Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | L1 | Accepted-AOC AGREEMENT EXECUTED |
| Sl No | Description | Qty | Unit | VASUDEVAN V V L1 |
|---|---|---|---|---|
| 1.00Septic Tank Construction | ||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 40 | sqm | 8.66 ₹346.4 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 67.53 | cum | 240.45 ₹16,237.83 Lowest |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 28.12 | cum | 122.28 ₹3,438.76 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.38 | cum | 7,404.03 ₹17,614.19 Lowest |
| 1.00 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 1,589.05 | kg | 104.93 ₹1,66,739.33 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 4.85 | sqm | 360.41 ₹1,747.99 Lowest |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 91.85 | sqm | 783.63 ₹71,976.42 Lowest |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 11 | sqm | 897.16 ₹9,868.76 Lowest |
| 1.01 | OD332960/2025-2026:Demolishing laterite masonry manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50metres lead as per direction of Engineer - in - Charge in cement mortar (Modified DAR 15.7.4) | 3.45 | cum | 1,987.85 ₹6,850.13 Lowest |
Tender Value
₹4.2 L
EMD Value
₹10,586
Closing Date
17 Feb 2026, 3:00 pmClosed
Assistant Engineer
LID and EW Sub Division Kalliasseri Block Panchayath
New construction
2026_LSGD_832729_1
AEE/KLSY/PROJ NO 208/26 RETEN2
Open Tender
Civil Works - Others
Item Rate
180 days
Kalliasseri
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,586
Yes
3 Jul 2026
10 Feb 2026
19 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Septic Tank Construction | |||||
| 1.001 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.4 | cum | - | - |
| 1.003 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 1 | cum | - | - |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 0.2 | kg | - | - |
| 1.006 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 1.007 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 1 | sqm | - | - |
| 1.008 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | - | sqm | - | - |
| 1.009 | OD332960/2025-2026:Demolishing laterite masonry manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50metres lead as per direction of Engineer - in - Charge in cement mortar (Modified DAR 15.7.4) | - | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1399905.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
PRELIMINARYAGREEMENT.pdf
Tender Documents • 0.34 MB
EPAY.pdf
Tender Documents • 0.24 MB
INTEGRITY.pdf
Tender Documents • 0.24 MB
AFFIDAVIT.pdf
Tender Documents • 0.16 MB
FORMOFTENDER.pdf
Tender Documents • 0.20 MB
BOQ_1399905.xls
BOQ • 0.32 MB
SBD.pdf
Tender Documents • 2.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .