| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-AOC CHERUVANNUR STAMP VENDOR A P F MOHAMMED | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical 1505 SUB TREASURY TIRU | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | M IBRAHIMKUTTY L1 | KRISHNADAS M L2 |
|---|---|---|---|---|---|
| 1.00Building maitenance | |||||
| 1.00 | 15.13.1:Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area 3 sq. metres and below | 10 | each | 142 ₹1,420 Lowest | 144 ₹1,440 |
| 1.00 | OD163388/2025-2026:Demolishing Laterite masonry work manually / by mechanical means including
stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per
direction of Engineer-in-Charge.
In mud mortar | 11.77 | cum | 701 ₹8,252.17 Lowest | 711 ₹8,369.89 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 20.25 | sqm | 735 ₹14,883.75 Lowest | 777 ₹15,734.25 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.26 | cum | 10,115 ₹22,849.79 Lowest | 10,115 ₹22,849.79 Lowest |
| 1.00 | 50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 11.42 | cum | 8,713 ₹99,528.6 Lowest | 8,713 ₹99,528.6 Lowest |
| 1.01 | OD163386/2025-2026:Laterite masonry using Deptl: Laterait with neatly dressed laterite stone of size 40x20x15cm or nearest size in cement mortar 1:6 for superstructure above plinth level up to floor two levels including all cost of materials,labour charges etc- | 3.81 | cum | 4,391 ₹16,729.71 Lowest | 4,500 ₹17,145 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 301.8 | kilogram | 109 ₹32,896.2 Lowest | 111 ₹33,499.8 |
| 1.01 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 11.22 | sqm | 985 ₹11,051.7 Lowest | 985 ₹11,051.7 Lowest |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1.92 | cum | 12,963 ₹24,888.96 Lowest | 12,963 ₹24,888.96 Lowest |
Tender Value
₹3.3 L
EMD Value
₹8,257
Closing Date
10 Oct 2025, 5:00 pmClosed
DEEPTHY SATHEESH
0FFICE OF ASSISTANT ENGINEER TBP
Vanitha Canteen Naveekaranam Project No 156/26
2025_LSGD_804447_2
AE/TBP/Tender4//2025-26
Open Tender
Civil Works - Buildings
Item Rate
300 days
TIRUR BLOCK PANCHAYATH
Please refer Tender documents.
7 documents required · 7 mandatory
₹730
Yes
₹8,257
Yes
11 Nov 2025
3 Oct 2025
13 Oct 2025
3 Oct 2025
10 Oct 2025
3 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1338442.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .