Loading…
Loading…
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
28 Aug 2026, 6:00 pm2d left
GE (AF) BARODA
GE (AF) BARODA ,DARJIPURA , GUJARAT-390022
REPAIRS/REPLACEMENT AND DAY TO DAY PERIODICAL MAINTENACE OF RO PLANT AND STP AT MAKARPURA AT AFS VADODARA
2026_MES_781939_1
8205/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
MAKARPURA, GUJARAT-390014
AS PER NIT
9 documents required · 9 mandatory
₹500
GE (AF) BARODA
₹40,000
Yes
28 Aug 2026
31 Jul 2026
31 Aug 2026
31 Jul 2026
28 Aug 2026
14 Aug 2026
1 Aug 2026 - 8 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling/taking out non clogg submersible sewage pump set complete 7.5 HP and carrying out including repair/replacement for defective parts such as bearing, shaft sleeves, gland plate, impeller, including replacement of worn out nuts, bolts, filling of pump oil heavy grade , greasing of bearing, replacement of gaskit/ mechanical seal, rotor shaft job, shaft coupling, spider etc or any other part and reassmebling, testing & commissioning complete making it smooth functioning complete all as specified and directed.
Note :
1. Rates for making arrangement for lifting up the non clogg sewage pump from inside well shall deemed to be included in quoted rates.
2. Once the motor pump set repaired, the contractor shall by default get the bearing, and other necessary parts changed and shall remain responsible for proper functioning of motor pump.
3. The contractor should get the repairing work done at the installation site in presence of MES rep and only the rewinding and rotor job to be done outside defence land. | 2 | EACH JOB | - | - |
| 2 | Dismantling/taking out non clogg submersible sewage pump set complete 5 HP and carrying out including repair/replacement for defective parts such as bearing, shaft sleeves, gland plate, impeller, including replacement of worn out nuts, bolts, filling of pump oil heavy grade , greasing of bearing, replacement of gaskit/ mechanical seal, rotor shaft job, shaft coupling, spider etc or any other part and reassmebling, testing & commissioning complete making it smooth functioning complete all as specified and directed.
Note :
1. Rates for making arrangement for lifting up the non clogg sewage pump from inside well shall deemed to be included in quoted rates.
2. Once the motor pump set repaired, the contractor shall by default get the bearing, and other necessary parts changed and shall remain responsible for proper functioning of motor pump.
3. The contractor should get the repairing work done at the installation in presence of MES rep and only the rewinding and rotor job to be done outside defence land. | 1 | EACH JOB | - | - |
| 3 | M & L rewinding to motor stator winding of capacity 7.5 HP non-clog submersible pump set, 3 phase by using best quality super enamelled copper winding wire of existing gauge and existing Nos of turns including varnishing for 'F' class insulation and drying in heat chamber and refixing testing, commissioning complete so as to have same RPM, complete all as specified and directed | 2 | EACH JOB | - | - |
| 4 | M & L rewinding to motor stator winding of capacity 5 HP non-clog submersible pump set, 3 phase by using best quality super enamelled copper winding wire of existing gauge and existing Nos of turns including varnishing for 'F' class insulation and drying in heat chamber and refixing testing, commissioning complete so as to have same RPM, complete all as specified and directed | 1 | EACH JOB | - | - |
| 5 | Dismantling / taking out non clog centrifugal/monoblock sewage pump set complete 5 HP and carrying out including repair/replacement for defective parts such as bearing, shaft sleeves, gland plate, impeller, including replacement of worn out nuts, bolts, filling of pump oil heavy grade , greasing of bearing, replacement of gaskit/ mechanical seal, rotor shaft job, shaft coupling, spider etc or any other part complete all as directed and reassmebling, testing & commissioning complete making it smooth functioning complete all as specified and directed.
Note:- 1. Rates for making arrangement for lifting up the non clogg sewage pump from inside well shall deemed to be included in quoted rates. 2. Once the motor pump set repaired, the contractor shall by default get the bearing, and other necessary parts changed and shall remain responsible for proper functioning of motor pump.
3. The contractor should get the repairing work done at the installation site in presence of MES rep and only the rewinding and rotor job to be done outside defence land. | 4 | EACH JOB | - | - |
| 6 | Dismantling/taking out non clog centrifugal/monoblock sewage pump set complete 7.5 HP and carrying out including repair/replacement for defective parts such as bearing, shaft sleeves, gland plate, impeller, including replacement of worn out nuts, bolts, filling of pump oil heavy grade , greasing of bearing, replacement of gaskit/ mechanical seal, rotor shaft job, shaft coupling, spider etc or any other part complete all as directed and reassmebling, testing & commissioning complete making it smooth functioning complete all as specified and directed.
Note:-1. Rates for making arrangement for lifting up the non clogg sewage pump from inside well shall deemed to be included in quoted rates.
2. Once the motor pump set repaired, the contractor shall by default get the bearing, and other necessary parts changed and shall remain responsible for proper functioning of motor pump.
3. The contractor should get the repairing work done at the installation site in presence of MES rep and only the rewinding and rotor job to be done outside defence land. | 1 | EACH JOB | - | - |
| 7 | Dismantling/taking out non clog centrifugal/monoblock sewage pump set complete 12 HP and carrying out including repair/replacement for defective parts such as bearing, shaft sleeves, gland plate, impeller, including replacement of worn out nuts, bolts, filling of pump oil heavy grade , greasing of bearing, replacement of gaskit/ mechanical seal, rotor shaft job, shaft coupling, spider etc or any other part complete all as directed and reassmebling, testing & commissioning complete making it smooth functioning complete all as specified and directed.
Note:- Rates for making arrangement for lifting up the non clogg sewage pump from inside well shall deemed to be included in quoted rates. 2. Once the motor pump set repaired, the contractor shall by default get the bearing, and other necessary parts changed and shall remain responsible for proper functioning of motor pump.
3. The contractor should get the repairing work done at the installation site in presence of MES rep and only the rewinding and rotor job to be done outside defence land. | 1 | EACH JOB | - | - |
| 8 | M & L for Dismantling/taking out motor stator for rewinding of capacity 5 HP motor of monoblock set, 3 phase by using best quality super enamelled copper winding wire of existing gauge and existing Nos of turns including varnishing for 'F' class insulation and drying in heat chamber and refixing testing, commissioning complete so as to have same RPM, complete all as specified and directed. | 2 | EACH JOB | - | - |
| 9 | M & L for Dismantling/taking out motor stator for rewinding of capacity 7.5 HP motor of monoblock set, 3 phase by using best quality super enamelled copper winding wire of existing gauge and existing Nos of turns including varnishing for 'F' class insulation and drying in heat chamber and refixing testing, commissioning complete so as to have same RPM, complete all as specified and directed. | 1 | EACH JOB | - | - |
| 10 | M & L for Dismantling/taking out motor stator for rewinding of capacity 12 HP motor of monoblock set, 3 phase by using best quality super enamelled copper winding wire of existing gauge and existing Nos of turns including varnishing for 'F' class insulation and drying in heat chamber and refixing testing, commissioning complete so as to have same RPM, complete all as specified and directed. | 1 | EACH JOB | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
BOQ_875978.xls
BOQ • 0.46 MB
8205PS.pdf
Tender Documents • 1.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].