
Dolly / Dip Lorry to the nominated location
under traffic with line protection in case road
carriage is not possible with different lead
with a lift up to 5 metre during block period.
Km for every subsequent Km or part thereof
and up to 10 Km
Unloading of rails of any section and length up
to 13 metre, in neat manner for Railway
usage from departmental material train (DMT)
or contractor's / Railway's Truck/trailer
including lead up to 50 metre, lift up to 5
metre and stacking in prescribed manner.
18 171053 From Wagon where mechanical handling is MT 38.00 121.63 4621.94
possible and traffic block is not required or in
Truck / trailer.
Loading, leading and unloading of PSC
Sleepers of 52Kg / 60Kg by Railway's Rail
Dolly/ Dip Lorry to the nominated location
under traffic in case road carriage is not
possible for different leads and lift up to 5
Km for every subsequent Km or part thereof
and up to 10 Km
Loading, leading and unloading of all types of
P.Way fittings and all other miscellaneous
material except Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: Lead shall
be the shortest motorable road length
between the points of loading and unloading.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Transportation of Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: 1. Lead shall
be the shortest motorable road length
between the points of loading and unloading.
2. Loading and unloading shall be paid extra
under relevant items.
Unloading of 52kg / 60kg PSC line and special
sleepers up to 2.75 metre length in Depot /
Station / Mid-section between stations in neat
manner for Railway usage from departmental
material train (DMT) or contractor's / Railway's
Truck/Trailer with crane or any other means
including crossing of one track and lead up to
250 metre & lift up to 5 metre with
contractor's labour, tools & plants, machinery,
consumables etc. Note: In case of any
damage to sleeper during loading, penalty @
50% of the all inclusive cost of sleeper shall
25 211250 Manufacturing and fixing buffer stop with Each 2.00 17110.32 34220.64
Railway supplied rails, cutting, including
bending of rails as per plan ,with all
contractor's labour, materials, tools, plants
etc. and all lead and lift including crossing of
track where necessary and as directed by
Engineer in charge at site. Note: Excavation,
fixing rails in cement concrete, drilling of
holes will be paid separately.
Item- 3 Extension of Ballast Siding at TTP Ballast Depot - Points & crossings works
S No. Item Description of Item Unit Qty Rate Amount
Dismantling and removing rail of all section &
length from track, laid on any type & density
of sleeper by removing fish plates, fastenings
& fish bolts and other materials including
stacking all released materials within an
average distance of 500 metres as directed by
Engineer in-charge. Note: 1.Cutting of rails
shall be paid separately. 2.Work to be done
under traffic block.
1 061022 For Casual/Scattered Rail Renewal work RM 127.00 39.41 5005.07
Insertion of rails of all types & length in track,
laid on any type & density of sleeper to the
specified gauge under traffic block. Rates
include fastening of rail with sleepers with
standard set of fastenings and fixing of fish
plates and bolts or, if required, providing gap
for welding and stacking of released material
without infringement within 250m as directed
by Engineer-in-Charge. Note: Rail drilling and
cutting to be paid separately.
2 061032 For Casual/Scattered Rail Renewal work RM 127.00 41.74 5300.98
Gas cutting of rail of various sections with
contractor's tools & plants, as directed by
engineer in-charge :
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Assembling complete BG Turnout on staging,
clear of infringements, to correct gauge and
alignment as per standard drawings with all
types of rail sections over PSC sleepers at
specified locations, duly leading rails, special
sleepers, switches, crossings with a maximum
lead of 500m, all lift & crossing of track as
required and testing points with S&T staff for
throw of switch etc. at station yard after
levelling surface complete including
lubrication of all fastenings, complete in all
respect. Note: 1.Rail cutting and Drilling shall
be paid separately 2. Required P.Way
fittings/fastenings shall be supplied at the
SSE/P.Way stores.
Assembling all types of Switches on staging,
clear of infringements, to correct gauge and
alignment as per standard drawings with all
types of rail sections over PSC sleepers at
specified locations, duly leading rails, special
sleepers, switches with a maximum lead of
500m, all lift & crossing of track as required
including cutting, drilling, fixing of all
components, fittings etc. with housing of
tongue rails as per requirement of signaling
including lubrication of fittings/fastenings,
complete in all respect. Note: Required P.Way
fittings shall be supplied at SSE/P.Way stores.
6 083040 Removing, screening and salvaging ballast cum 30.00 344.21 10326.30
from track, duly digging / scarifying ballast by
beaters / wire brushes or any mechanical
means, leveling and dressing formation with
specified cross slope after salvaging ballast,
separating muck by screening the salvaged
ballast with contractor's 20mm size sieve,
stacking of screened ballast for measurement,
disposing off muck at specified locations with
all lead & lifts as directed by Engineer in-
charge. Note: Payment shall be made for
quantity of ballast stacked after screening of
retrieved ballast from track.
7 092030 25mm gap 'in-situ' welding during traffic block Each 23.00 1806.57 41551.11
using Railway's welding portion & Welder and
finishing of weld to meet the prescribed
tolerances and pass all stipulated tests with
all required labour, materials, consumables,
tools, equipments etc. to complete the work in
all respect as per IR's "Manual for Fusion
Welding of Rails by Alumino - Thermic
Process" with latest correction slips, including
marking of welded joint, painting weld collar
with anticorrosive paint, restoration of track
near weld joint to original position and fixing
of joggled fish plate at new weld, to be
removed after passing of weld in USFD test as
directed by Engineer in charge. Note: 1. Only
welding portion and related accessories as per
Annexure - I and Welder shall be supplied by
Railways. 2. Hydraulic Weld trimmer shall be
used for chipping and profile Grinder for
finishing. 3. Required nos. of Joggled fish
plates shall be supplied by Railway at nearest
P. Way Stores and the same shall be returned
at nearest P. Way Store or at other location as
per direction of Engineer-in-Charge after
release from track.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
8 121010 Dismantling of existing LWR/SWR track of any TRM 30.00 216.96 6508.80
structure, removing rails, sleepers, fish plates,
cutting of rails, segregation and stacking of
released Rails, Sleepers and fitting at
nominated location in countable manner
within a free lead of 500m, levelling of ballast
to correct profile for laying new track over it,
all as per direction of Engineer-in-Charge.
9 136060 Replacing existing glued joint rail with cut Each 10.00 1999.79 19997.90
rails or with glued joint rail or insertion of
glued joint by cutting existing track under
traffic condition by cutting rails, refixing with
all rail sleeper fastenings and providing
required gaps for carrying out welding as an
alternative to drilling holes or joining rails with
fish plates duly drilling holes as required
including stacking of released material and as
directed by engineer in-charge. N o t e : (1)
Drilling holes & rail cutting will be paid
separately. (2) Transportation of materials to
the site of work from supply points, if more
than 250m, shall be paid separately.
Anti-corrosive painting of rail outside track on
rail bottom, web, foot and fishing plane with
two coats of thickness of 100 microns each by
bituminous black paint confirms to IS-9862 of
reputed make including surface preparation,
as a complete job as per procedure prescribed
in latest edition of IRPWM.
Dismantling of existing switch by removing
switches, sleepers, fixtures and stacking all
released materials, removing ballast and
muck by excavating up to required depth,
preparation of formation bed, laying of pre-
assembled switch by Railway's T-28 machine,
linking of track with all fittings, filling ballast
duly screened, aligning, packing, adjusting,
opening & housing of switch, testing
operation of switch assembly and attending
track parameters so as to make track fit for 20
kmph speed including disposing off muck to
indicated places after the block working etc.
complete. Note: Rate includes making
necessary preparation for T-28 machine
working/movement such as providing and
removing rail closures, preparation of
approaches, transportation and laying of
wooden sleepers/blocks, etc.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Carrying out pre-tamping, during tamping and
post-tamping works for tamping of Turnouts
of all types Under Traffic Block Conditions
which include :(1) Re-adjustment of ballast,
heaping-up of ballast, filling-up of cavities in
tamping zone by picking ballast from stacks /
shoulders / crib of adjoining track up to lead of
50 m to ensure effective packing; (2) Clearing
of ballast on sleepers to make them visible to
operator; (3) Clearing of ballast over rail foot
to facilitate holding of rail by rollers of
UNIMAT; (4) Digging, screening and
replenishment of ballast at mud pumping /
rounded ballast in sleeper crib location; (5)
Tightening of loose fittings including check
rails immediately before & after tamping; (6)
Replacement of broken / missing fittings
supplied by Railway; (7) Correcting displaced
sleepers to position along with squaring; (8)
Re-setting worked-out / fallen fittings; (9)
Removing and re-fixing joggled fish plates &
wooden blocks, OHE bonds & other
obstructions, wherever necessary ;(10)
Removing and re-fixing stretcher bar, as
directed; (11) Adjustment in opening and
housing of switch for testing operation of
points (12)Manual consolidation of ballast in
cribs and shoulders; (13) Stages of payment
a) 30% of the rate will be paid on completion
of pre tamping attention, b) Balance 70% of
the rate will be paid on completion of post
tamping; (14) Recovery at the rate of twice
the applicable rate will be effected in case
contractor fails to carry out any of the
pre/during/post operation.
13 156015 Derailing Switch (Under Traffic Block Set 1.00 3787.35 3787.35
14 157010 Carrying out various miscellaneous works, for Shift 3.00 1552.01 4656.03
proper upkeep of crew rest van / rest room as
directed by machine in-charge of Track
Machines by providing a team of 2 labours for
12 hours shift, broadly mentioned hereunder:
(1) Bringing water from nearby source and
cleaning machine with water jet or any
suitable means; (2) Fuelling machine duly
bringing diesel / hydraulic oil from the stacked
drums; (3) Bringing water to staff rest van or
staff rest room, cleaning rest van / rest room,
cooking food for Track Machine staff or
bringing food from outside (cost of food shall
be borne by the staff concerned).; (4)
Guarding & watching machines, spare parts,
oils, grease etc. during day and night time at
all locations, wherever necessary, as
instructed by the machine in-charge; (5) In
case, contractor provides less no. of
Labour/Mate, payment will be deducted for
each such person @ 75% of the accepted item
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Quick cutting with abrasive rail cutter of all
types of rail sections including wear resistant,
head hardened rails up to 110 UTS, with
contractors tools & plants, equipment,
consumable with all lead & lift etc. complete
as directed by Engineer in-charge. Abrasive
Rail Cutter will be as per RDSO Specification
No. TM/SM/1 (Rev. 01 of 2012) with latest
status of RDSO; Rail Cutting Wheel Abrasive
Disc will be as per RDSO Specification
No.TM/SM/2 (Rev. 01 of 2020)
Drilling holes of 16 mm to 32 mm dia. with
Rail Drilling machine including chamfering
with appropriate chamfering tools in all types
of rail section with contractor's tools & plants,
equipment, consumable with all lead & lift etc.
complete, as directed by Engineer in-charge.
Rail Drilling Machine will be as per RDSO
Specification No. TM/SM/3, dated 24.04.1991.
18 161050 Drilling holes of specified size for bond holes Each 50.00 53.93 2696.50
with 7.2mm dia drill twist to correct spacing
and location on 60kg/52kg rails on cess or
under traffic block with contractor's tools and
plant, equipment, consumable, labour etc
complete as directed by the Engineer in
charge at site.
Loading of rails of any section and length up
t o 1 3 metres in Wagons / Truck / trailer
including lead up to 50 metres and lift up to 5
19 171014 I n Wagon where mechanical handling is MT 8.00 165.78 1326.24
possible and traffic block is not required or in
Loading, leading and unloading of 52Kg / 60Kg
rail up to 13 metre length by Railway's Rail
Dolly / Dip Lorry to the nominated location
under traffic with line protection in case road
carriage is not possible with different lead
with a lift up to 5 metre during block period.
Km for every subsequent Km or part thereof
and up to 10 Km
Unloading of rails of any section and length up
to 13 metre, in neat manner for Railway
usage from departmental material train (DMT)
or contractor's / Railway's Truck/trailer
including lead up to 50 metre, lift up to 5
metre and stacking in prescribed manner.
22 171053 From Wagon where mechanical handling is MT 8.00 121.63 973.04
possible and traffic block is not required or in
Truck / trailer.
Unloading of all type of rails of length 130
metre and beyond from end unloading rake
and keep the panels in head-up position at
specified distance from centre of track clear
from any infringement.. Note: Contractor has
to keep Oxygen and Acetylene gas with cutter
as standby during the period of work.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Loading, leading and unloading of PSC
Sleepers of 52Kg / 60Kg by Railway's Rail
Dolly/ Dip Lorry to the nominated location
under traffic in case road carriage is not
possible for different leads and lift up to 5
Km for every subsequent Km or part thereof
and up to 10 Km
Loading, leading and unloading of all types of
P.Way fittings and all other miscellaneous
material except Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: Lead shall
be the shortest motorable road length
between the points of loading and unloading.
Transportation of Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: 1. Lead shall
be the shortest motorable road length
between the points of loading and unloading.
2. Loading and unloading shall be paid extra
under relevant items.
over item no. 172057
Unloading of 52kg / 60kg PSC line and special
sleepers up to 2.75 metre length in Depot /
Station / Mid-section between stations in neat
manner for Railway usage from departmental
material train (DMT) or contractor's / Railway's
Truck/Trailer with crane or any other means
including crossing of one track and lead up to
250 metre & lift up to 5 metre with
contractor's labour, tools & plants, machinery,
consumables etc. Note: In case of any
damage to sleeper during loading, penalty @
50% of the all inclusive cost of sleeper shall
Unloading of 52kg / 60kg PSC special sleepers
beyond 2.75 metre length in Depot / Station /
Mid-section between stations in neat manner
for Railway usage from departmental material
train (DMT) or contractor's / Railway's
Truck/Trailer with crane or any other means
including crossing of one track and lead up to
50 metre & lift up to 5 metre with contractor's
labour, tools & plants, machinery,
consumables etc. Note: In case of any
damage to sleeper during loading, penalty @
50% of the all inclusive cost of sleeper shall
Unloading of Switches / Crossings / SEJ Rails /
Glued Joints of any rail section and length with
or without P.Way fittings & fastenings in neat
manner for Railway usage from departmental
material train (DMT) or contractor's / Railway's
Truck/Trailer with lead up to 250 metre & lift
up to 5 metres.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
33 211060 Supply and fixing in position pre-cast cement Each 2.00 563.39 1126.78
concrete Fouling Mark as per approved
drawing at station yard, duly painting the top
surface and slopes with white enamel paint in
two coats and inscribed letters with black of
Fouling Mark, complete in all respects with all
labour, materials including cement, tools and
34 211180 Galvanisation of Railway's stretcher bars, MT 2.00 24335.57 48671.14
M.S.Liners, ERCs and Plate screws by hot dip
process with Zinc Coating and mass of Zinc
coating shall not be less than 705 g/sqm and
galvanisation thickness shall not be less than
100 microns including necessary surface
preparation as per Clause-4 of IS:2629-1985.
Galvanisation shall be done as per IS:2629-
1985 and IS:4759-1996 with Zinc conforming
to IS:209-1992, duly taking all the measures
for safeguarding against embrittlement of hot-
dip galvanised iron and steel products as per
IS:6158-1984 with all contractor's labour,
material, tools, plant, all lead, lift and crossing
of tracks etc. complete and as directed by the
Engineer in-charge.
Item- 4 Extension of Bridge No M-300 at TTP Ballast Depot
S No. Item Description of Item Unit Qty Rate Amount
Earthwork in excavation by mechanical means
(Hydraulic Excavator)/Manual Means for
foundations and floors of the bridges,
retaining walls etc. including setting out,
dressing of sides, ramming of bottom, getting
out the excavated material, back filling in
layers with approved material and
consolidation of the layers by ramming and
watering etc. including all lift, disposal of
surplus soil up to a lead of 300m, all types of
shoring and strutting with all labour and
material complete as per drawing and
technical specification as directed by Engineer
in charge. Note: This item will be used for
excavation work in connection with other
miscellaneous works also like side drains,
foundation for OHE masts and other
miscellaneous structures in connection with
Gauge Conversion, Doubling, New lines.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
2 022040 Providing and laying in position machine cum 10.00 4561.69 45616.90
batched, machine mixed and machine
vibrated Cement Concrete of specified grade
as per approved Design Mix (mixed in Mobile
Concrete Batching/Mixing Plant at site or RMC
from approved plants) using 20mm graded
crushed stone aggregate and coarse sand of
approved quality in RCC raft foundation & Pile
cap including finishing, using Plasticiser in
approved proportions (as per IS:9103), to
modify workability without impairing strength
and durability complete as per specifications
and direction of the Engineer in charge. Note:
1. Payment for cement, reinforcement and
shuttering shall be made extra under relevant
item. 2. Plasticiser shall invariably be used in
approved proportion to increase workability
with minimum possible quantity of cement for
all grade of Design Mix Concrete unless it is
specifically approved citing reasons for not
using plasticiser at the stage of Mix Design
and in that case deduction shall be made as
per relevant item.
Providing and laying in position machine
batched, machine mixed and machine
vibrated Cement Concrete of specified grade
as per approved Design Mix (mixed in Mobile
Concrete Batching/Mixing Plant at site or RMC
from approved plants) using 20mm graded
crushed stone aggregate and coarse sand of
approved quality for the following Reinforced
cement concrete structural elements up to
height of 9.0 m from foundation top level,
including finishing, using Plasticiser in
approved proportions (as per IS:9103), to
modify workability without impairing strength
and durability complete as per specifications
and direction of the Engineer in charge. Note:
1. Payment for cement, reinforcement and
shuttering shall be made extra under relevant
item. 2. Plasticiser shall invariably be used in
approved proportion to increase workability
with minimum possible quantity of cement for
all grade of Design Mix Concrete unless it is
specifically approved citing reasons for not
using plasticiser at the stage of Mix Design
and in that case deduction shall be made as
per relevant item.
4 022060 Providing and laying Plain Cement Concrete cum 30.00 4630.33 138909.90
1:3:6 with graded stone aggregate of 40mm
nominal size, in foundation and floors,
retaining walls of bridges including
mechanical mixing, vibrating, pumping and
bailing out water where ever required with all
materials and labour complete but excluding
the cost of cement and shuttering as per
drawings and technical specifications as
directed by Engineer.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
5 024010 P r o v id in g and casting machine batched, cum 230.00 5017.86 1154107.80
machine mixed and machine vibrated Cement
Concrete of specified grade as per approved
Design Mix, mixed in Mobile Concrete
Batching/Mixing Plant at site or RMC from
approved plants, (Cast in-Situ/Pre-cast) in
bottom/top slab, side walls, toe wall and
sumps haunch filling head walls, thrust bed or
any other component using 20mm graded
crushed stone aggregate and coarse sand of
approved quality of RCC box of any size
including finishing, Plasticiser in approved
proportions (as per IS:9103), to modify
workability without impairing strength and
durability, complete as per drawings and
technical specifications as directed by
Engineer in charge. N o t e : 1. Payment for
cement, reinforcement and shuttering shall be
made extra under relevant item. 2. Plasticiser
shall invariably be used in approved
proportion to increase workability with
minimum possible quantity of cement for all
grade of Design Mix Concrete unless it is
specifically approved citing reasons at the
stage of Mix Design and in that case
deduction shall be made as per relevant item.
6 024020 Providing and laying in position machine cum 11.00 4561.69 50178.59
batched, machine mixed and machine
vibrated Design Mix Cement Concrete, mixed
in Mobile Concrete Batching/Mixing Plant at
site or RMC from approved plants, of specified
grade (cast in-situ) using 20mm graded
crushed stone aggregate and coarse sand of
approved quality in Drop and curtain wall and
alike structures below bed level, complete in
all respect as per drawings and technical
specifications to the satisfaction of Engineer-
i n - C h a r g e . Note: Payment for cement,
reinforcement and shuttering shall be made
Centering and shuttering including strutting,
propping etc. and removal of form for :
7 025031 All types of bridge sub-structures, e.g. pier, Sqm 992.00 765.08 758959.36
abutment, wing wall, retaining wall, RCC box
type foundations, Abutment cap, Pier Cap,
Inspection Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc. up to 5m
above ground level
Supply and using Cement at Worksite
8 025071 Ordinary Portland Cement 43 grade approved MT 119.00 9089.61 1081663.59
Supply of steel reinforcement of approved
brands/makes for R.C.C. work including
straightening, cutting, bending, placing in
position and binding all complete.
9 025082 Thermo-Mechanically Treated bars of grade Kg 17320.00 102.59 1776858.80
Fe-500D or more of approved brands/makes.
10 052030 Supply and laying of quarry dust including cum 30.00 2052.25 61567.50
consolidation, supply of all materials, labour,
lead, lift, tools, plants, crossing of tracks as
per drawing and technical specification as
directed by the Engineer in charge in case
loose slush is encountered at site of
foundation before casting the foundation or
laying the filtering media.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
11 052210 Providing cast in situ bridge number plaques Each 2.00 1001.17 2002.34
as per Railway drawing in cement concrete
1:2:4 mix using 20mm hard stone aggregate
embedded in 30mm notch in Bridge parapet
coping duly engraving the letter and figures
and an arrow indicating the direction of flow
and finishing the top exposed surface with
cement mortar 1:3, painting letters and
figures with two coats of black enamel paint
on two coats of white background with all
labour, tools, cement, paint etc. with all leads
Item- 5 Earth Filling of Low-Lying Areas at VM Ballast Depot
S No. Item Description of Item Unit Qty Rate Amount
Earthwork in filling in embankment, guide
bunds, around buried type abutments, bridge
gaps, trolley refuges, platforms etc. with
contractor's own earth conforming to Soil
Quality Class SQ1/SQ2/SQ3, after preparation
of foundations as applicable, benching in
existing banks wherever required, spreading
in layers with motor grader, bringing the
moisture content to OMC, mechanical
compaction to specified density a n d dressing
of bank to final profile as per RDSO
Specifications: RDSO/2020/GE: IRS-0004 with
latest correction slips. Note: 1) Foundation
preparation, Benching including additional
earthwork on account of this, wherever
required, shall be paid extra under relevant
schedule item for benching. 2) Payment for
Earthwork under this item shall be made
based on the cross section measurements
calculated (i) with original ground profile of
existing bank based on initial ground levels
before doing benching and (ii) final profile of
the bank worked out with final levels as per
prevailing guidelines.
Hiring of machinery for minor miscellaneous
works for short duration including
operator/driver, fuel, lubricants and
consumable. The contractor shall arrange all
statutory permits as required by rules and
regulations prevailing in the area of work.
Payment shall be made for actual working
2 211201 JCB Backhoe Loaders 3DX Plus or similar with Hour 150.00 867.49 130123.50
minimum 1.10 cum bucket capacity
Item- 6 Extension of Ballast Siding at VM Ballast Depot
S No. Item Description of Item Unit Qty Rate Amount
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Earthwork in cutting in formation, trolley
refuges, side drains, level crossing
approaches, platforms, catch water drains,
diversion of nallah & finishing to required
dimension and slopes to obtain a neat
appearance to standard profile inclusive of all
labour, materials, plant & machinery, leading
all cut spoils either to make spoil dumps or for
filling in embankment with leads within 2 km
on either side of edge of the cutting(s)
including all lifts, ascent, descent, loading,
unloading, bailing & pumping out water, if
required, clearance of site and all other works
incidental thereto for completing the work as
per RDSO Specification No. RDSO/2020/GE:
IRS-0004 with latest updated correction slips
and to the satisfaction of the Engineer-in-
Charge. Note: (i) All usable earth arising from
cut spoils shall be led into bank formation and
Unusable spoils shall be dumped / stacked
away from toe of embankment. (ii) All hard
rock /and boulders not fit for filling will be
stacked by the contractor and will be property
of the Railways. (iii)Cut trees shall be property
of Railways and to be deposited in the railway
godown unless specified otherwise in the
Conditions of Contract.
1 012011 In all conditions and classifications of soil cum 15.00 106.09 1591.35
Gas cutting of rail of various sections with
contractor's tools & plants, as directed by
engineer in-charge :
3 071030 Dismantling the existing BG Buffer-stop laid Set 1.00 5818.47 5818.47
with rails & wooden/ST sleepers including
leading the dismantled Buffer stop materials
to nominated places within station yard limits
and stacking as material-wise and
classification-wise duly releasing all fittings
carefully without causing any damage with all
contractor's labour, tools, with all lead and
lifts, crossing of tracks if any, etc., complete
as directed by the Engineer-in-charge.
4 083030 Boxing and profiling of ballast as per TRM 15.00 29.22 438.30
procedure prescribed in latest edition of
IRPWM including cess dressing on both sides
of track. The work will include removing
excess ballast from track and putting the
same in crib and shoulder by leading to a
maximum of 50m including crossing of track,
deweeding on ballast section etc and as
directed by Engineer-In charge.
5 123030 Spreading of ballast, from existing stacks cum 30.00 49.15 1474.50
available along formation on top or at cess, in
required uniform thickness, compaction of
ballast layer laid on new formation at all the
locations with smooth wheeled power roller of
8-10 tonne capacity to sufficient number of
passes to form consolidated ballast bed of
approximately 250mm thickness to a width of
4m symmetrical to centre line of proposed
track in correct line & level with all ascents &
descents, as directed by Engineer in-charge.
Note: Item is inclusive of (a) providing ramp
for taking roller to formation and removing the
same & making good formation after
completion of work; (b) redistribution &
leveling of excess ballast while rolling to
obtain uniform plane cambered surface.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Linking of BG track (except at LC, Bridges and
SEJs) with any type of rail section and sleeper
of specified density, on ballast bed spread and
compacted with suitable roller, over prepared
formation including leading free rails/welded
panels available along the alignment on to
formation, leading and spreading all fittings
and fastenings, spreading of sleepers at
specified spacing, squaring, placing of rails
over sleepers and fixing rails to sleepers with
all types of fittings and fastenings to correct
gauge & alignment, lubrication of fittings and
fastenings with contractor's grease as per
IRPWM standards with contractors labour,
tools, consumables, with all lead, lifts etc.
complete and raising, levelling and initial
packing of track to make it fit for 30 kmph and
meet other prerequisites prescribed in Indian
Railway Track Machine Manual for deployment
of Tamping Machine. Note: 1.Rail cutting and
Hole drilling shall be paid separately.
2.Spreading of ballast and compaction shall
be paid separately under relevant item.
6 123041 For sleeper density of 1660 sleepers per km TRM 15.00 351.76 5276.40
Through packing of track, as per procedure
prescribed in latest edition of Indian Railways
Permanent Way Manual
7 131011 For PSC sleeper Track with Sleeper Density of TRM 15.00 115.94 1739.10
1540 Sleepers/Km or more
Anti-corrosive painting of rail on running track
of any sleeper density on web, foot etc.
including liner contact area (excluding bottom
of foot) and fishing plane as per requirement
with two coats of thickness of 100 microns
each by bituminous black paint confirms to IS-
9862 of reputed make including painting of
liners, ERCs and including surface
preparation, as a complete job as per
procedure prescribed in latest edition of
IRPWM Note: 60% of payment shall be made if
painting on only gauge face side is done.
Quick cutting with abrasive rail cutter of all
types of rail sections including wear resistant,
head hardened rails up to 110 UTS, with
contractors tools & plants, equipment,
consumable with all lead & lift etc. complete
as directed by Engineer in-charge. Abrasive
Rail Cutter will be as per RDSO Specification
No. TM/SM/1 (Rev. 01 of 2012) with latest
status of RDSO; Rail Cutting Wheel Abrasive
Disc will be as per RDSO Specification
No.TM/SM/2 (Rev. 01 of 2020)
Drilling holes of 16 mm to 32 mm dia. with
Rail Drilling machine including chamfering
with appropriate chamfering tools in all types
of rail section with contractor's tools & plants,
equipment, consumable with all lead & lift etc.
complete, as directed by Engineer in-charge.
Rail Drilling Machine will be as per RDSO
Specification No. TM/SM/3, dated 24.04.1991.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
13 161050 Drilling holes of specified size for bond holes Each 20.00 53.93 1078.60
with 7.2mm dia drill twist to correct spacing
and location on 60kg/52kg rails on cess or
under traffic block with contractor's tools and
plant, equipment, consumable, labour etc
complete as directed by the Engineer in
charge at site.
Loading of rails of any section and length up
t o 1 3 metres in Wagons / Truck / trailer
including lead up to 50 metres and lift up to 5
14 171014 I n Wagon where mechanical handling is MT 3.00 165.78 497.34
possible and traffic block is not required or in
Loading, leading and unloading of 52Kg / 60Kg
rail up to 13 metre length by Railway's Rail
Dolly / Dip Lorry to the nominated location
under traffic with line protection in case road
carriage is not possible with different lead
with a lift up to 5 metre during block period.
Km for every subsequent Km or part thereof
and up to 10 Km
Unloading of rails of any section and length up
to 13 metre, in neat manner for Railway
usage from departmental material train (DMT)
or contractor's / Railway's Truck/trailer
including lead up to 50 metre, lift up to 5
metre and stacking in prescribed manner.
17 171053 From Wagon where mechanical handling is MT 3.00 121.63 364.89
possible and traffic block is not required or in
Truck / trailer.
Loading, leading and unloading of PSC
Sleepers of 52Kg / 60Kg by Railway's Rail
Dolly/ Dip Lorry to the nominated location
under traffic in case road carriage is not
possible for different leads and lift up to 5
Km for every subsequent Km or part thereof
and up to 10 Km
Loading, leading and unloading of all types of
P.Way fittings and all other miscellaneous
material except Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: Lead shall
be the shortest motorable road length
between the points of loading and unloading.
Transportation of Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: 1. Lead shall
be the shortest motorable road length
between the points of loading and unloading.
2. Loading and unloading shall be paid extra
under relevant items.
TRICHCHIRAPPALLI DIVISION-ENGG/SOUTHERN RLY
Unloading of 52kg / 60kg PSC line and special
sleepers up to 2.75 metre length in Depot /
Station / Mid-section between stations in neat
manner for Railway usage from departmental
material train (DMT) or contractor's / Railway's
Truck/Trailer with crane or any other means
including crossing of one track and lead up to
250 metre & lift up to 5 metre with
contractor's labour, tools & plants, machinery,
consumables etc. Note: In case of any
damage to sleeper during loading, penalty @
50% of the all inclusive cost of sleeper shall
24 211250 Manufacturing and fixing buffer stop with Each 1.00 17110.32 17110.32
Railway supplied rails, cutting, including
bending of rails as per plan ,with all
contractor's labour, materials, tools, plants
etc. and all lead and lift including crossing of
track where necessary and as directed by
Engineer in charge at site. Note: Excavation,
fixing rails in cement concrete, drilling of
holes will be paid separately.
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .