Loading…
Loading…
14 results • Latest
Carrying out POH schedule related works of various equipments of Mark III/Mark IV Tower Wagon as per scope of work at EMU Workshop, Mahalaxmi.
ROH of wagons at STA Depot
Provision of Power supply arrangement and associated works due to proposed of ROB at Nishatpura. (Electrical work)
Shifting of goods shed of BAQ to BET. (Electrical work)
Kota division-Replacement of over aged Contact Wire, over aged Cantilever assembly and shifting of OHE on new feeder mast on main line in ADEE/TRD/BTE section. (300 TKM)
Palakkad Division - Replacement of steel OHT with RCC OHT- 45 KL capacity -06 Nos. at Sr.Divisional Engineer/West/Palakkad Jurisdiction.
Removal of vegetation, bushes in midsection along side track in between the tracks, side drain, catch water drain cleaning & trimming of tree branches in Senior Section Engineer/Permanent Way/Shoranur Section for a period of 1 year.
Palakkad Division - Repairs to roof of service buildings, station buildings and allied buildings in Senior Section Engineer/Works/Palakkad jurisdiction.
Palakkad Division- strengthening of steel girder bridges (27 nos) under Sr.Divsional Engineer/West/ Jurisdiction.
Repairs to Gutters and Replacement of damaged AC sheet roofing with colour coated sheet in Platform shelter in Senior Section Engineer/Works/Thanjavur and Thiruvarur sections.
Providing housekeeping and hospitality services for Officers Rest House at Kumbakonam and Nagapattinam stations for a period of two years.
Raising of medium level platform into high level platform at various nine stations in Senior Section Engineer/Works/Thanjavur section.
Improvements to ballast siding including earth work in forming ballast depot, track work for extension of ballast siding, construction of bridges and retaining wall at Tiruturaipundi and Villupuram stations.
Raising of medium level platform into high level platform at four stations in Senior Section Engineer/Works/Lalgudi section.