Tender Value
₹45.0 L
EMD Value
₹90,099
Closing Date
19 Jul 2024, 5:00 pmClosed
EXECUTIVE OFFICER, DHUBRI MUNICIPAL BOARD
OFFICE OF THE DHUBRI MUNICIPAL BOARD
Development of Sanitary Landfill at Dawbangi under Rupsi Development Block under both Dhubri Municipal Board and Gauripur Municipal Board as per DPR
2024_UDD_37816_1
No. DMB/SBM(U)/2.0/2023-24/266
Open Tender
Civil Works - Others
Item Rate
180 days
DAOBHANGI UNDER RUPSI DEV BLOCK
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹90,099
Yes
OFFICE OF THE DHUBRI MUNICIPAL BOARD
7 Dec 2024
1 Jul 2024
20 Jul 2024
2 Jul 2024
19 Jul 2024
2 Jul 2024
12 Jul 2024
Development of Sanitary Landfill 14.85m x 50m x 4m
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub
Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete.
Procuring, supplying, transporting to site, unloading, stacking of 6.6 mm, 4kg/sqm needle punched reinforced composite geosynthetic clay liner comprised of uniform layer of sodium bentonite encapsulated between a woven and nonwoen geotextile of approved quality, size and make as detailed in material specifications, quality assurance plan & drawings on bottom and side liner. Supply and laying of GCL liner material at site
Procuring, supplying, transporting to site, unloading, stacking of 1.5 mm thick HDPE sheet of approved quality, size and make as detailed in material specifications, quality assurance plan & drawings on bottom and side liner. Supply, laying and welding of 1.5mm both side textured HDPE liner material at site
Supplying & laying of drainage composite for use behind walls, between two different fills, alongside drains of road, below concrete lining of canals etc. Geocomposite for planar drainage, realized by thermobonding a draining core in extruded monofilaments with two filtering nonwoven geotextiles that may also be working as separation or protecting layers. The draining three dimensional core will have a “W” configuration as longitudinal parallel channels. Minimum thickness to be 7.2mm, with two filtering UV stabilized polypropylene nonwoven geotextile of minimum thickness of 0.75mm charecteristic opening size (O90) of 110 micron and tensile strength of 8.0 kN/m that will be working as separation or protecting layer, geocomposite having in plane flow capacity of 2.1 L / (m.s) at hydraulic gradient of 1.0 & 20 kPa pressure and tensile strength of 18 kN/m , with mass per unit area of 740 gsm, supplied in the form of roll for easy transportation to site of work as per detailed specification all complete as per directions of Engineer in charge.
Providing, Laying, Jointing & field testing of HDPE pipes (High Density Polyethylene Pipes-PE 100) confirming to IS 4984/2016 (with up to date amendment) with necessary jointing material like mechanical connector of jointing pipes by heating the ends of pipes with the help of Teflon coated electric mirror/ heater to the required temperature and then pressing the ends together against each other, to form a monolithic & leak proof joint by thermosetting process. It may be required to be done with Jack/ Hydraulic Jacks/ Butt fusion machine.(50 mm & above fusion jointed & below 50mm mechanical jointed). The HDPE fitting should be ISI marked conforming to relevant BIS code 160 mm dia HDPE PN6
140 mm dia HDPE PN6
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)
Construction of RCC UG Sump Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
Submersible Pump (2 HP)
Construction of Stormwater Drain Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)
12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand)
Annual Maintenance Cost (AMC)
AMC for the Period of (5) years for the supplied technologies, machineries, tools & equipment.
Operation and Maintenance (O&M)
O & M for the Period of (5) years for the entire project
POWERTON ENGINEERING PVT LTD
POWERTON ENGINEERING PVT LTD
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .